Cable management method and test device
The invention provides a cable management method and a test device. The method comprises the steps of establishing a test engineering, selecting a first test cable and a device to be tested, and linking the test engineering, the first test cable and the device to be tested; reading the information o...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | PENG SHITAO MIAO JIAWANG |
description | The invention provides a cable management method and a test device. The method comprises the steps of establishing a test engineering, selecting a first test cable and a device to be tested, and linking the test engineering, the first test cable and the device to be tested; reading the information of a second test cable when it is detected that the second test cable is connected, and starting up the test engineering for test when it is determined that the information of the second test cable matches with the information of the first test cable. The invention can prevent the problem of cable misplug.
种线缆管理的方法及测试设备,该方法包括:创建测试工程,选择第测试线缆与被测设备,将所述测试工程、所述第测试线缆与所述被测设备进行关联;检测到第二测试线缆连接后,读取所述第二测试线缆的信息,确定所述第二测试线缆的信息与所述第测试线缆的信息匹配,则启动所述测试工程进行测试。本方案可以预防线缆错插的问题。 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108320031A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108320031A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108320031A3</originalsourceid><addsrcrecordid>eNrjZFB3TkzKSVXITcxLTE_NTc0rUchNLcnIT1FIzEtRKEktLlFISS3LTE7lYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBhbGRgYGxoaOxsSoAQBxvydq</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cable management method and test device</title><source>esp@cenet</source><creator>PENG SHITAO ; MIAO JIAWANG</creator><creatorcontrib>PENG SHITAO ; MIAO JIAWANG</creatorcontrib><description>The invention provides a cable management method and a test device. The method comprises the steps of establishing a test engineering, selecting a first test cable and a device to be tested, and linking the test engineering, the first test cable and the device to be tested; reading the information of a second test cable when it is detected that the second test cable is connected, and starting up the test engineering for test when it is determined that the information of the second test cable matches with the information of the first test cable. The invention can prevent the problem of cable misplug.
种线缆管理的方法及测试设备,该方法包括:创建测试工程,选择第测试线缆与被测设备,将所述测试工程、所述第测试线缆与所述被测设备进行关联;检测到第二测试线缆连接后,读取所述第二测试线缆的信息,确定所述第二测试线缆的信息与所述第测试线缆的信息匹配,则启动所述测试工程进行测试。本方案可以预防线缆错插的问题。</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180724&DB=EPODOC&CC=CN&NR=108320031A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180724&DB=EPODOC&CC=CN&NR=108320031A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PENG SHITAO</creatorcontrib><creatorcontrib>MIAO JIAWANG</creatorcontrib><title>Cable management method and test device</title><description>The invention provides a cable management method and a test device. The method comprises the steps of establishing a test engineering, selecting a first test cable and a device to be tested, and linking the test engineering, the first test cable and the device to be tested; reading the information of a second test cable when it is detected that the second test cable is connected, and starting up the test engineering for test when it is determined that the information of the second test cable matches with the information of the first test cable. The invention can prevent the problem of cable misplug.
种线缆管理的方法及测试设备,该方法包括:创建测试工程,选择第测试线缆与被测设备,将所述测试工程、所述第测试线缆与所述被测设备进行关联;检测到第二测试线缆连接后,读取所述第二测试线缆的信息,确定所述第二测试线缆的信息与所述第测试线缆的信息匹配,则启动所述测试工程进行测试。本方案可以预防线缆错插的问题。</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB3TkzKSVXITcxLTE_NTc0rUchNLcnIT1FIzEtRKEktLlFISS3LTE7lYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBhbGRgYGxoaOxsSoAQBxvydq</recordid><startdate>20180724</startdate><enddate>20180724</enddate><creator>PENG SHITAO</creator><creator>MIAO JIAWANG</creator><scope>EVB</scope></search><sort><creationdate>20180724</creationdate><title>Cable management method and test device</title><author>PENG SHITAO ; MIAO JIAWANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108320031A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>PENG SHITAO</creatorcontrib><creatorcontrib>MIAO JIAWANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PENG SHITAO</au><au>MIAO JIAWANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cable management method and test device</title><date>2018-07-24</date><risdate>2018</risdate><abstract>The invention provides a cable management method and a test device. The method comprises the steps of establishing a test engineering, selecting a first test cable and a device to be tested, and linking the test engineering, the first test cable and the device to be tested; reading the information of a second test cable when it is detected that the second test cable is connected, and starting up the test engineering for test when it is determined that the information of the second test cable matches with the information of the first test cable. The invention can prevent the problem of cable misplug.
种线缆管理的方法及测试设备,该方法包括:创建测试工程,选择第测试线缆与被测设备,将所述测试工程、所述第测试线缆与所述被测设备进行关联;检测到第二测试线缆连接后,读取所述第二测试线缆的信息,确定所述第二测试线缆的信息与所述第测试线缆的信息匹配,则启动所述测试工程进行测试。本方案可以预防线缆错插的问题。</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN108320031A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Cable management method and test device |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T15%3A28%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PENG%20SHITAO&rft.date=2018-07-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108320031A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |