Installing method for outdoor fire hydrants
The invention discloses an installing method for outdoor fire hydrants. The installing method is characterized by including the following steps that before the outdoor fire hydrants are installed, the inner walls and the outer walls of pipes are coated with asphaltic base oil twice, the outer walls...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIANG HANBIN |
description | The invention discloses an installing method for outdoor fire hydrants. The installing method is characterized by including the following steps that before the outdoor fire hydrants are installed, the inner walls and the outer walls of pipes are coated with asphaltic base oil twice, the outer walls need to be additionally coated with heat-regenerative asphalt twice and coated with finishing coat once, flange connectors buried into soil are coated with asphaltic base oil twice, hot asphalt needs to be additionally added into the outer walls twice, finishing coat needs to be additionally added into the outer walls once, and the outer walls are closely packaged with asphalt linen; iron pieces in fire hydrant chambers are also coated with hot asphalt for corrosion prevention; pebbles with the particle size of 20 mm to 30 mm are used as a permeable layer of dewatering outlets of outdoor fire hydrants, the laying radius is 500 mm, and the laying thickness is from 100 mm underground to the groove bottoms; the height |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN106193606A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN106193606A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN106193606A3</originalsourceid><addsrcrecordid>eNrjZND2zCsuSczJycxLV8hNLcnIT1FIyy9SyC8tSckH0mmZRakKGZUpRYl5JcU8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_QwMzQ0tjMwMzRmBg1AH_bKa4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installing method for outdoor fire hydrants</title><source>esp@cenet</source><creator>LIANG HANBIN</creator><creatorcontrib>LIANG HANBIN</creatorcontrib><description>The invention discloses an installing method for outdoor fire hydrants. The installing method is characterized by including the following steps that before the outdoor fire hydrants are installed, the inner walls and the outer walls of pipes are coated with asphaltic base oil twice, the outer walls need to be additionally coated with heat-regenerative asphalt twice and coated with finishing coat once, flange connectors buried into soil are coated with asphaltic base oil twice, hot asphalt needs to be additionally added into the outer walls twice, finishing coat needs to be additionally added into the outer walls once, and the outer walls are closely packaged with asphalt linen; iron pieces in fire hydrant chambers are also coated with hot asphalt for corrosion prevention; pebbles with the particle size of 20 mm to 30 mm are used as a permeable layer of dewatering outlets of outdoor fire hydrants, the laying radius is 500 mm, and the laying thickness is from 100 mm underground to the groove bottoms; the height</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIRE-FIGHTING ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; HUMAN NECESSITIES ; LIFE-SAVING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161207&DB=EPODOC&CC=CN&NR=106193606A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161207&DB=EPODOC&CC=CN&NR=106193606A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIANG HANBIN</creatorcontrib><title>Installing method for outdoor fire hydrants</title><description>The invention discloses an installing method for outdoor fire hydrants. The installing method is characterized by including the following steps that before the outdoor fire hydrants are installed, the inner walls and the outer walls of pipes are coated with asphaltic base oil twice, the outer walls need to be additionally coated with heat-regenerative asphalt twice and coated with finishing coat once, flange connectors buried into soil are coated with asphaltic base oil twice, hot asphalt needs to be additionally added into the outer walls twice, finishing coat needs to be additionally added into the outer walls once, and the outer walls are closely packaged with asphalt linen; iron pieces in fire hydrant chambers are also coated with hot asphalt for corrosion prevention; pebbles with the particle size of 20 mm to 30 mm are used as a permeable layer of dewatering outlets of outdoor fire hydrants, the laying radius is 500 mm, and the laying thickness is from 100 mm underground to the groove bottoms; the height</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIRE-FIGHTING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HUMAN NECESSITIES</subject><subject>LIFE-SAVING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZND2zCsuSczJycxLV8hNLcnIT1FIyy9SyC8tSckH0mmZRakKGZUpRYl5JcU8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_QwMzQ0tjMwMzRmBg1AH_bKa4</recordid><startdate>20161207</startdate><enddate>20161207</enddate><creator>LIANG HANBIN</creator><scope>EVB</scope></search><sort><creationdate>20161207</creationdate><title>Installing method for outdoor fire hydrants</title><author>LIANG HANBIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN106193606A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIRE-FIGHTING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HUMAN NECESSITIES</topic><topic>LIFE-SAVING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIANG HANBIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIANG HANBIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installing method for outdoor fire hydrants</title><date>2016-12-07</date><risdate>2016</risdate><abstract>The invention discloses an installing method for outdoor fire hydrants. The installing method is characterized by including the following steps that before the outdoor fire hydrants are installed, the inner walls and the outer walls of pipes are coated with asphaltic base oil twice, the outer walls need to be additionally coated with heat-regenerative asphalt twice and coated with finishing coat once, flange connectors buried into soil are coated with asphaltic base oil twice, hot asphalt needs to be additionally added into the outer walls twice, finishing coat needs to be additionally added into the outer walls once, and the outer walls are closely packaged with asphalt linen; iron pieces in fire hydrant chambers are also coated with hot asphalt for corrosion prevention; pebbles with the particle size of 20 mm to 30 mm are used as a permeable layer of dewatering outlets of outdoor fire hydrants, the laying radius is 500 mm, and the laying thickness is from 100 mm underground to the groove bottoms; the height</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN106193606A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIRE-FIGHTING FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE HUMAN NECESSITIES LIFE-SAVING REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Installing method for outdoor fire hydrants |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T22%3A58%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIANG%20HANBIN&rft.date=2016-12-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN106193606A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |