Tunnel lining vault grouting-with-formwork device and construction method thereof

The invention discloses a tunnel lining vault grouting-with-formwork device and a construction method thereof. The grouting-with-formwork device comprises initial support, a waterproof plate, a secondary lining and a secondary lining formwork trolley. Transversely-arranged grouting pipes and exhaust...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JIAO WEINING, PAN JIANQIN, LUO GANG, PAN SHAOKANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator JIAO WEINING
PAN JIANQIN
LUO GANG
PAN SHAOKANG
description The invention discloses a tunnel lining vault grouting-with-formwork device and a construction method thereof. The grouting-with-formwork device comprises initial support, a waterproof plate, a secondary lining and a secondary lining formwork trolley. Transversely-arranged grouting pipes and exhaust pipes are longitudinally arranged on the inner side of a waterproof plate vault; the grouting pipesand the exhaust pipes are fixed to the inner side surface of the waterproof plate through welding pieces; and one ends of the grouting pipes and the exhaust pipes are provided with sealing heads usedfor sealing correspondingly. According to the tunnel lining vault grouting-with-formwork device and the construction method thereof, the grouting pipes and the exhaust pipes are fixedly mounted on the waterproof plate, after secondary lining concrete reaches final setting, grouting of the grouting pipes is finished before formwork dismantling of the second lining formwork trolley is conducted, grouting has no omission, th
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108301846A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108301846A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108301846A3</originalsourceid><addsrcrecordid>eNqNykEKwjAQQNFuXIh6h_EAgZaKdCtFcSUI3ZeQTNrQdKYkk_b6uvAArj4P_r54d5kIAwRPngZYdQ4CQ-QsX6rNy6gcx3njOIHF1RsETRYMU5KYjXgmmFFGtiAjRmR3LHZOh4SnXw_F-XHv2qfChXtMizZIKH37qsqmLqvmcr3V_zwfSVw4kQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunnel lining vault grouting-with-formwork device and construction method thereof</title><source>esp@cenet</source><creator>JIAO WEINING ; PAN JIANQIN ; LUO GANG ; PAN SHAOKANG</creator><creatorcontrib>JIAO WEINING ; PAN JIANQIN ; LUO GANG ; PAN SHAOKANG</creatorcontrib><description>The invention discloses a tunnel lining vault grouting-with-formwork device and a construction method thereof. The grouting-with-formwork device comprises initial support, a waterproof plate, a secondary lining and a secondary lining formwork trolley. Transversely-arranged grouting pipes and exhaust pipes are longitudinally arranged on the inner side of a waterproof plate vault; the grouting pipesand the exhaust pipes are fixed to the inner side surface of the waterproof plate through welding pieces; and one ends of the grouting pipes and the exhaust pipes are provided with sealing heads usedfor sealing correspondingly. According to the tunnel lining vault grouting-with-formwork device and the construction method thereof, the grouting pipes and the exhaust pipes are fixedly mounted on the waterproof plate, after secondary lining concrete reaches final setting, grouting of the grouting pipes is finished before formwork dismantling of the second lining formwork trolley is conducted, grouting has no omission, th</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180720&amp;DB=EPODOC&amp;CC=CN&amp;NR=108301846A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180720&amp;DB=EPODOC&amp;CC=CN&amp;NR=108301846A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIAO WEINING</creatorcontrib><creatorcontrib>PAN JIANQIN</creatorcontrib><creatorcontrib>LUO GANG</creatorcontrib><creatorcontrib>PAN SHAOKANG</creatorcontrib><title>Tunnel lining vault grouting-with-formwork device and construction method thereof</title><description>The invention discloses a tunnel lining vault grouting-with-formwork device and a construction method thereof. The grouting-with-formwork device comprises initial support, a waterproof plate, a secondary lining and a secondary lining formwork trolley. Transversely-arranged grouting pipes and exhaust pipes are longitudinally arranged on the inner side of a waterproof plate vault; the grouting pipesand the exhaust pipes are fixed to the inner side surface of the waterproof plate through welding pieces; and one ends of the grouting pipes and the exhaust pipes are provided with sealing heads usedfor sealing correspondingly. According to the tunnel lining vault grouting-with-formwork device and the construction method thereof, the grouting pipes and the exhaust pipes are fixedly mounted on the waterproof plate, after secondary lining concrete reaches final setting, grouting of the grouting pipes is finished before formwork dismantling of the second lining formwork trolley is conducted, grouting has no omission, th</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNykEKwjAQQNFuXIh6h_EAgZaKdCtFcSUI3ZeQTNrQdKYkk_b6uvAArj4P_r54d5kIAwRPngZYdQ4CQ-QsX6rNy6gcx3njOIHF1RsETRYMU5KYjXgmmFFGtiAjRmR3LHZOh4SnXw_F-XHv2qfChXtMizZIKH37qsqmLqvmcr3V_zwfSVw4kQ</recordid><startdate>20180720</startdate><enddate>20180720</enddate><creator>JIAO WEINING</creator><creator>PAN JIANQIN</creator><creator>LUO GANG</creator><creator>PAN SHAOKANG</creator><scope>EVB</scope></search><sort><creationdate>20180720</creationdate><title>Tunnel lining vault grouting-with-formwork device and construction method thereof</title><author>JIAO WEINING ; PAN JIANQIN ; LUO GANG ; PAN SHAOKANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108301846A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>JIAO WEINING</creatorcontrib><creatorcontrib>PAN JIANQIN</creatorcontrib><creatorcontrib>LUO GANG</creatorcontrib><creatorcontrib>PAN SHAOKANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIAO WEINING</au><au>PAN JIANQIN</au><au>LUO GANG</au><au>PAN SHAOKANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunnel lining vault grouting-with-formwork device and construction method thereof</title><date>2018-07-20</date><risdate>2018</risdate><abstract>The invention discloses a tunnel lining vault grouting-with-formwork device and a construction method thereof. The grouting-with-formwork device comprises initial support, a waterproof plate, a secondary lining and a secondary lining formwork trolley. Transversely-arranged grouting pipes and exhaust pipes are longitudinally arranged on the inner side of a waterproof plate vault; the grouting pipesand the exhaust pipes are fixed to the inner side surface of the waterproof plate through welding pieces; and one ends of the grouting pipes and the exhaust pipes are provided with sealing heads usedfor sealing correspondingly. According to the tunnel lining vault grouting-with-formwork device and the construction method thereof, the grouting pipes and the exhaust pipes are fixedly mounted on the waterproof plate, after secondary lining concrete reaches final setting, grouting of the grouting pipes is finished before formwork dismantling of the second lining formwork trolley is conducted, grouting has no omission, th</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN108301846A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Tunnel lining vault grouting-with-formwork device and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T20%3A42%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIAO%20WEINING&rft.date=2018-07-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108301846A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true