Integration method of pivotal project safety monitoring automation system
The invention discloses an integration method of a pivotal project safety monitoring automation system, and relates to a method for detecting a pivotal project. The method comprises the following steps: data in an external appearance subsystem, data in an internal appearance subsystem and data in an...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LI SHUANGPING YE FANGYI ZHENG MIN YANG AIMING MA NENGWU CHENG XIANG PEI ZHUOYAN |
description | The invention discloses an integration method of a pivotal project safety monitoring automation system, and relates to a method for detecting a pivotal project. The method comprises the following steps: data in an external appearance subsystem, data in an internal appearance subsystem and data in an environmental monitoring system are integrated; the parameter information of the external appearance subsystem in a background database is sent to an engineering test platform through a network at intervals of one or two days, the parameter information of the internal appearance subsystem in the background database is sent to the engineering test platform through the network at intervals of one or two hours, and the parameter information of the environmental monitoring system in the background database is sent to the engineering test platform through the network at intervals of one week; and when the power fails or the server is under maintenance, the data displayed on the engineering test platform is discontinuou |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN106970577A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN106970577A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN106970577A3</originalsourceid><addsrcrecordid>eNrjZPD0zCtJTS9KLMnMz1PITS3JyE9RyE9TKMgsyy9JzFEoKMrPSk0uUShOTEstqVTIzc_LLMkvysxLV0gsLcnPhWgrriwuSc3lYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBmaW5gam5uaOxsSoAQBcszXM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Integration method of pivotal project safety monitoring automation system</title><source>esp@cenet</source><creator>LI SHUANGPING ; YE FANGYI ; ZHENG MIN ; YANG AIMING ; MA NENGWU ; CHENG XIANG ; PEI ZHUOYAN</creator><creatorcontrib>LI SHUANGPING ; YE FANGYI ; ZHENG MIN ; YANG AIMING ; MA NENGWU ; CHENG XIANG ; PEI ZHUOYAN</creatorcontrib><description>The invention discloses an integration method of a pivotal project safety monitoring automation system, and relates to a method for detecting a pivotal project. The method comprises the following steps: data in an external appearance subsystem, data in an internal appearance subsystem and data in an environmental monitoring system are integrated; the parameter information of the external appearance subsystem in a background database is sent to an engineering test platform through a network at intervals of one or two days, the parameter information of the internal appearance subsystem in the background database is sent to the engineering test platform through the network at intervals of one or two hours, and the parameter information of the environmental monitoring system in the background database is sent to the engineering test platform through the network at intervals of one week; and when the power fails or the server is under maintenance, the data displayed on the engineering test platform is discontinuou</description><language>chi ; eng</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170721&DB=EPODOC&CC=CN&NR=106970577A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170721&DB=EPODOC&CC=CN&NR=106970577A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI SHUANGPING</creatorcontrib><creatorcontrib>YE FANGYI</creatorcontrib><creatorcontrib>ZHENG MIN</creatorcontrib><creatorcontrib>YANG AIMING</creatorcontrib><creatorcontrib>MA NENGWU</creatorcontrib><creatorcontrib>CHENG XIANG</creatorcontrib><creatorcontrib>PEI ZHUOYAN</creatorcontrib><title>Integration method of pivotal project safety monitoring automation system</title><description>The invention discloses an integration method of a pivotal project safety monitoring automation system, and relates to a method for detecting a pivotal project. The method comprises the following steps: data in an external appearance subsystem, data in an internal appearance subsystem and data in an environmental monitoring system are integrated; the parameter information of the external appearance subsystem in a background database is sent to an engineering test platform through a network at intervals of one or two days, the parameter information of the internal appearance subsystem in the background database is sent to the engineering test platform through the network at intervals of one or two hours, and the parameter information of the environmental monitoring system in the background database is sent to the engineering test platform through the network at intervals of one week; and when the power fails or the server is under maintenance, the data displayed on the engineering test platform is discontinuou</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPD0zCtJTS9KLMnMz1PITS3JyE9RyE9TKMgsyy9JzFEoKMrPSk0uUShOTEstqVTIzc_LLMkvysxLV0gsLcnPhWgrriwuSc3lYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBmaW5gam5uaOxsSoAQBcszXM</recordid><startdate>20170721</startdate><enddate>20170721</enddate><creator>LI SHUANGPING</creator><creator>YE FANGYI</creator><creator>ZHENG MIN</creator><creator>YANG AIMING</creator><creator>MA NENGWU</creator><creator>CHENG XIANG</creator><creator>PEI ZHUOYAN</creator><scope>EVB</scope></search><sort><creationdate>20170721</creationdate><title>Integration method of pivotal project safety monitoring automation system</title><author>LI SHUANGPING ; YE FANGYI ; ZHENG MIN ; YANG AIMING ; MA NENGWU ; CHENG XIANG ; PEI ZHUOYAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN106970577A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2017</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><toplevel>online_resources</toplevel><creatorcontrib>LI SHUANGPING</creatorcontrib><creatorcontrib>YE FANGYI</creatorcontrib><creatorcontrib>ZHENG MIN</creatorcontrib><creatorcontrib>YANG AIMING</creatorcontrib><creatorcontrib>MA NENGWU</creatorcontrib><creatorcontrib>CHENG XIANG</creatorcontrib><creatorcontrib>PEI ZHUOYAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI SHUANGPING</au><au>YE FANGYI</au><au>ZHENG MIN</au><au>YANG AIMING</au><au>MA NENGWU</au><au>CHENG XIANG</au><au>PEI ZHUOYAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Integration method of pivotal project safety monitoring automation system</title><date>2017-07-21</date><risdate>2017</risdate><abstract>The invention discloses an integration method of a pivotal project safety monitoring automation system, and relates to a method for detecting a pivotal project. The method comprises the following steps: data in an external appearance subsystem, data in an internal appearance subsystem and data in an environmental monitoring system are integrated; the parameter information of the external appearance subsystem in a background database is sent to an engineering test platform through a network at intervals of one or two days, the parameter information of the internal appearance subsystem in the background database is sent to the engineering test platform through the network at intervals of one or two hours, and the parameter information of the environmental monitoring system in the background database is sent to the engineering test platform through the network at intervals of one week; and when the power fails or the server is under maintenance, the data displayed on the engineering test platform is discontinuou</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN106970577A |
source | esp@cenet |
subjects | CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING FUNCTIONAL ELEMENTS OF SUCH SYSTEMS MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING |
title | Integration method of pivotal project safety monitoring automation system |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T07%3A20%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20SHUANGPING&rft.date=2017-07-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN106970577A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |