METHOD FOR OPTIMIZING POWER CONSUMPTION PRODUCED BY A RENEWABLE ELECTRICITY SOURCE
The invention discloses a method for optimizing power consumption produced by a renewable electricity source. The method of optimizing the consumption, by loads, of an electrical power produced by at least one renewable source and at least one non-intermittent source connected to an electricity prod...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | AURELIEN HAVEL MICHEL CLEMENCE TEDDY RUEZ |
description | The invention discloses a method for optimizing power consumption produced by a renewable electricity source. The method of optimizing the consumption, by loads, of an electrical power produced by at least one renewable source and at least one non-intermittent source connected to an electricity production and distribution network, the method including: a. a step of determining a time profile of a renewable power produced by the at least one renewable source; b. a step of determining, among loads connected to the network, constraints on the use of the loads; and c. a step of determining a plan of operation of the loads for maximizing the consumption of the renewable power produced by the at least one renewable source, while respecting the constraints on use, this determination including an evaluation of the consumption of the renewable power under the effect of a time-shift in starting the loads.
本发明涉及种用于优化负载对由连接到电力产生和分配网络的至少个可再生源和至少个非间歇源产生的电功率的消耗的方法,所述方法包括:a.确定由所述至少个可再生源产生的可再生功率的时间分布的步骤;b.在连接到该网络的负载中确定对所述负载的使 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN107231004A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN107231004A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN107231004A3</originalsourceid><addsrcrecordid>eNqNykEKwjAQQNFuXIh6h_EAQmoF1-lkagNNpkwTSt2UInElWqj3RxcewNWHx19n4ijUbKBiAW6DdfZq_QVa7kkA2XfRfZU9tMImIhkoB9Ag5KnXZUNADWEQizYM0HEUpG22uk-PJe1-3WT7igLWhzS_xrTM0y0903tEn6vzsciVOunin-cD_oIv1A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR OPTIMIZING POWER CONSUMPTION PRODUCED BY A RENEWABLE ELECTRICITY SOURCE</title><source>esp@cenet</source><creator>AURELIEN HAVEL ; MICHEL CLEMENCE ; TEDDY RUEZ</creator><creatorcontrib>AURELIEN HAVEL ; MICHEL CLEMENCE ; TEDDY RUEZ</creatorcontrib><description>The invention discloses a method for optimizing power consumption produced by a renewable electricity source. The method of optimizing the consumption, by loads, of an electrical power produced by at least one renewable source and at least one non-intermittent source connected to an electricity production and distribution network, the method including: a. a step of determining a time profile of a renewable power produced by the at least one renewable source; b. a step of determining, among loads connected to the network, constraints on the use of the loads; and c. a step of determining a plan of operation of the loads for maximizing the consumption of the renewable power produced by the at least one renewable source, while respecting the constraints on use, this determination including an evaluation of the consumption of the renewable power under the effect of a time-shift in starting the loads.
本发明涉及种用于优化负载对由连接到电力产生和分配网络的至少个可再生源和至少个非间歇源产生的电功率的消耗的方法,所述方法包括:a.确定由所述至少个可再生源产生的可再生功率的时间分布的步骤;b.在连接到该网络的负载中确定对所述负载的使</description><language>chi ; eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20171003&DB=EPODOC&CC=CN&NR=107231004A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20171003&DB=EPODOC&CC=CN&NR=107231004A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>AURELIEN HAVEL</creatorcontrib><creatorcontrib>MICHEL CLEMENCE</creatorcontrib><creatorcontrib>TEDDY RUEZ</creatorcontrib><title>METHOD FOR OPTIMIZING POWER CONSUMPTION PRODUCED BY A RENEWABLE ELECTRICITY SOURCE</title><description>The invention discloses a method for optimizing power consumption produced by a renewable electricity source. The method of optimizing the consumption, by loads, of an electrical power produced by at least one renewable source and at least one non-intermittent source connected to an electricity production and distribution network, the method including: a. a step of determining a time profile of a renewable power produced by the at least one renewable source; b. a step of determining, among loads connected to the network, constraints on the use of the loads; and c. a step of determining a plan of operation of the loads for maximizing the consumption of the renewable power produced by the at least one renewable source, while respecting the constraints on use, this determination including an evaluation of the consumption of the renewable power under the effect of a time-shift in starting the loads.
本发明涉及种用于优化负载对由连接到电力产生和分配网络的至少个可再生源和至少个非间歇源产生的电功率的消耗的方法,所述方法包括:a.确定由所述至少个可再生源产生的可再生功率的时间分布的步骤;b.在连接到该网络的负载中确定对所述负载的使</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNykEKwjAQQNFuXIh6h_EAQmoF1-lkagNNpkwTSt2UInElWqj3RxcewNWHx19n4ijUbKBiAW6DdfZq_QVa7kkA2XfRfZU9tMImIhkoB9Ag5KnXZUNADWEQizYM0HEUpG22uk-PJe1-3WT7igLWhzS_xrTM0y0903tEn6vzsciVOunin-cD_oIv1A</recordid><startdate>20171003</startdate><enddate>20171003</enddate><creator>AURELIEN HAVEL</creator><creator>MICHEL CLEMENCE</creator><creator>TEDDY RUEZ</creator><scope>EVB</scope></search><sort><creationdate>20171003</creationdate><title>METHOD FOR OPTIMIZING POWER CONSUMPTION PRODUCED BY A RENEWABLE ELECTRICITY SOURCE</title><author>AURELIEN HAVEL ; MICHEL CLEMENCE ; TEDDY RUEZ</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN107231004A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2017</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>AURELIEN HAVEL</creatorcontrib><creatorcontrib>MICHEL CLEMENCE</creatorcontrib><creatorcontrib>TEDDY RUEZ</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>AURELIEN HAVEL</au><au>MICHEL CLEMENCE</au><au>TEDDY RUEZ</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR OPTIMIZING POWER CONSUMPTION PRODUCED BY A RENEWABLE ELECTRICITY SOURCE</title><date>2017-10-03</date><risdate>2017</risdate><abstract>The invention discloses a method for optimizing power consumption produced by a renewable electricity source. The method of optimizing the consumption, by loads, of an electrical power produced by at least one renewable source and at least one non-intermittent source connected to an electricity production and distribution network, the method including: a. a step of determining a time profile of a renewable power produced by the at least one renewable source; b. a step of determining, among loads connected to the network, constraints on the use of the loads; and c. a step of determining a plan of operation of the loads for maximizing the consumption of the renewable power produced by the at least one renewable source, while respecting the constraints on use, this determination including an evaluation of the consumption of the renewable power under the effect of a time-shift in starting the loads.
本发明涉及种用于优化负载对由连接到电力产生和分配网络的至少个可再生源和至少个非间歇源产生的电功率的消耗的方法,所述方法包括:a.确定由所述至少个可再生源产生的可再生功率的时间分布的步骤;b.在连接到该网络的负载中确定对所述负载的使</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN107231004A |
source | esp@cenet |
subjects | CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY GENERATION SYSTEMS FOR STORING ELECTRIC ENERGY |
title | METHOD FOR OPTIMIZING POWER CONSUMPTION PRODUCED BY A RENEWABLE ELECTRICITY SOURCE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T22%3A52%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=AURELIEN%20HAVEL&rft.date=2017-10-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN107231004A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |