Steel slag water-permeable pavement structure and construction method thereof
The invention discloses a steel slag water-permeable pavement structure and a construction method thereof. The steel slag water-permeable pavement structure is arranged on a roadbed and sequentially comprises a surface layer, a base layer, a cushion layer and a siphon connection layer from top to bo...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHAO KAI ZHAO JIANLIN ZHAO FANGZHONG XU SHEYANG DONG RONGZHEN |
description | The invention discloses a steel slag water-permeable pavement structure and a construction method thereof. The steel slag water-permeable pavement structure is arranged on a roadbed and sequentially comprises a surface layer, a base layer, a cushion layer and a siphon connection layer from top to bottom, wherein the surface layer is composed of steel slag with the particle size being 0.1-2 mm by means of mixed curing of adhesives; the basic layer is composed of aggregate with the particle size being 2-15 mm by means of mixed curing of adhesives; the cushion layer is composed of aggregate with the particle size being 2-30 mm by means of mixed curing of adhesives; the siphon connection layer is formed by mixing steel slag with the particle size being 2-15 mm and plain soil in a tamping mode. By means of the performance that water permeability is achieved after steel slag and adhesives are cured, rainwater on a pavement enters underground water through the permeating effect, it is avoided that rainwater forms ru |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105625137A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105625137A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105625137A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQRuFtLES9w3iAgDFEawmKjTbah3HzJxF2d5bdiV7fQg9g9eDjzc3lpoCj7HigNytSEZE8-OFAkV_wCEpZ02R1SiAOHVkJX3hKIA8dpSMdkSD90sx6dhmrXxdmfTrem3OBKC1yZIsAbZtrual327qs9ofqn-cDML027g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Steel slag water-permeable pavement structure and construction method thereof</title><source>esp@cenet</source><creator>ZHAO KAI ; ZHAO JIANLIN ; ZHAO FANGZHONG ; XU SHEYANG ; DONG RONGZHEN</creator><creatorcontrib>ZHAO KAI ; ZHAO JIANLIN ; ZHAO FANGZHONG ; XU SHEYANG ; DONG RONGZHEN</creatorcontrib><description>The invention discloses a steel slag water-permeable pavement structure and a construction method thereof. The steel slag water-permeable pavement structure is arranged on a roadbed and sequentially comprises a surface layer, a base layer, a cushion layer and a siphon connection layer from top to bottom, wherein the surface layer is composed of steel slag with the particle size being 0.1-2 mm by means of mixed curing of adhesives; the basic layer is composed of aggregate with the particle size being 2-15 mm by means of mixed curing of adhesives; the cushion layer is composed of aggregate with the particle size being 2-30 mm by means of mixed curing of adhesives; the siphon connection layer is formed by mixing steel slag with the particle size being 2-15 mm and plain soil in a tamping mode. By means of the performance that water permeability is achieved after steel slag and adhesives are cured, rainwater on a pavement enters underground water through the permeating effect, it is avoided that rainwater forms ru</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20160601&DB=EPODOC&CC=CN&NR=105625137A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20160601&DB=EPODOC&CC=CN&NR=105625137A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO KAI</creatorcontrib><creatorcontrib>ZHAO JIANLIN</creatorcontrib><creatorcontrib>ZHAO FANGZHONG</creatorcontrib><creatorcontrib>XU SHEYANG</creatorcontrib><creatorcontrib>DONG RONGZHEN</creatorcontrib><title>Steel slag water-permeable pavement structure and construction method thereof</title><description>The invention discloses a steel slag water-permeable pavement structure and a construction method thereof. The steel slag water-permeable pavement structure is arranged on a roadbed and sequentially comprises a surface layer, a base layer, a cushion layer and a siphon connection layer from top to bottom, wherein the surface layer is composed of steel slag with the particle size being 0.1-2 mm by means of mixed curing of adhesives; the basic layer is composed of aggregate with the particle size being 2-15 mm by means of mixed curing of adhesives; the cushion layer is composed of aggregate with the particle size being 2-30 mm by means of mixed curing of adhesives; the siphon connection layer is formed by mixing steel slag with the particle size being 2-15 mm and plain soil in a tamping mode. By means of the performance that water permeability is achieved after steel slag and adhesives are cured, rainwater on a pavement enters underground water through the permeating effect, it is avoided that rainwater forms ru</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQRuFtLES9w3iAgDFEawmKjTbah3HzJxF2d5bdiV7fQg9g9eDjzc3lpoCj7HigNytSEZE8-OFAkV_wCEpZ02R1SiAOHVkJX3hKIA8dpSMdkSD90sx6dhmrXxdmfTrem3OBKC1yZIsAbZtrual327qs9ofqn-cDML027g</recordid><startdate>20160601</startdate><enddate>20160601</enddate><creator>ZHAO KAI</creator><creator>ZHAO JIANLIN</creator><creator>ZHAO FANGZHONG</creator><creator>XU SHEYANG</creator><creator>DONG RONGZHEN</creator><scope>EVB</scope></search><sort><creationdate>20160601</creationdate><title>Steel slag water-permeable pavement structure and construction method thereof</title><author>ZHAO KAI ; ZHAO JIANLIN ; ZHAO FANGZHONG ; XU SHEYANG ; DONG RONGZHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105625137A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2016</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO KAI</creatorcontrib><creatorcontrib>ZHAO JIANLIN</creatorcontrib><creatorcontrib>ZHAO FANGZHONG</creatorcontrib><creatorcontrib>XU SHEYANG</creatorcontrib><creatorcontrib>DONG RONGZHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO KAI</au><au>ZHAO JIANLIN</au><au>ZHAO FANGZHONG</au><au>XU SHEYANG</au><au>DONG RONGZHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Steel slag water-permeable pavement structure and construction method thereof</title><date>2016-06-01</date><risdate>2016</risdate><abstract>The invention discloses a steel slag water-permeable pavement structure and a construction method thereof. The steel slag water-permeable pavement structure is arranged on a roadbed and sequentially comprises a surface layer, a base layer, a cushion layer and a siphon connection layer from top to bottom, wherein the surface layer is composed of steel slag with the particle size being 0.1-2 mm by means of mixed curing of adhesives; the basic layer is composed of aggregate with the particle size being 2-15 mm by means of mixed curing of adhesives; the cushion layer is composed of aggregate with the particle size being 2-30 mm by means of mixed curing of adhesives; the siphon connection layer is formed by mixing steel slag with the particle size being 2-15 mm and plain soil in a tamping mode. By means of the performance that water permeability is achieved after steel slag and adhesives are cured, rainwater on a pavement enters underground water through the permeating effect, it is avoided that rainwater forms ru</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN105625137A |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE FIXED CONSTRUCTIONS MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR |
title | Steel slag water-permeable pavement structure and construction method thereof |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T16%3A10%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20KAI&rft.date=2016-06-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105625137A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |