Construction method of sealed joint of composite geomembrane face dam
The invention discloses a construction method of a sealed joint of a composite geomembrane face dam. A new structure is provided with regard to a design of burying a geomembrane, which is several meters long, in an existing sealed joint of a geomembrane face dam in a folding manner to increase a see...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!