Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway

The invention discloses a cutting, splitting and breaking transformation construction method for an existing overall ballast bed of a subway. The method includes the steps that the ballast bed is perpendicularly cut on a concrete ballast bed plate in the longitudinal direction of a line within the d...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GONG YUAN, WANG WEI, SHEN YUN, SHI HAIFENG, YIN YESUO, LEI MING, ZHU YANXIN, ZHOU DENGHUI, NIAN SHENGLI, JIA BINGYI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GONG YUAN
WANG WEI
SHEN YUN
SHI HAIFENG
YIN YESUO
LEI MING
ZHU YANXIN
ZHOU DENGHUI
NIAN SHENGLI
JIA BINGYI
description The invention discloses a cutting, splitting and breaking transformation construction method for an existing overall ballast bed of a subway. The method includes the steps that the ballast bed is perpendicularly cut on a concrete ballast bed plate in the longitudinal direction of a line within the distance of not larger than 3.6 cm through a wall saw, and cutting is conducted to the depth that the part between a concrete face to steel bars is cut off but a pipe piece is not damaged; then, a coring drilling machine is used for drilling along a cutting line, the number of drill holes is 2-6, the diameter of the drill holes is determined according to requirements, the depth of the holes is determined according to the requirement of a splitting bar, the hydraulic splitting bar is inserted into the drill holes to adjust the splitting direction, and pressurizing expanding is conducted until the plate disengages from a pipe wall; and finally, a cantilever crane in a subway tunnel is used for craning the existing broken plate and conducting construction to newly lay a floating plate, and accordingly the transformation of the existing ballast bed is completed. The method is low in construction cost, easy to operate, high in construction speed and low in noise, construction is not stopped on an operation line, safety and reliability are achieved, and the requirements for urban civilized construction, operation line transportation, operation line safety and construction efficiency are met. The popularization prospects are wide.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105350408A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105350408A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105350408A3</originalsourceid><addsrcrecordid>eNqNi70KwkAQhK-xEPUd1l4hEgO2EhQrK_uwl9vo4eU23G78eXtj8AFsZuZjZqamLXtVH68rkC74MQJGBzYR3r-gCaM0nFpUzxFqjqKpr0doSW_sYGiBXl7GMz8oYQhgB0FRsOSAG5DePvE9N5MGg9Di5zOzPB4u5WlNHVckHdYUSavyvMmKvMi22W6f_7P5AP1NQw4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway</title><source>esp@cenet</source><creator>GONG YUAN ; WANG WEI ; SHEN YUN ; SHI HAIFENG ; YIN YESUO ; LEI MING ; ZHU YANXIN ; ZHOU DENGHUI ; NIAN SHENGLI ; JIA BINGYI</creator><creatorcontrib>GONG YUAN ; WANG WEI ; SHEN YUN ; SHI HAIFENG ; YIN YESUO ; LEI MING ; ZHU YANXIN ; ZHOU DENGHUI ; NIAN SHENGLI ; JIA BINGYI</creatorcontrib><description>The invention discloses a cutting, splitting and breaking transformation construction method for an existing overall ballast bed of a subway. The method includes the steps that the ballast bed is perpendicularly cut on a concrete ballast bed plate in the longitudinal direction of a line within the distance of not larger than 3.6 cm through a wall saw, and cutting is conducted to the depth that the part between a concrete face to steel bars is cut off but a pipe piece is not damaged; then, a coring drilling machine is used for drilling along a cutting line, the number of drill holes is 2-6, the diameter of the drill holes is determined according to requirements, the depth of the holes is determined according to the requirement of a splitting bar, the hydraulic splitting bar is inserted into the drill holes to adjust the splitting direction, and pressurizing expanding is conducted until the plate disengages from a pipe wall; and finally, a cantilever crane in a subway tunnel is used for craning the existing broken plate and conducting construction to newly lay a floating plate, and accordingly the transformation of the existing ballast bed is completed. The method is low in construction cost, easy to operate, high in construction speed and low in noise, construction is not stopped on an operation line, safety and reliability are achieved, and the requirements for urban civilized construction, operation line transportation, operation line safety and construction efficiency are met. The popularization prospects are wide.</description><language>eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; PERMANENT WAY ; PERMANENT-WAY TOOLS</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160224&amp;DB=EPODOC&amp;CC=CN&amp;NR=105350408A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25568,76551</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160224&amp;DB=EPODOC&amp;CC=CN&amp;NR=105350408A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GONG YUAN</creatorcontrib><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>SHEN YUN</creatorcontrib><creatorcontrib>SHI HAIFENG</creatorcontrib><creatorcontrib>YIN YESUO</creatorcontrib><creatorcontrib>LEI MING</creatorcontrib><creatorcontrib>ZHU YANXIN</creatorcontrib><creatorcontrib>ZHOU DENGHUI</creatorcontrib><creatorcontrib>NIAN SHENGLI</creatorcontrib><creatorcontrib>JIA BINGYI</creatorcontrib><title>Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway</title><description>The invention discloses a cutting, splitting and breaking transformation construction method for an existing overall ballast bed of a subway. The method includes the steps that the ballast bed is perpendicularly cut on a concrete ballast bed plate in the longitudinal direction of a line within the distance of not larger than 3.6 cm through a wall saw, and cutting is conducted to the depth that the part between a concrete face to steel bars is cut off but a pipe piece is not damaged; then, a coring drilling machine is used for drilling along a cutting line, the number of drill holes is 2-6, the diameter of the drill holes is determined according to requirements, the depth of the holes is determined according to the requirement of a splitting bar, the hydraulic splitting bar is inserted into the drill holes to adjust the splitting direction, and pressurizing expanding is conducted until the plate disengages from a pipe wall; and finally, a cantilever crane in a subway tunnel is used for craning the existing broken plate and conducting construction to newly lay a floating plate, and accordingly the transformation of the existing ballast bed is completed. The method is low in construction cost, easy to operate, high in construction speed and low in noise, construction is not stopped on an operation line, safety and reliability are achieved, and the requirements for urban civilized construction, operation line transportation, operation line safety and construction efficiency are met. The popularization prospects are wide.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi70KwkAQhK-xEPUd1l4hEgO2EhQrK_uwl9vo4eU23G78eXtj8AFsZuZjZqamLXtVH68rkC74MQJGBzYR3r-gCaM0nFpUzxFqjqKpr0doSW_sYGiBXl7GMz8oYQhgB0FRsOSAG5DePvE9N5MGg9Di5zOzPB4u5WlNHVckHdYUSavyvMmKvMi22W6f_7P5AP1NQw4</recordid><startdate>20160224</startdate><enddate>20160224</enddate><creator>GONG YUAN</creator><creator>WANG WEI</creator><creator>SHEN YUN</creator><creator>SHI HAIFENG</creator><creator>YIN YESUO</creator><creator>LEI MING</creator><creator>ZHU YANXIN</creator><creator>ZHOU DENGHUI</creator><creator>NIAN SHENGLI</creator><creator>JIA BINGYI</creator><scope>EVB</scope></search><sort><creationdate>20160224</creationdate><title>Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway</title><author>GONG YUAN ; WANG WEI ; SHEN YUN ; SHI HAIFENG ; YIN YESUO ; LEI MING ; ZHU YANXIN ; ZHOU DENGHUI ; NIAN SHENGLI ; JIA BINGYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105350408A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2016</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><toplevel>online_resources</toplevel><creatorcontrib>GONG YUAN</creatorcontrib><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>SHEN YUN</creatorcontrib><creatorcontrib>SHI HAIFENG</creatorcontrib><creatorcontrib>YIN YESUO</creatorcontrib><creatorcontrib>LEI MING</creatorcontrib><creatorcontrib>ZHU YANXIN</creatorcontrib><creatorcontrib>ZHOU DENGHUI</creatorcontrib><creatorcontrib>NIAN SHENGLI</creatorcontrib><creatorcontrib>JIA BINGYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GONG YUAN</au><au>WANG WEI</au><au>SHEN YUN</au><au>SHI HAIFENG</au><au>YIN YESUO</au><au>LEI MING</au><au>ZHU YANXIN</au><au>ZHOU DENGHUI</au><au>NIAN SHENGLI</au><au>JIA BINGYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway</title><date>2016-02-24</date><risdate>2016</risdate><abstract>The invention discloses a cutting, splitting and breaking transformation construction method for an existing overall ballast bed of a subway. The method includes the steps that the ballast bed is perpendicularly cut on a concrete ballast bed plate in the longitudinal direction of a line within the distance of not larger than 3.6 cm through a wall saw, and cutting is conducted to the depth that the part between a concrete face to steel bars is cut off but a pipe piece is not damaged; then, a coring drilling machine is used for drilling along a cutting line, the number of drill holes is 2-6, the diameter of the drill holes is determined according to requirements, the depth of the holes is determined according to the requirement of a splitting bar, the hydraulic splitting bar is inserted into the drill holes to adjust the splitting direction, and pressurizing expanding is conducted until the plate disengages from a pipe wall; and finally, a cantilever crane in a subway tunnel is used for craning the existing broken plate and conducting construction to newly lay a floating plate, and accordingly the transformation of the existing ballast bed is completed. The method is low in construction cost, easy to operate, high in construction speed and low in noise, construction is not stopped on an operation line, safety and reliability are achieved, and the requirements for urban civilized construction, operation line transportation, operation line safety and construction efficiency are met. The popularization prospects are wide.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105350408A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
MACHINES FOR MAKING RAILWAYS OF ALL KINDS
PERMANENT WAY
PERMANENT-WAY TOOLS
title Cutting, splitting and breaking transformation construction method for existing overall ballast bed of subway
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-16T15%3A32%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GONG%20YUAN&rft.date=2016-02-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105350408A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true