Method for improving concrete ground repairing efficiency of operator

The invention discloses a method for improving the concrete ground repairing efficiency of an operator. The method comprises the following steps: A, sleeving one end, away from a connecting shaft, ofa mounting shaft with a repairing disc, enabling a mounting hole to be matched with the mounting shaf...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: ZENG MINSI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZENG MINSI
description The invention discloses a method for improving the concrete ground repairing efficiency of an operator. The method comprises the following steps: A, sleeving one end, away from a connecting shaft, ofa mounting shaft with a repairing disc, enabling a mounting hole to be matched with the mounting shaft, and enabling each clamping block to be matched with one clamping groove; B, moving the repairingdisc till the repairing disc is sucked and fixed by a magnet; C, holding a handle, moving the repairing disc into a sink mark formed by compression of an embossing mold in the concrete ground, movingthe repairing disc back and forth along the wall of the sink mark, and polishing the bottom and the wall of the sink mark. When being used, the handle is held by a hand, the repairing disc is moved into the sink mark formed by compression of the embossing mold in the concrete ground and is moved back and forth along the wall of the sink mark, then the bottom and the wall of the sink mark are polished, and the surface quali
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN107761530A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN107761530A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN107761530A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQRuFtLCR6h_EAgYSgqSVEbLSyD8vm3zgQZ5bJKnh7ETyA1Su-t3b9BfmuI0U14kcyfbFMFFSCIYMm06eMZEie7SuIkQNDwps0kiaYz2obt4p-XrD9tXC7U3_rziWSDliSDxDkobvWVdse6n1THZt_ng8ouTOk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for improving concrete ground repairing efficiency of operator</title><source>esp@cenet</source><creator>ZENG MINSI</creator><creatorcontrib>ZENG MINSI</creatorcontrib><description>The invention discloses a method for improving the concrete ground repairing efficiency of an operator. The method comprises the following steps: A, sleeving one end, away from a connecting shaft, ofa mounting shaft with a repairing disc, enabling a mounting hole to be matched with the mounting shaft, and enabling each clamping block to be matched with one clamping groove; B, moving the repairingdisc till the repairing disc is sucked and fixed by a magnet; C, holding a handle, moving the repairing disc into a sink mark formed by compression of an embossing mold in the concrete ground, movingthe repairing disc back and forth along the wall of the sink mark, and polishing the bottom and the wall of the sink mark. When being used, the handle is held by a hand, the repairing disc is moved into the sink mark formed by compression of the embossing mold in the concrete ground and is moved back and forth along the wall of the sink mark, then the bottom and the wall of the sink mark are polished, and the surface quali</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180306&amp;DB=EPODOC&amp;CC=CN&amp;NR=107761530A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20180306&amp;DB=EPODOC&amp;CC=CN&amp;NR=107761530A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZENG MINSI</creatorcontrib><title>Method for improving concrete ground repairing efficiency of operator</title><description>The invention discloses a method for improving the concrete ground repairing efficiency of an operator. The method comprises the following steps: A, sleeving one end, away from a connecting shaft, ofa mounting shaft with a repairing disc, enabling a mounting hole to be matched with the mounting shaft, and enabling each clamping block to be matched with one clamping groove; B, moving the repairingdisc till the repairing disc is sucked and fixed by a magnet; C, holding a handle, moving the repairing disc into a sink mark formed by compression of an embossing mold in the concrete ground, movingthe repairing disc back and forth along the wall of the sink mark, and polishing the bottom and the wall of the sink mark. When being used, the handle is held by a hand, the repairing disc is moved into the sink mark formed by compression of the embossing mold in the concrete ground and is moved back and forth along the wall of the sink mark, then the bottom and the wall of the sink mark are polished, and the surface quali</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQRuFtLCR6h_EAgYSgqSVEbLSyD8vm3zgQZ5bJKnh7ETyA1Su-t3b9BfmuI0U14kcyfbFMFFSCIYMm06eMZEie7SuIkQNDwps0kiaYz2obt4p-XrD9tXC7U3_rziWSDliSDxDkobvWVdse6n1THZt_ng8ouTOk</recordid><startdate>20180306</startdate><enddate>20180306</enddate><creator>ZENG MINSI</creator><scope>EVB</scope></search><sort><creationdate>20180306</creationdate><title>Method for improving concrete ground repairing efficiency of operator</title><author>ZENG MINSI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN107761530A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>ZENG MINSI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZENG MINSI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for improving concrete ground repairing efficiency of operator</title><date>2018-03-06</date><risdate>2018</risdate><abstract>The invention discloses a method for improving the concrete ground repairing efficiency of an operator. The method comprises the following steps: A, sleeving one end, away from a connecting shaft, ofa mounting shaft with a repairing disc, enabling a mounting hole to be matched with the mounting shaft, and enabling each clamping block to be matched with one clamping groove; B, moving the repairingdisc till the repairing disc is sucked and fixed by a magnet; C, holding a handle, moving the repairing disc into a sink mark formed by compression of an embossing mold in the concrete ground, movingthe repairing disc back and forth along the wall of the sink mark, and polishing the bottom and the wall of the sink mark. When being used, the handle is held by a hand, the repairing disc is moved into the sink mark formed by compression of the embossing mold in the concrete ground and is moved back and forth along the wall of the sink mark, then the bottom and the wall of the sink mark are polished, and the surface quali</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN107761530A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
title Method for improving concrete ground repairing efficiency of operator
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T16%3A20%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZENG%20MINSI&rft.date=2018-03-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN107761530A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true