Road traffic integral steel girder type high and large template

The invention relates to a road traffic integral steel girder type high and large template. The road traffic integral steel girder type high and large template includes a fixing frame main body, a first inclined rod and a fixing clamping block. The top end of the side surface of the fixing frame mai...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MEI CHUNXIA, ZHU TIENING, LI YANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MEI CHUNXIA
ZHU TIENING
LI YANG
description The invention relates to a road traffic integral steel girder type high and large template. The road traffic integral steel girder type high and large template includes a fixing frame main body, a first inclined rod and a fixing clamping block. The top end of the side surface of the fixing frame main body is provided with a connecting through hole. The outer wall of the fixing frame main body is provided with a rubber strip in an embedding mode. The outer wall of the fixing frame main body is provided with a wearing resistance layer. The left and right sides of the fixing frame main body are separately and fixedly provided with a second supporting rod and a first supporting rod. The bottom end of the second supporting rod is provided with a first fixing rod. The inner wall of the first fixing rod is connected with the fixing frame main body through a first embedded rod. The first inclined rod is embedded in the inner side of the first embedded rod. The road traffic integral steel girder type high and large te
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN107974959A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN107974959A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN107974959A3</originalsourceid><addsrcrecordid>eNrjZLAPyk9MUSgpSkxLy0xWyMwrSU0vSsxRKC5JTc1RSM8sSkktUiipLEhVyMhMz1BIzEtRyEksSk9VKEnNLchJLEnlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBuaW5iaWppaOxsSoAQBtGDC9</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Road traffic integral steel girder type high and large template</title><source>esp@cenet</source><creator>MEI CHUNXIA ; ZHU TIENING ; LI YANG</creator><creatorcontrib>MEI CHUNXIA ; ZHU TIENING ; LI YANG</creatorcontrib><description>The invention relates to a road traffic integral steel girder type high and large template. The road traffic integral steel girder type high and large template includes a fixing frame main body, a first inclined rod and a fixing clamping block. The top end of the side surface of the fixing frame main body is provided with a connecting through hole. The outer wall of the fixing frame main body is provided with a rubber strip in an embedding mode. The outer wall of the fixing frame main body is provided with a wearing resistance layer. The left and right sides of the fixing frame main body are separately and fixedly provided with a second supporting rod and a first supporting rod. The bottom end of the second supporting rod is provided with a first fixing rod. The inner wall of the first fixing rod is connected with the fixing frame main body through a first embedded rod. The first inclined rod is embedded in the inner side of the first embedded rod. The road traffic integral steel girder type high and large te</description><language>chi ; eng</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180501&amp;DB=EPODOC&amp;CC=CN&amp;NR=107974959A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180501&amp;DB=EPODOC&amp;CC=CN&amp;NR=107974959A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MEI CHUNXIA</creatorcontrib><creatorcontrib>ZHU TIENING</creatorcontrib><creatorcontrib>LI YANG</creatorcontrib><title>Road traffic integral steel girder type high and large template</title><description>The invention relates to a road traffic integral steel girder type high and large template. The road traffic integral steel girder type high and large template includes a fixing frame main body, a first inclined rod and a fixing clamping block. The top end of the side surface of the fixing frame main body is provided with a connecting through hole. The outer wall of the fixing frame main body is provided with a rubber strip in an embedding mode. The outer wall of the fixing frame main body is provided with a wearing resistance layer. The left and right sides of the fixing frame main body are separately and fixedly provided with a second supporting rod and a first supporting rod. The bottom end of the second supporting rod is provided with a first fixing rod. The inner wall of the first fixing rod is connected with the fixing frame main body through a first embedded rod. The first inclined rod is embedded in the inner side of the first embedded rod. The road traffic integral steel girder type high and large te</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAPyk9MUSgpSkxLy0xWyMwrSU0vSsxRKC5JTc1RSM8sSkktUiipLEhVyMhMz1BIzEtRyEksSk9VKEnNLchJLEnlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBuaW5iaWppaOxsSoAQBtGDC9</recordid><startdate>20180501</startdate><enddate>20180501</enddate><creator>MEI CHUNXIA</creator><creator>ZHU TIENING</creator><creator>LI YANG</creator><scope>EVB</scope></search><sort><creationdate>20180501</creationdate><title>Road traffic integral steel girder type high and large template</title><author>MEI CHUNXIA ; ZHU TIENING ; LI YANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN107974959A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>MEI CHUNXIA</creatorcontrib><creatorcontrib>ZHU TIENING</creatorcontrib><creatorcontrib>LI YANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MEI CHUNXIA</au><au>ZHU TIENING</au><au>LI YANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Road traffic integral steel girder type high and large template</title><date>2018-05-01</date><risdate>2018</risdate><abstract>The invention relates to a road traffic integral steel girder type high and large template. The road traffic integral steel girder type high and large template includes a fixing frame main body, a first inclined rod and a fixing clamping block. The top end of the side surface of the fixing frame main body is provided with a connecting through hole. The outer wall of the fixing frame main body is provided with a rubber strip in an embedding mode. The outer wall of the fixing frame main body is provided with a wearing resistance layer. The left and right sides of the fixing frame main body are separately and fixedly provided with a second supporting rod and a first supporting rod. The bottom end of the second supporting rod is provided with a first fixing rod. The inner wall of the first fixing rod is connected with the fixing frame main body through a first embedded rod. The first inclined rod is embedded in the inner side of the first embedded rod. The road traffic integral steel girder type high and large te</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN107974959A
source esp@cenet
subjects ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
title Road traffic integral steel girder type high and large template
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T18%3A43%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MEI%20CHUNXIA&rft.date=2018-05-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN107974959A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true