Installation and construction method of high formwork of super high-rise elevator shaft

The invention discloses an installation and construction method of a high formwork of a super high-rise elevator shaft. The installation and construction method comprises two stages including a construction preparation stage and a construction operation procedure, wherein the construction operation...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG JIE, YANG TONGYUAN, YAN FUHUA, DING ENLIANG, SHEN YULONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG JIE
YANG TONGYUAN
YAN FUHUA
DING ENLIANG
SHEN YULONG
description The invention discloses an installation and construction method of a high formwork of a super high-rise elevator shaft. The installation and construction method comprises two stages including a construction preparation stage and a construction operation procedure, wherein the construction operation procedure comprises the steps of (1) processing the formwork, (2) installing and fixing a bottom die, (3) installing an inner support frame, (4) installing and fixing a side die, (5) integrally reinforcing, (6) hoisting a box body in place, (7) installing a connecting reinforcement, (8) pouring concrete, and monitoring, and (9) removing the formwork. According to the reinforcement and construction method of the high formwork of the super high-rise elevator shaft, traditional formworks, battens and steel pipes are used as raw materials, the formworks are used as face plates, the battens are used as inner ridges, the steel pipes are used as outer ridges so as to manufacture the box body, a lifting machine is installe
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN107503365A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN107503365A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN107503365A3</originalsourceid><addsrcrecordid>eNqNykEKwjAQQNFsXIh6h_EAhUqorqUounEluCxDOjHBNBMmqV5fLR7A1YfHn6vbOeaCIWDxHAFjD4Y_IqOZYKDiuAe24PzdgWUZXiyPL-QxkUxcic8EFOiJhQWyQ1uWamYxZFr9ulDr4-HanipK3FFOaChS6drLpt41tdbbZq__ed6f3zpT</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installation and construction method of high formwork of super high-rise elevator shaft</title><source>esp@cenet</source><creator>WANG JIE ; YANG TONGYUAN ; YAN FUHUA ; DING ENLIANG ; SHEN YULONG</creator><creatorcontrib>WANG JIE ; YANG TONGYUAN ; YAN FUHUA ; DING ENLIANG ; SHEN YULONG</creatorcontrib><description>The invention discloses an installation and construction method of a high formwork of a super high-rise elevator shaft. The installation and construction method comprises two stages including a construction preparation stage and a construction operation procedure, wherein the construction operation procedure comprises the steps of (1) processing the formwork, (2) installing and fixing a bottom die, (3) installing an inner support frame, (4) installing and fixing a side die, (5) integrally reinforcing, (6) hoisting a box body in place, (7) installing a connecting reinforcement, (8) pouring concrete, and monitoring, and (9) removing the formwork. According to the reinforcement and construction method of the high formwork of the super high-rise elevator shaft, traditional formworks, battens and steel pipes are used as raw materials, the formworks are used as face plates, the battens are used as inner ridges, the steel pipes are used as outer ridges so as to manufacture the box body, a lifting machine is installe</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20171222&amp;DB=EPODOC&amp;CC=CN&amp;NR=107503365A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20171222&amp;DB=EPODOC&amp;CC=CN&amp;NR=107503365A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG JIE</creatorcontrib><creatorcontrib>YANG TONGYUAN</creatorcontrib><creatorcontrib>YAN FUHUA</creatorcontrib><creatorcontrib>DING ENLIANG</creatorcontrib><creatorcontrib>SHEN YULONG</creatorcontrib><title>Installation and construction method of high formwork of super high-rise elevator shaft</title><description>The invention discloses an installation and construction method of a high formwork of a super high-rise elevator shaft. The installation and construction method comprises two stages including a construction preparation stage and a construction operation procedure, wherein the construction operation procedure comprises the steps of (1) processing the formwork, (2) installing and fixing a bottom die, (3) installing an inner support frame, (4) installing and fixing a side die, (5) integrally reinforcing, (6) hoisting a box body in place, (7) installing a connecting reinforcement, (8) pouring concrete, and monitoring, and (9) removing the formwork. According to the reinforcement and construction method of the high formwork of the super high-rise elevator shaft, traditional formworks, battens and steel pipes are used as raw materials, the formworks are used as face plates, the battens are used as inner ridges, the steel pipes are used as outer ridges so as to manufacture the box body, a lifting machine is installe</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNykEKwjAQQNFsXIh6h_EAhUqorqUounEluCxDOjHBNBMmqV5fLR7A1YfHn6vbOeaCIWDxHAFjD4Y_IqOZYKDiuAe24PzdgWUZXiyPL-QxkUxcic8EFOiJhQWyQ1uWamYxZFr9ulDr4-HanipK3FFOaChS6drLpt41tdbbZq__ed6f3zpT</recordid><startdate>20171222</startdate><enddate>20171222</enddate><creator>WANG JIE</creator><creator>YANG TONGYUAN</creator><creator>YAN FUHUA</creator><creator>DING ENLIANG</creator><creator>SHEN YULONG</creator><scope>EVB</scope></search><sort><creationdate>20171222</creationdate><title>Installation and construction method of high formwork of super high-rise elevator shaft</title><author>WANG JIE ; YANG TONGYUAN ; YAN FUHUA ; DING ENLIANG ; SHEN YULONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN107503365A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2017</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG JIE</creatorcontrib><creatorcontrib>YANG TONGYUAN</creatorcontrib><creatorcontrib>YAN FUHUA</creatorcontrib><creatorcontrib>DING ENLIANG</creatorcontrib><creatorcontrib>SHEN YULONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG JIE</au><au>YANG TONGYUAN</au><au>YAN FUHUA</au><au>DING ENLIANG</au><au>SHEN YULONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installation and construction method of high formwork of super high-rise elevator shaft</title><date>2017-12-22</date><risdate>2017</risdate><abstract>The invention discloses an installation and construction method of a high formwork of a super high-rise elevator shaft. The installation and construction method comprises two stages including a construction preparation stage and a construction operation procedure, wherein the construction operation procedure comprises the steps of (1) processing the formwork, (2) installing and fixing a bottom die, (3) installing an inner support frame, (4) installing and fixing a side die, (5) integrally reinforcing, (6) hoisting a box body in place, (7) installing a connecting reinforcement, (8) pouring concrete, and monitoring, and (9) removing the formwork. According to the reinforcement and construction method of the high formwork of the super high-rise elevator shaft, traditional formworks, battens and steel pipes are used as raw materials, the formworks are used as face plates, the battens are used as inner ridges, the steel pipes are used as outer ridges so as to manufacture the box body, a lifting machine is installe</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN107503365A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Installation and construction method of high formwork of super high-rise elevator shaft
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T07%3A48%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20JIE&rft.date=2017-12-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN107503365A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true