Construction method for constructing road on dredger fill soil foundation and subgrade strengthening structure formed by adopting construction method
The invention discloses a construction method for constructing a road on a dredger fill soil foundation and a subgrade strengthening structure formed by adopting the construction method. A subgrade structure is preliminarily formed by combining sludge filled film bags with a three-dimensional compou...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!