Method for tunnel smooth blasting drill construction
The invention discloses a method for tunnel smooth blasting drill construction. The method comprises the steps of installing a drilling rig direction controller on a rock drill, wherein the drilling rig direction controller is used for directly displaying up-and-down and left-right deflection direct...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG GONG QIAN YECUN GAO BO MEI ZHIYAO |
description | The invention discloses a method for tunnel smooth blasting drill construction. The method comprises the steps of installing a drilling rig direction controller on a rock drill, wherein the drilling rig direction controller is used for directly displaying up-and-down and left-right deflection directions of a drilling rig; before the rock drill enters a tunnel, performing line element section segmentation on a tunnel center line, calculating an azimuth of each section of tunnel center line according to the line element section, wherein the line element section comprises a straight line section, a straight easement section, an easement circular section, a circular curved section, a circular easement section and an easement straight section; the azimuth is an included angle alpha of each section of tunnel center line and the true north direction; after the rock drill enters the tunnel, setting the angle of the drilling rig direction controller as the angle alpha for each section of tunnel, causing a drilling rig |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN106368606A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN106368606A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN106368606A3</originalsourceid><addsrcrecordid>eNrjZDDxTS3JyE9RSMsvUigpzctLzVEozs3PL8lQSMpJLC7JzEtXSCnKzMlRSM7PKy4pKk0uyczP42FgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hgZmxmYWZgZmjsbEqAEAYZotUQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for tunnel smooth blasting drill construction</title><source>esp@cenet</source><creator>ZHANG GONG ; QIAN YECUN ; GAO BO ; MEI ZHIYAO</creator><creatorcontrib>ZHANG GONG ; QIAN YECUN ; GAO BO ; MEI ZHIYAO</creatorcontrib><description>The invention discloses a method for tunnel smooth blasting drill construction. The method comprises the steps of installing a drilling rig direction controller on a rock drill, wherein the drilling rig direction controller is used for directly displaying up-and-down and left-right deflection directions of a drilling rig; before the rock drill enters a tunnel, performing line element section segmentation on a tunnel center line, calculating an azimuth of each section of tunnel center line according to the line element section, wherein the line element section comprises a straight line section, a straight easement section, an easement circular section, a circular curved section, a circular easement section and an easement straight section; the azimuth is an included angle alpha of each section of tunnel center line and the true north direction; after the rock drill enters the tunnel, setting the angle of the drilling rig direction controller as the angle alpha for each section of tunnel, causing a drilling rig</description><language>chi ; eng</language><subject>AMMUNITION ; BLASTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; HEATING ; LARGE UNDERGROUND CHAMBERS ; LIGHTING ; MECHANICAL ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SHAFTS ; TUNNELS ; WEAPONS</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170201&DB=EPODOC&CC=CN&NR=106368606A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170201&DB=EPODOC&CC=CN&NR=106368606A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG GONG</creatorcontrib><creatorcontrib>QIAN YECUN</creatorcontrib><creatorcontrib>GAO BO</creatorcontrib><creatorcontrib>MEI ZHIYAO</creatorcontrib><title>Method for tunnel smooth blasting drill construction</title><description>The invention discloses a method for tunnel smooth blasting drill construction. The method comprises the steps of installing a drilling rig direction controller on a rock drill, wherein the drilling rig direction controller is used for directly displaying up-and-down and left-right deflection directions of a drilling rig; before the rock drill enters a tunnel, performing line element section segmentation on a tunnel center line, calculating an azimuth of each section of tunnel center line according to the line element section, wherein the line element section comprises a straight line section, a straight easement section, an easement circular section, a circular curved section, a circular easement section and an easement straight section; the azimuth is an included angle alpha of each section of tunnel center line and the true north direction; after the rock drill enters the tunnel, setting the angle of the drilling rig direction controller as the angle alpha for each section of tunnel, causing a drilling rig</description><subject>AMMUNITION</subject><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>HEATING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDDxTS3JyE9RSMsvUigpzctLzVEozs3PL8lQSMpJLC7JzEtXSCnKzMlRSM7PKy4pKk0uyczP42FgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hgZmxmYWZgZmjsbEqAEAYZotUQ</recordid><startdate>20170201</startdate><enddate>20170201</enddate><creator>ZHANG GONG</creator><creator>QIAN YECUN</creator><creator>GAO BO</creator><creator>MEI ZHIYAO</creator><scope>EVB</scope></search><sort><creationdate>20170201</creationdate><title>Method for tunnel smooth blasting drill construction</title><author>ZHANG GONG ; QIAN YECUN ; GAO BO ; MEI ZHIYAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN106368606A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2017</creationdate><topic>AMMUNITION</topic><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>HEATING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG GONG</creatorcontrib><creatorcontrib>QIAN YECUN</creatorcontrib><creatorcontrib>GAO BO</creatorcontrib><creatorcontrib>MEI ZHIYAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG GONG</au><au>QIAN YECUN</au><au>GAO BO</au><au>MEI ZHIYAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for tunnel smooth blasting drill construction</title><date>2017-02-01</date><risdate>2017</risdate><abstract>The invention discloses a method for tunnel smooth blasting drill construction. The method comprises the steps of installing a drilling rig direction controller on a rock drill, wherein the drilling rig direction controller is used for directly displaying up-and-down and left-right deflection directions of a drilling rig; before the rock drill enters a tunnel, performing line element section segmentation on a tunnel center line, calculating an azimuth of each section of tunnel center line according to the line element section, wherein the line element section comprises a straight line section, a straight easement section, an easement circular section, a circular curved section, a circular easement section and an easement straight section; the azimuth is an included angle alpha of each section of tunnel center line and the true north direction; after the rock drill enters the tunnel, setting the angle of the drilling rig direction controller as the angle alpha for each section of tunnel, causing a drilling rig</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN106368606A |
source | esp@cenet |
subjects | AMMUNITION BLASTING EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS GALLERIES HEATING LARGE UNDERGROUND CHAMBERS LIGHTING MECHANICAL ENGINEERING MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS SHAFTS TUNNELS WEAPONS |
title | Method for tunnel smooth blasting drill construction |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T21%3A28%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20GONG&rft.date=2017-02-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN106368606A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |