Advance support construction method for high-strength pipe shed of tunnel
The invention discloses an advance support construction method for a high-strength pipe shed of a tunnel. A process for carrying out advance support construction on a pipe shed of one segment of a constructed tunnel comprises the following steps: (1) constructing support arches and guide pipes; (2)...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | QI FENGJUN WANG ZHIJUN TAN DEQING FENG JUNWU WU XIANRONG LUO ZONGFAN ZHANG QING |
description | The invention discloses an advance support construction method for a high-strength pipe shed of a tunnel. A process for carrying out advance support construction on a pipe shed of one segment of a constructed tunnel comprises the following steps: (1) constructing support arches and guide pipes; (2) installing a drilling machine and a grouting machine in place; (3) carrying out advance support construction on the pipe shed: (301) preparing before drilling; (302) drilling pipe joints at front ends and synchronously grouting; (303) connecting the pipe joints; (304) continuously drilling and synchronously grouting; (305) repeating the steps (303) and (304) many times until the drilling processes of pipes of the current constructed pipe shed are finished; (306) blocking drill holes; (307) carrying out grouting construction on final holes; (308) repeating the steps (301) to (307) many times until all advance support construction processes of the pipes of the pipe shed are finished; and (4) carrying out excavation construction on the tunnel. The method disclosed by the invention is simple in step, reasonable in design, simple and convenient in construction and good in support effect; and by adopting automatic drilling type high-strength pipes of the pipe shed, the advance support process of the tunnel can be simply, conveniently and quickly finished. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105201517A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105201517A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105201517A3</originalsourceid><addsrcrecordid>eNqNizEOwjAMALswIOAP5gGVGlDFXFUgWJjYqyhxmkjFthKH99OBBzDdcHfb5jH4jyWHUKoIZwXHVDRXp4kJ3qiRPQTOENMc29UgzRpBkqxLRA8cQCsRLvtmE-xS8PDjrjnerq_x3qLwhEWsQ0Kdxqfp-lNnenMZzv80XxqiNPc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Advance support construction method for high-strength pipe shed of tunnel</title><source>esp@cenet</source><creator>QI FENGJUN ; WANG ZHIJUN ; TAN DEQING ; FENG JUNWU ; WU XIANRONG ; LUO ZONGFAN ; ZHANG QING</creator><creatorcontrib>QI FENGJUN ; WANG ZHIJUN ; TAN DEQING ; FENG JUNWU ; WU XIANRONG ; LUO ZONGFAN ; ZHANG QING</creatorcontrib><description>The invention discloses an advance support construction method for a high-strength pipe shed of a tunnel. A process for carrying out advance support construction on a pipe shed of one segment of a constructed tunnel comprises the following steps: (1) constructing support arches and guide pipes; (2) installing a drilling machine and a grouting machine in place; (3) carrying out advance support construction on the pipe shed: (301) preparing before drilling; (302) drilling pipe joints at front ends and synchronously grouting; (303) connecting the pipe joints; (304) continuously drilling and synchronously grouting; (305) repeating the steps (303) and (304) many times until the drilling processes of pipes of the current constructed pipe shed are finished; (306) blocking drill holes; (307) carrying out grouting construction on final holes; (308) repeating the steps (301) to (307) many times until all advance support construction processes of the pipes of the pipe shed are finished; and (4) carrying out excavation construction on the tunnel. The method disclosed by the invention is simple in step, reasonable in design, simple and convenient in construction and good in support effect; and by adopting automatic drilling type high-strength pipes of the pipe shed, the advance support process of the tunnel can be simply, conveniently and quickly finished.</description><language>eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151230&DB=EPODOC&CC=CN&NR=105201517A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151230&DB=EPODOC&CC=CN&NR=105201517A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>QI FENGJUN</creatorcontrib><creatorcontrib>WANG ZHIJUN</creatorcontrib><creatorcontrib>TAN DEQING</creatorcontrib><creatorcontrib>FENG JUNWU</creatorcontrib><creatorcontrib>WU XIANRONG</creatorcontrib><creatorcontrib>LUO ZONGFAN</creatorcontrib><creatorcontrib>ZHANG QING</creatorcontrib><title>Advance support construction method for high-strength pipe shed of tunnel</title><description>The invention discloses an advance support construction method for a high-strength pipe shed of a tunnel. A process for carrying out advance support construction on a pipe shed of one segment of a constructed tunnel comprises the following steps: (1) constructing support arches and guide pipes; (2) installing a drilling machine and a grouting machine in place; (3) carrying out advance support construction on the pipe shed: (301) preparing before drilling; (302) drilling pipe joints at front ends and synchronously grouting; (303) connecting the pipe joints; (304) continuously drilling and synchronously grouting; (305) repeating the steps (303) and (304) many times until the drilling processes of pipes of the current constructed pipe shed are finished; (306) blocking drill holes; (307) carrying out grouting construction on final holes; (308) repeating the steps (301) to (307) many times until all advance support construction processes of the pipes of the pipe shed are finished; and (4) carrying out excavation construction on the tunnel. The method disclosed by the invention is simple in step, reasonable in design, simple and convenient in construction and good in support effect; and by adopting automatic drilling type high-strength pipes of the pipe shed, the advance support process of the tunnel can be simply, conveniently and quickly finished.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEOwjAMALswIOAP5gGVGlDFXFUgWJjYqyhxmkjFthKH99OBBzDdcHfb5jH4jyWHUKoIZwXHVDRXp4kJ3qiRPQTOENMc29UgzRpBkqxLRA8cQCsRLvtmE-xS8PDjrjnerq_x3qLwhEWsQ0Kdxqfp-lNnenMZzv80XxqiNPc</recordid><startdate>20151230</startdate><enddate>20151230</enddate><creator>QI FENGJUN</creator><creator>WANG ZHIJUN</creator><creator>TAN DEQING</creator><creator>FENG JUNWU</creator><creator>WU XIANRONG</creator><creator>LUO ZONGFAN</creator><creator>ZHANG QING</creator><scope>EVB</scope></search><sort><creationdate>20151230</creationdate><title>Advance support construction method for high-strength pipe shed of tunnel</title><author>QI FENGJUN ; WANG ZHIJUN ; TAN DEQING ; FENG JUNWU ; WU XIANRONG ; LUO ZONGFAN ; ZHANG QING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105201517A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>QI FENGJUN</creatorcontrib><creatorcontrib>WANG ZHIJUN</creatorcontrib><creatorcontrib>TAN DEQING</creatorcontrib><creatorcontrib>FENG JUNWU</creatorcontrib><creatorcontrib>WU XIANRONG</creatorcontrib><creatorcontrib>LUO ZONGFAN</creatorcontrib><creatorcontrib>ZHANG QING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>QI FENGJUN</au><au>WANG ZHIJUN</au><au>TAN DEQING</au><au>FENG JUNWU</au><au>WU XIANRONG</au><au>LUO ZONGFAN</au><au>ZHANG QING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Advance support construction method for high-strength pipe shed of tunnel</title><date>2015-12-30</date><risdate>2015</risdate><abstract>The invention discloses an advance support construction method for a high-strength pipe shed of a tunnel. A process for carrying out advance support construction on a pipe shed of one segment of a constructed tunnel comprises the following steps: (1) constructing support arches and guide pipes; (2) installing a drilling machine and a grouting machine in place; (3) carrying out advance support construction on the pipe shed: (301) preparing before drilling; (302) drilling pipe joints at front ends and synchronously grouting; (303) connecting the pipe joints; (304) continuously drilling and synchronously grouting; (305) repeating the steps (303) and (304) many times until the drilling processes of pipes of the current constructed pipe shed are finished; (306) blocking drill holes; (307) carrying out grouting construction on final holes; (308) repeating the steps (301) to (307) many times until all advance support construction processes of the pipes of the pipe shed are finished; and (4) carrying out excavation construction on the tunnel. The method disclosed by the invention is simple in step, reasonable in design, simple and convenient in construction and good in support effect; and by adopting automatic drilling type high-strength pipes of the pipe shed, the advance support process of the tunnel can be simply, conveniently and quickly finished.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_CN105201517A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Advance support construction method for high-strength pipe shed of tunnel |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T08%3A26%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=QI%20FENGJUN&rft.date=2015-12-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105201517A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |