Drilling-punching integral construction method for gas extraction drill hole

The invention discloses a drilling-punching integral construction method for a gas extraction drill hole. A drilling-punching integral drill bit is installed at the front end of a drill stem of a drilling machine, the rear end of the drilling machine is connected with a high-low pressure water sourc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YAO XUEQING, WANG ZHIJIAN, YU HONGQING, WANG LIANGJIN, LIU XINZHONG, WEI PEIJIN, CHANG JIANXIN, ZHENG QINLING, WANG YONGXIN, GUO YANFEI, GUI HONGWEI, ZHANG QINGTIAN, WU BAOZHONG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YAO XUEQING
WANG ZHIJIAN
YU HONGQING
WANG LIANGJIN
LIU XINZHONG
WEI PEIJIN
CHANG JIANXIN
ZHENG QINLING
WANG YONGXIN
GUO YANFEI
GUI HONGWEI
ZHANG QINGTIAN
WU BAOZHONG
description The invention discloses a drilling-punching integral construction method for a gas extraction drill hole. A drilling-punching integral drill bit is installed at the front end of a drill stem of a drilling machine, the rear end of the drilling machine is connected with a high-low pressure water source converting device through a high pressure sealed water tail, in the hole-drilling construction process, firstly, a low pressure water source is provided for the drilling machine through the high-low pressure water source converting device, variable flow nozzles on the drilling-punching integral drill bit are all open, the slag discharging requirement in the hole-drilling construction process is guaranteed, when hole-drilling construction is ended and punching is started, the drilling machine is not needed to be withdrawn, a high pressure water source is provided for the drilling machine through the high-low pressure water source converting device, meanwhile, the variable flow nozzles in the oblique front direction and the radial direction are closed, only the variable flow nozzles in the direct front direction are reserved for draining water, and hydraulic punching is conducted. According to the method, the integral drill bit is used in the layer-penetrating hole-drilling construction process and the hydraulic punching process, requirements for cooling the drill bit and discharging slag in the low-water-pressure hole-drilling construction process can be satisfied, high-pressure water jet flow can be formed for conducting punching in the high-water-pressure hydraulic punching process, the hydraulic punching process is simplified, and construction efficiency is improved.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105298391A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105298391A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105298391A3</originalsourceid><addsrcrecordid>eNrjZPBxKcrMycnMS9ctKM1LzgAyFDLzSlLTixJzFJLz84pLikqTSzLz8xRyU0sy8lMU0vKLFNITixVSK0qKEiEyKSATFDLyc1J5GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hgamRpYWxpaGjMTFqAPmQNoE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Drilling-punching integral construction method for gas extraction drill hole</title><source>esp@cenet</source><creator>YAO XUEQING ; WANG ZHIJIAN ; YU HONGQING ; WANG LIANGJIN ; LIU XINZHONG ; WEI PEIJIN ; CHANG JIANXIN ; ZHENG QINLING ; WANG YONGXIN ; GUO YANFEI ; GUI HONGWEI ; ZHANG QINGTIAN ; WU BAOZHONG</creator><creatorcontrib>YAO XUEQING ; WANG ZHIJIAN ; YU HONGQING ; WANG LIANGJIN ; LIU XINZHONG ; WEI PEIJIN ; CHANG JIANXIN ; ZHENG QINLING ; WANG YONGXIN ; GUO YANFEI ; GUI HONGWEI ; ZHANG QINGTIAN ; WU BAOZHONG</creatorcontrib><description>The invention discloses a drilling-punching integral construction method for a gas extraction drill hole. A drilling-punching integral drill bit is installed at the front end of a drill stem of a drilling machine, the rear end of the drilling machine is connected with a high-low pressure water source converting device through a high pressure sealed water tail, in the hole-drilling construction process, firstly, a low pressure water source is provided for the drilling machine through the high-low pressure water source converting device, variable flow nozzles on the drilling-punching integral drill bit are all open, the slag discharging requirement in the hole-drilling construction process is guaranteed, when hole-drilling construction is ended and punching is started, the drilling machine is not needed to be withdrawn, a high pressure water source is provided for the drilling machine through the high-low pressure water source converting device, meanwhile, the variable flow nozzles in the oblique front direction and the radial direction are closed, only the variable flow nozzles in the direct front direction are reserved for draining water, and hydraulic punching is conducted. According to the method, the integral drill bit is used in the layer-penetrating hole-drilling construction process and the hydraulic punching process, requirements for cooling the drill bit and discharging slag in the low-water-pressure hole-drilling construction process can be satisfied, high-pressure water jet flow can be formed for conducting punching in the high-water-pressure hydraulic punching process, the hydraulic punching process is simplified, and construction efficiency is improved.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160203&amp;DB=EPODOC&amp;CC=CN&amp;NR=105298391A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160203&amp;DB=EPODOC&amp;CC=CN&amp;NR=105298391A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAO XUEQING</creatorcontrib><creatorcontrib>WANG ZHIJIAN</creatorcontrib><creatorcontrib>YU HONGQING</creatorcontrib><creatorcontrib>WANG LIANGJIN</creatorcontrib><creatorcontrib>LIU XINZHONG</creatorcontrib><creatorcontrib>WEI PEIJIN</creatorcontrib><creatorcontrib>CHANG JIANXIN</creatorcontrib><creatorcontrib>ZHENG QINLING</creatorcontrib><creatorcontrib>WANG YONGXIN</creatorcontrib><creatorcontrib>GUO YANFEI</creatorcontrib><creatorcontrib>GUI HONGWEI</creatorcontrib><creatorcontrib>ZHANG QINGTIAN</creatorcontrib><creatorcontrib>WU BAOZHONG</creatorcontrib><title>Drilling-punching integral construction method for gas extraction drill hole</title><description>The invention discloses a drilling-punching integral construction method for a gas extraction drill hole. A drilling-punching integral drill bit is installed at the front end of a drill stem of a drilling machine, the rear end of the drilling machine is connected with a high-low pressure water source converting device through a high pressure sealed water tail, in the hole-drilling construction process, firstly, a low pressure water source is provided for the drilling machine through the high-low pressure water source converting device, variable flow nozzles on the drilling-punching integral drill bit are all open, the slag discharging requirement in the hole-drilling construction process is guaranteed, when hole-drilling construction is ended and punching is started, the drilling machine is not needed to be withdrawn, a high pressure water source is provided for the drilling machine through the high-low pressure water source converting device, meanwhile, the variable flow nozzles in the oblique front direction and the radial direction are closed, only the variable flow nozzles in the direct front direction are reserved for draining water, and hydraulic punching is conducted. According to the method, the integral drill bit is used in the layer-penetrating hole-drilling construction process and the hydraulic punching process, requirements for cooling the drill bit and discharging slag in the low-water-pressure hole-drilling construction process can be satisfied, high-pressure water jet flow can be formed for conducting punching in the high-water-pressure hydraulic punching process, the hydraulic punching process is simplified, and construction efficiency is improved.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPBxKcrMycnMS9ctKM1LzgAyFDLzSlLTixJzFJLz84pLikqTSzLz8xRyU0sy8lMU0vKLFNITixVSK0qKEiEyKSATFDLyc1J5GFjTEnOKU3mhNDeDoptriLOHbmpBfnxqcUFicmpeakm8s5-hgamRpYWxpaGjMTFqAPmQNoE</recordid><startdate>20160203</startdate><enddate>20160203</enddate><creator>YAO XUEQING</creator><creator>WANG ZHIJIAN</creator><creator>YU HONGQING</creator><creator>WANG LIANGJIN</creator><creator>LIU XINZHONG</creator><creator>WEI PEIJIN</creator><creator>CHANG JIANXIN</creator><creator>ZHENG QINLING</creator><creator>WANG YONGXIN</creator><creator>GUO YANFEI</creator><creator>GUI HONGWEI</creator><creator>ZHANG QINGTIAN</creator><creator>WU BAOZHONG</creator><scope>EVB</scope></search><sort><creationdate>20160203</creationdate><title>Drilling-punching integral construction method for gas extraction drill hole</title><author>YAO XUEQING ; WANG ZHIJIAN ; YU HONGQING ; WANG LIANGJIN ; LIU XINZHONG ; WEI PEIJIN ; CHANG JIANXIN ; ZHENG QINLING ; WANG YONGXIN ; GUO YANFEI ; GUI HONGWEI ; ZHANG QINGTIAN ; WU BAOZHONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105298391A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2016</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>YAO XUEQING</creatorcontrib><creatorcontrib>WANG ZHIJIAN</creatorcontrib><creatorcontrib>YU HONGQING</creatorcontrib><creatorcontrib>WANG LIANGJIN</creatorcontrib><creatorcontrib>LIU XINZHONG</creatorcontrib><creatorcontrib>WEI PEIJIN</creatorcontrib><creatorcontrib>CHANG JIANXIN</creatorcontrib><creatorcontrib>ZHENG QINLING</creatorcontrib><creatorcontrib>WANG YONGXIN</creatorcontrib><creatorcontrib>GUO YANFEI</creatorcontrib><creatorcontrib>GUI HONGWEI</creatorcontrib><creatorcontrib>ZHANG QINGTIAN</creatorcontrib><creatorcontrib>WU BAOZHONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAO XUEQING</au><au>WANG ZHIJIAN</au><au>YU HONGQING</au><au>WANG LIANGJIN</au><au>LIU XINZHONG</au><au>WEI PEIJIN</au><au>CHANG JIANXIN</au><au>ZHENG QINLING</au><au>WANG YONGXIN</au><au>GUO YANFEI</au><au>GUI HONGWEI</au><au>ZHANG QINGTIAN</au><au>WU BAOZHONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Drilling-punching integral construction method for gas extraction drill hole</title><date>2016-02-03</date><risdate>2016</risdate><abstract>The invention discloses a drilling-punching integral construction method for a gas extraction drill hole. A drilling-punching integral drill bit is installed at the front end of a drill stem of a drilling machine, the rear end of the drilling machine is connected with a high-low pressure water source converting device through a high pressure sealed water tail, in the hole-drilling construction process, firstly, a low pressure water source is provided for the drilling machine through the high-low pressure water source converting device, variable flow nozzles on the drilling-punching integral drill bit are all open, the slag discharging requirement in the hole-drilling construction process is guaranteed, when hole-drilling construction is ended and punching is started, the drilling machine is not needed to be withdrawn, a high pressure water source is provided for the drilling machine through the high-low pressure water source converting device, meanwhile, the variable flow nozzles in the oblique front direction and the radial direction are closed, only the variable flow nozzles in the direct front direction are reserved for draining water, and hydraulic punching is conducted. According to the method, the integral drill bit is used in the layer-penetrating hole-drilling construction process and the hydraulic punching process, requirements for cooling the drill bit and discharging slag in the low-water-pressure hole-drilling construction process can be satisfied, high-pressure water jet flow can be formed for conducting punching in the high-water-pressure hydraulic punching process, the hydraulic punching process is simplified, and construction efficiency is improved.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105298391A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
title Drilling-punching integral construction method for gas extraction drill hole
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T16%3A34%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAO%20XUEQING&rft.date=2016-02-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105298391A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true