Construction method for shield crossing railway line

The invention discloses a construction method for a shield crossing railway line. The method comprises the steps that auxiliary beams and cross beams are adopted for reinforcing and suspending operation on railway tracks within the influential range of a shield lower-crossing embankment, and meanwhi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Tian Ruiduan, Shao Wenfei, Zhao Sanlin, Deng Yao, Zhou Hao, Li Shaopeng, Luo Li, Xue Jianzhong, Wang Xuandong, Huang Dezhong, Kou Shaolin, Zeng Yingying, Wei Yingping, Li Jun, Zhang Liang
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Tian Ruiduan
Shao Wenfei
Zhao Sanlin
Deng Yao
Zhou Hao
Li Shaopeng
Luo Li
Xue Jianzhong
Wang Xuandong
Huang Dezhong
Kou Shaolin
Zeng Yingying
Wei Yingping
Li Jun
Zhang Liang
description The invention discloses a construction method for a shield crossing railway line. The method comprises the steps that auxiliary beams and cross beams are adopted for reinforcing and suspending operation on railway tracks within the influential range of a shield lower-crossing embankment, and meanwhile railroad beds are subjected to grouting reinforcement; a first test tunneling section is constructed in the construction section of the shield crossing railway line, and construction parameters of remaining tunneling sections of the construction section of the shield crossing railway line are deduced according to shield propulsion parameters and ground settlement deformation rules; construction of the remaining tunneling sections of the construction section of the shield crossing railway line is completed according to the deduced construction parameters. According to the method, the auxiliary beams and the cross beams are adopted for reinforcing and suspending operation on the railway tracks within the influenti
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105888675A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105888675A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105888675A3</originalsourceid><addsrcrecordid>eNrjZDBxzs8rLikqTS7JzM9TyE0tychPUUjLL1IozshMzUlRSC7KLy7OzEtXKErMzClPrFTIycxL5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hgamFhYWZuamjsbEqAEAaBAtUA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for shield crossing railway line</title><source>esp@cenet</source><creator>Tian Ruiduan ; Shao Wenfei ; Zhao Sanlin ; Deng Yao ; Zhou Hao ; Li Shaopeng ; Luo Li ; Xue Jianzhong ; Wang Xuandong ; Huang Dezhong ; Kou Shaolin ; Zeng Yingying ; Wei Yingping ; Li Jun ; Zhang Liang</creator><creatorcontrib>Tian Ruiduan ; Shao Wenfei ; Zhao Sanlin ; Deng Yao ; Zhou Hao ; Li Shaopeng ; Luo Li ; Xue Jianzhong ; Wang Xuandong ; Huang Dezhong ; Kou Shaolin ; Zeng Yingying ; Wei Yingping ; Li Jun ; Zhang Liang</creatorcontrib><description>The invention discloses a construction method for a shield crossing railway line. The method comprises the steps that auxiliary beams and cross beams are adopted for reinforcing and suspending operation on railway tracks within the influential range of a shield lower-crossing embankment, and meanwhile railroad beds are subjected to grouting reinforcement; a first test tunneling section is constructed in the construction section of the shield crossing railway line, and construction parameters of remaining tunneling sections of the construction section of the shield crossing railway line are deduced according to shield propulsion parameters and ground settlement deformation rules; construction of the remaining tunneling sections of the construction section of the shield crossing railway line is completed according to the deduced construction parameters. According to the method, the auxiliary beams and the cross beams are adopted for reinforcing and suspending operation on the railway tracks within the influenti</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160824&amp;DB=EPODOC&amp;CC=CN&amp;NR=105888675A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160824&amp;DB=EPODOC&amp;CC=CN&amp;NR=105888675A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Tian Ruiduan</creatorcontrib><creatorcontrib>Shao Wenfei</creatorcontrib><creatorcontrib>Zhao Sanlin</creatorcontrib><creatorcontrib>Deng Yao</creatorcontrib><creatorcontrib>Zhou Hao</creatorcontrib><creatorcontrib>Li Shaopeng</creatorcontrib><creatorcontrib>Luo Li</creatorcontrib><creatorcontrib>Xue Jianzhong</creatorcontrib><creatorcontrib>Wang Xuandong</creatorcontrib><creatorcontrib>Huang Dezhong</creatorcontrib><creatorcontrib>Kou Shaolin</creatorcontrib><creatorcontrib>Zeng Yingying</creatorcontrib><creatorcontrib>Wei Yingping</creatorcontrib><creatorcontrib>Li Jun</creatorcontrib><creatorcontrib>Zhang Liang</creatorcontrib><title>Construction method for shield crossing railway line</title><description>The invention discloses a construction method for a shield crossing railway line. The method comprises the steps that auxiliary beams and cross beams are adopted for reinforcing and suspending operation on railway tracks within the influential range of a shield lower-crossing embankment, and meanwhile railroad beds are subjected to grouting reinforcement; a first test tunneling section is constructed in the construction section of the shield crossing railway line, and construction parameters of remaining tunneling sections of the construction section of the shield crossing railway line are deduced according to shield propulsion parameters and ground settlement deformation rules; construction of the remaining tunneling sections of the construction section of the shield crossing railway line is completed according to the deduced construction parameters. According to the method, the auxiliary beams and the cross beams are adopted for reinforcing and suspending operation on the railway tracks within the influenti</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBxzs8rLikqTS7JzM9TyE0tychPUUjLL1IozshMzUlRSC7KLy7OzEtXKErMzClPrFTIycxL5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hgamFhYWZuamjsbEqAEAaBAtUA</recordid><startdate>20160824</startdate><enddate>20160824</enddate><creator>Tian Ruiduan</creator><creator>Shao Wenfei</creator><creator>Zhao Sanlin</creator><creator>Deng Yao</creator><creator>Zhou Hao</creator><creator>Li Shaopeng</creator><creator>Luo Li</creator><creator>Xue Jianzhong</creator><creator>Wang Xuandong</creator><creator>Huang Dezhong</creator><creator>Kou Shaolin</creator><creator>Zeng Yingying</creator><creator>Wei Yingping</creator><creator>Li Jun</creator><creator>Zhang Liang</creator><scope>EVB</scope></search><sort><creationdate>20160824</creationdate><title>Construction method for shield crossing railway line</title><author>Tian Ruiduan ; Shao Wenfei ; Zhao Sanlin ; Deng Yao ; Zhou Hao ; Li Shaopeng ; Luo Li ; Xue Jianzhong ; Wang Xuandong ; Huang Dezhong ; Kou Shaolin ; Zeng Yingying ; Wei Yingping ; Li Jun ; Zhang Liang</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105888675A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>Tian Ruiduan</creatorcontrib><creatorcontrib>Shao Wenfei</creatorcontrib><creatorcontrib>Zhao Sanlin</creatorcontrib><creatorcontrib>Deng Yao</creatorcontrib><creatorcontrib>Zhou Hao</creatorcontrib><creatorcontrib>Li Shaopeng</creatorcontrib><creatorcontrib>Luo Li</creatorcontrib><creatorcontrib>Xue Jianzhong</creatorcontrib><creatorcontrib>Wang Xuandong</creatorcontrib><creatorcontrib>Huang Dezhong</creatorcontrib><creatorcontrib>Kou Shaolin</creatorcontrib><creatorcontrib>Zeng Yingying</creatorcontrib><creatorcontrib>Wei Yingping</creatorcontrib><creatorcontrib>Li Jun</creatorcontrib><creatorcontrib>Zhang Liang</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Tian Ruiduan</au><au>Shao Wenfei</au><au>Zhao Sanlin</au><au>Deng Yao</au><au>Zhou Hao</au><au>Li Shaopeng</au><au>Luo Li</au><au>Xue Jianzhong</au><au>Wang Xuandong</au><au>Huang Dezhong</au><au>Kou Shaolin</au><au>Zeng Yingying</au><au>Wei Yingping</au><au>Li Jun</au><au>Zhang Liang</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for shield crossing railway line</title><date>2016-08-24</date><risdate>2016</risdate><abstract>The invention discloses a construction method for a shield crossing railway line. The method comprises the steps that auxiliary beams and cross beams are adopted for reinforcing and suspending operation on railway tracks within the influential range of a shield lower-crossing embankment, and meanwhile railroad beds are subjected to grouting reinforcement; a first test tunneling section is constructed in the construction section of the shield crossing railway line, and construction parameters of remaining tunneling sections of the construction section of the shield crossing railway line are deduced according to shield propulsion parameters and ground settlement deformation rules; construction of the remaining tunneling sections of the construction section of the shield crossing railway line is completed according to the deduced construction parameters. According to the method, the auxiliary beams and the cross beams are adopted for reinforcing and suspending operation on the railway tracks within the influenti</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN105888675A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Construction method for shield crossing railway line
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T19%3A34%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Tian%20Ruiduan&rft.date=2016-08-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105888675A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true