Arrangement structure of working platform of rail transit depot entrance/exit depot line track connection station
The invention discloses an arrangement structure of a working platform of a rail transit depot entrance/exit depot line track connection station. The structure comprises a depot of which an entrance/exit depot line adopts a splayed track connection form, a first track connection which is only provid...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | XIONG YINGNAN GAO HUA LIN YONGHONG ZHAO QIANG LI LING XU GUILIN ZOU LEI ZANG XIANG QUE WEI LI KE CHEN XIANWEN LYU JIETING |
description | The invention discloses an arrangement structure of a working platform of a rail transit depot entrance/exit depot line track connection station. The structure comprises a depot of which an entrance/exit depot line adopts a splayed track connection form, a first track connection which is only provided with an entrance/exit depot line, a first station platform located between two main lines of thefirst track connection station, a first entrance/exit depot line which connects the depot and the first track connection station, a first crossover and a second crossover which are connected with thefirst entrance/exit depot line and the two main lines respectively, and the working platform which is arranged between the first station platform and the first crossover or the second crossover and communicated with the first station platform. According to the arrangement structure, connection is achieved by using the entrance/exit depot line, under the premise that station scale is not increased,space utilization rate of |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN108032861A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN108032861A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN108032861A3</originalsourceid><addsrcrecordid>eNqNjMEKwjAQRHvxIOo_bD9AbC1Ir6Uonjx5LyFuSmi6iZst-vkmIJ49DTO8N-vi2TErGnFGEojCi5aFEbyBl-fJ0gjBKTGe57yxsg4kCdEKPDB4geSlrvGA79_mLGHG9ATaE6EW6ym9q5zbYmWUi7j75qYoL-d7f90ndcAYlEZCGfpbXbVVc2xPddf8w3wAJ-BElA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Arrangement structure of working platform of rail transit depot entrance/exit depot line track connection station</title><source>esp@cenet</source><creator>XIONG YINGNAN ; GAO HUA ; LIN YONGHONG ; ZHAO QIANG ; LI LING ; XU GUILIN ; ZOU LEI ; ZANG XIANG ; QUE WEI ; LI KE ; CHEN XIANWEN ; LYU JIETING</creator><creatorcontrib>XIONG YINGNAN ; GAO HUA ; LIN YONGHONG ; ZHAO QIANG ; LI LING ; XU GUILIN ; ZOU LEI ; ZANG XIANG ; QUE WEI ; LI KE ; CHEN XIANWEN ; LYU JIETING</creatorcontrib><description>The invention discloses an arrangement structure of a working platform of a rail transit depot entrance/exit depot line track connection station. The structure comprises a depot of which an entrance/exit depot line adopts a splayed track connection form, a first track connection which is only provided with an entrance/exit depot line, a first station platform located between two main lines of thefirst track connection station, a first entrance/exit depot line which connects the depot and the first track connection station, a first crossover and a second crossover which are connected with thefirst entrance/exit depot line and the two main lines respectively, and the working platform which is arranged between the first station platform and the first crossover or the second crossover and communicated with the first station platform. According to the arrangement structure, connection is achieved by using the entrance/exit depot line, under the premise that station scale is not increased,space utilization rate of</description><language>chi ; eng</language><subject>EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR ; PERFORMING OPERATIONS ; RAILWAY SYSTEMS ; RAILWAYS ; TRANSPORTING</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180515&DB=EPODOC&CC=CN&NR=108032861A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20180515&DB=EPODOC&CC=CN&NR=108032861A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIONG YINGNAN</creatorcontrib><creatorcontrib>GAO HUA</creatorcontrib><creatorcontrib>LIN YONGHONG</creatorcontrib><creatorcontrib>ZHAO QIANG</creatorcontrib><creatorcontrib>LI LING</creatorcontrib><creatorcontrib>XU GUILIN</creatorcontrib><creatorcontrib>ZOU LEI</creatorcontrib><creatorcontrib>ZANG XIANG</creatorcontrib><creatorcontrib>QUE WEI</creatorcontrib><creatorcontrib>LI KE</creatorcontrib><creatorcontrib>CHEN XIANWEN</creatorcontrib><creatorcontrib>LYU JIETING</creatorcontrib><title>Arrangement structure of working platform of rail transit depot entrance/exit depot line track connection station</title><description>The invention discloses an arrangement structure of a working platform of a rail transit depot entrance/exit depot line track connection station. The structure comprises a depot of which an entrance/exit depot line adopts a splayed track connection form, a first track connection which is only provided with an entrance/exit depot line, a first station platform located between two main lines of thefirst track connection station, a first entrance/exit depot line which connects the depot and the first track connection station, a first crossover and a second crossover which are connected with thefirst entrance/exit depot line and the two main lines respectively, and the working platform which is arranged between the first station platform and the first crossover or the second crossover and communicated with the first station platform. According to the arrangement structure, connection is achieved by using the entrance/exit depot line, under the premise that station scale is not increased,space utilization rate of</description><subject>EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR</subject><subject>PERFORMING OPERATIONS</subject><subject>RAILWAY SYSTEMS</subject><subject>RAILWAYS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMEKwjAQRHvxIOo_bD9AbC1Ir6Uonjx5LyFuSmi6iZst-vkmIJ49DTO8N-vi2TErGnFGEojCi5aFEbyBl-fJ0gjBKTGe57yxsg4kCdEKPDB4geSlrvGA79_mLGHG9ATaE6EW6ym9q5zbYmWUi7j75qYoL-d7f90ndcAYlEZCGfpbXbVVc2xPddf8w3wAJ-BElA</recordid><startdate>20180515</startdate><enddate>20180515</enddate><creator>XIONG YINGNAN</creator><creator>GAO HUA</creator><creator>LIN YONGHONG</creator><creator>ZHAO QIANG</creator><creator>LI LING</creator><creator>XU GUILIN</creator><creator>ZOU LEI</creator><creator>ZANG XIANG</creator><creator>QUE WEI</creator><creator>LI KE</creator><creator>CHEN XIANWEN</creator><creator>LYU JIETING</creator><scope>EVB</scope></search><sort><creationdate>20180515</creationdate><title>Arrangement structure of working platform of rail transit depot entrance/exit depot line track connection station</title><author>XIONG YINGNAN ; GAO HUA ; LIN YONGHONG ; ZHAO QIANG ; LI LING ; XU GUILIN ; ZOU LEI ; ZANG XIANG ; QUE WEI ; LI KE ; CHEN XIANWEN ; LYU JIETING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN108032861A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR</topic><topic>PERFORMING OPERATIONS</topic><topic>RAILWAY SYSTEMS</topic><topic>RAILWAYS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>XIONG YINGNAN</creatorcontrib><creatorcontrib>GAO HUA</creatorcontrib><creatorcontrib>LIN YONGHONG</creatorcontrib><creatorcontrib>ZHAO QIANG</creatorcontrib><creatorcontrib>LI LING</creatorcontrib><creatorcontrib>XU GUILIN</creatorcontrib><creatorcontrib>ZOU LEI</creatorcontrib><creatorcontrib>ZANG XIANG</creatorcontrib><creatorcontrib>QUE WEI</creatorcontrib><creatorcontrib>LI KE</creatorcontrib><creatorcontrib>CHEN XIANWEN</creatorcontrib><creatorcontrib>LYU JIETING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIONG YINGNAN</au><au>GAO HUA</au><au>LIN YONGHONG</au><au>ZHAO QIANG</au><au>LI LING</au><au>XU GUILIN</au><au>ZOU LEI</au><au>ZANG XIANG</au><au>QUE WEI</au><au>LI KE</au><au>CHEN XIANWEN</au><au>LYU JIETING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Arrangement structure of working platform of rail transit depot entrance/exit depot line track connection station</title><date>2018-05-15</date><risdate>2018</risdate><abstract>The invention discloses an arrangement structure of a working platform of a rail transit depot entrance/exit depot line track connection station. The structure comprises a depot of which an entrance/exit depot line adopts a splayed track connection form, a first track connection which is only provided with an entrance/exit depot line, a first station platform located between two main lines of thefirst track connection station, a first entrance/exit depot line which connects the depot and the first track connection station, a first crossover and a second crossover which are connected with thefirst entrance/exit depot line and the two main lines respectively, and the working platform which is arranged between the first station platform and the first crossover or the second crossover and communicated with the first station platform. According to the arrangement structure, connection is achieved by using the entrance/exit depot line, under the premise that station scale is not increased,space utilization rate of</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN108032861A |
source | esp@cenet |
subjects | EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR PERFORMING OPERATIONS RAILWAY SYSTEMS RAILWAYS TRANSPORTING |
title | Arrangement structure of working platform of rail transit depot entrance/exit depot line track connection station |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T12%3A56%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIONG%20YINGNAN&rft.date=2018-05-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN108032861A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |