Tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and construction method

The invention relates to the field of tunnel construction, and particularly discloses a tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and a constructionmethod. The tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring for...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUO BAOKU, GONG GANG, WANG SHUANGMAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GUO BAOKU
GONG GANG
WANG SHUANGMAO
description The invention relates to the field of tunnel construction, and particularly discloses a tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and a constructionmethod. The tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and the construction method comprises the following steps that 1, sprayed rock surface treatment is carried out; 2, concrete mixing and transportation are carried out; 3, a tunnel wall is closed; 4, a pouring formwork is in place; 5, pouring operation is carried out; and 6, maintenance is carried out. A jacking cylinder is used, a plurality of arc pouring frameworks are subjected to jacking and pouring in sequence on two sides at the same time, the construction efficiency is high, springback is greatly avoided, and time and resources are saved. 本发明涉及隧道施工领域,具体公开了隧道锚喷支护混凝土整体式分段灌注模板及施工方法,具体步骤如下:第步:受喷岩面处理,第二步:混凝土搅拌、运输,第三步:封闭洞壁,第四步:灌注模板到位,第五步:灌注作业,第六步:养护。本方法通过顶升油缸将若干弧形灌注模板依次顶升灌注,两侧同时进行,施工率高,并且极大程度上避免了回弹,节约了时间和资源。
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108442941A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108442941A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108442941A3</originalsourceid><addsrcrecordid>eNqNjLEOwjAQQ7swIOAfwgdUotABRlSBmJi6V1F6bSOSu-hyEeLvaSM-gMnPlu11kdqECE5pNBOxxXGmXsWJxDDI4mMKgTijIVxSUBYFRtaulE8AFWH0gKKdCpTyx0Ds38SvfDavonAyYgmVB5mo3xarQbsIu59uiv391jaPEgJ1EIM2gCBd86wO57o-Xurqevqn8wXPBUb3</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and construction method</title><source>esp@cenet</source><creator>GUO BAOKU ; GONG GANG ; WANG SHUANGMAO</creator><creatorcontrib>GUO BAOKU ; GONG GANG ; WANG SHUANGMAO</creatorcontrib><description>The invention relates to the field of tunnel construction, and particularly discloses a tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and a constructionmethod. The tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and the construction method comprises the following steps that 1, sprayed rock surface treatment is carried out; 2, concrete mixing and transportation are carried out; 3, a tunnel wall is closed; 4, a pouring formwork is in place; 5, pouring operation is carried out; and 6, maintenance is carried out. A jacking cylinder is used, a plurality of arc pouring frameworks are subjected to jacking and pouring in sequence on two sides at the same time, the construction efficiency is high, springback is greatly avoided, and time and resources are saved. 本发明涉及隧道施工领域,具体公开了隧道锚喷支护混凝土整体式分段灌注模板及施工方法,具体步骤如下:第步:受喷岩面处理,第二步:混凝土搅拌、运输,第三步:封闭洞壁,第四步:灌注模板到位,第五步:灌注作业,第六步:养护。本方法通过顶升油缸将若干弧形灌注模板依次顶升灌注,两侧同时进行,施工率高,并且极大程度上避免了回弹,节约了时间和资源。</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180824&amp;DB=EPODOC&amp;CC=CN&amp;NR=108442941A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180824&amp;DB=EPODOC&amp;CC=CN&amp;NR=108442941A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GUO BAOKU</creatorcontrib><creatorcontrib>GONG GANG</creatorcontrib><creatorcontrib>WANG SHUANGMAO</creatorcontrib><title>Tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and construction method</title><description>The invention relates to the field of tunnel construction, and particularly discloses a tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and a constructionmethod. The tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and the construction method comprises the following steps that 1, sprayed rock surface treatment is carried out; 2, concrete mixing and transportation are carried out; 3, a tunnel wall is closed; 4, a pouring formwork is in place; 5, pouring operation is carried out; and 6, maintenance is carried out. A jacking cylinder is used, a plurality of arc pouring frameworks are subjected to jacking and pouring in sequence on two sides at the same time, the construction efficiency is high, springback is greatly avoided, and time and resources are saved. 本发明涉及隧道施工领域,具体公开了隧道锚喷支护混凝土整体式分段灌注模板及施工方法,具体步骤如下:第步:受喷岩面处理,第二步:混凝土搅拌、运输,第三步:封闭洞壁,第四步:灌注模板到位,第五步:灌注作业,第六步:养护。本方法通过顶升油缸将若干弧形灌注模板依次顶升灌注,两侧同时进行,施工率高,并且极大程度上避免了回弹,节约了时间和资源。</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEOwjAQQ7swIOAfwgdUotABRlSBmJi6V1F6bSOSu-hyEeLvaSM-gMnPlu11kdqECE5pNBOxxXGmXsWJxDDI4mMKgTijIVxSUBYFRtaulE8AFWH0gKKdCpTyx0Ds38SvfDavonAyYgmVB5mo3xarQbsIu59uiv391jaPEgJ1EIM2gCBd86wO57o-Xurqevqn8wXPBUb3</recordid><startdate>20180824</startdate><enddate>20180824</enddate><creator>GUO BAOKU</creator><creator>GONG GANG</creator><creator>WANG SHUANGMAO</creator><scope>EVB</scope></search><sort><creationdate>20180824</creationdate><title>Tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and construction method</title><author>GUO BAOKU ; GONG GANG ; WANG SHUANGMAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108442941A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>GUO BAOKU</creatorcontrib><creatorcontrib>GONG GANG</creatorcontrib><creatorcontrib>WANG SHUANGMAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GUO BAOKU</au><au>GONG GANG</au><au>WANG SHUANGMAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and construction method</title><date>2018-08-24</date><risdate>2018</risdate><abstract>The invention relates to the field of tunnel construction, and particularly discloses a tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and a constructionmethod. The tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and the construction method comprises the following steps that 1, sprayed rock surface treatment is carried out; 2, concrete mixing and transportation are carried out; 3, a tunnel wall is closed; 4, a pouring formwork is in place; 5, pouring operation is carried out; and 6, maintenance is carried out. A jacking cylinder is used, a plurality of arc pouring frameworks are subjected to jacking and pouring in sequence on two sides at the same time, the construction efficiency is high, springback is greatly avoided, and time and resources are saved. 本发明涉及隧道施工领域,具体公开了隧道锚喷支护混凝土整体式分段灌注模板及施工方法,具体步骤如下:第步:受喷岩面处理,第二步:混凝土搅拌、运输,第三步:封闭洞壁,第四步:灌注模板到位,第五步:灌注作业,第六步:养护。本方法通过顶升油缸将若干弧形灌注模板依次顶升灌注,两侧同时进行,施工率高,并且极大程度上避免了回弹,节约了时间和资源。</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN108442941A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Tunnel anchoring and shotcreting supporting concrete integral-type segmental pouring formwork and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T02%3A31%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GUO%20BAOKU&rft.date=2018-08-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108442941A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true