Composite seepage preventing structure for large karst cave in karst region and construction method thereof

The invention discloses a composite seepage preventing structure for a large karst cave in a karst region and a construction method thereof, and belongs to the technical field of water conservancy and hydropower engineering. The composite seepage preventing structure comprises bed rock and the karst...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: QU CHANGHUA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator QU CHANGHUA
description The invention discloses a composite seepage preventing structure for a large karst cave in a karst region and a construction method thereof, and belongs to the technical field of water conservancy and hydropower engineering. The composite seepage preventing structure comprises bed rock and the karst cave. The karst cave is located in the bed rock. The lower section of the karst cave is filled to form a karst filling area. A plurality of filling-material rotary jetting holes or steel pipe piles are vertically distributed in the karst cave filling area and arranged along the seepage preventing axis at intervals in a rowed mode. A transition cushion layer is arranged on the upper surface of the karst cave filling area. A concrete seepage preventing wall is arranged on the steel pipe piles. A cavity in the upstream side of the concrete seepage preventing wall is backfilled to form a backfilling area. According to the technical scheme, due to the reasonable construction method, the concrete seepage preventing wall is built in the karst cave, and the quite good partition effect and the quite good sealing effect are achieved through a karst cave roof joining groove structure in the top and a grouting-cave-aligning-grouting method; the structure and the method are simple, the quantity of input materials is small, construction intensity is small, construction efficiency is greatly improved, and the seepage preventing aim of large karst cave in the karst region is achieved.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105201001A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105201001A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105201001A3</originalsourceid><addsrcrecordid>eNqNi0EOgkAQBLl4MOofxgeYLBofYIjGkyfvZrM0sAFmNrMD71cjD_DU6erqddFXMibJ0UAZSL4FJcUMtsgtZdMp2KSgRpQGr5-595qNgp9BkZemaKMwea4pCP9eXzDCOqnJOiik2Rarxg8ZuyU3xf52fVb3A5K8kJMPYNirepTufHSlc-Xl9I_zBksUQgg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Composite seepage preventing structure for large karst cave in karst region and construction method thereof</title><source>esp@cenet</source><creator>QU CHANGHUA</creator><creatorcontrib>QU CHANGHUA</creatorcontrib><description>The invention discloses a composite seepage preventing structure for a large karst cave in a karst region and a construction method thereof, and belongs to the technical field of water conservancy and hydropower engineering. The composite seepage preventing structure comprises bed rock and the karst cave. The karst cave is located in the bed rock. The lower section of the karst cave is filled to form a karst filling area. A plurality of filling-material rotary jetting holes or steel pipe piles are vertically distributed in the karst cave filling area and arranged along the seepage preventing axis at intervals in a rowed mode. A transition cushion layer is arranged on the upper surface of the karst cave filling area. A concrete seepage preventing wall is arranged on the steel pipe piles. A cavity in the upstream side of the concrete seepage preventing wall is backfilled to form a backfilling area. According to the technical scheme, due to the reasonable construction method, the concrete seepage preventing wall is built in the karst cave, and the quite good partition effect and the quite good sealing effect are achieved through a karst cave roof joining groove structure in the top and a grouting-cave-aligning-grouting method; the structure and the method are simple, the quantity of input materials is small, construction intensity is small, construction efficiency is greatly improved, and the seepage preventing aim of large karst cave in the karst region is achieved.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151230&amp;DB=EPODOC&amp;CC=CN&amp;NR=105201001A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151230&amp;DB=EPODOC&amp;CC=CN&amp;NR=105201001A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>QU CHANGHUA</creatorcontrib><title>Composite seepage preventing structure for large karst cave in karst region and construction method thereof</title><description>The invention discloses a composite seepage preventing structure for a large karst cave in a karst region and a construction method thereof, and belongs to the technical field of water conservancy and hydropower engineering. The composite seepage preventing structure comprises bed rock and the karst cave. The karst cave is located in the bed rock. The lower section of the karst cave is filled to form a karst filling area. A plurality of filling-material rotary jetting holes or steel pipe piles are vertically distributed in the karst cave filling area and arranged along the seepage preventing axis at intervals in a rowed mode. A transition cushion layer is arranged on the upper surface of the karst cave filling area. A concrete seepage preventing wall is arranged on the steel pipe piles. A cavity in the upstream side of the concrete seepage preventing wall is backfilled to form a backfilling area. According to the technical scheme, due to the reasonable construction method, the concrete seepage preventing wall is built in the karst cave, and the quite good partition effect and the quite good sealing effect are achieved through a karst cave roof joining groove structure in the top and a grouting-cave-aligning-grouting method; the structure and the method are simple, the quantity of input materials is small, construction intensity is small, construction efficiency is greatly improved, and the seepage preventing aim of large karst cave in the karst region is achieved.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi0EOgkAQBLl4MOofxgeYLBofYIjGkyfvZrM0sAFmNrMD71cjD_DU6erqddFXMibJ0UAZSL4FJcUMtsgtZdMp2KSgRpQGr5-595qNgp9BkZemaKMwea4pCP9eXzDCOqnJOiik2Rarxg8ZuyU3xf52fVb3A5K8kJMPYNirepTufHSlc-Xl9I_zBksUQgg</recordid><startdate>20151230</startdate><enddate>20151230</enddate><creator>QU CHANGHUA</creator><scope>EVB</scope></search><sort><creationdate>20151230</creationdate><title>Composite seepage preventing structure for large karst cave in karst region and construction method thereof</title><author>QU CHANGHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105201001A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>QU CHANGHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>QU CHANGHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Composite seepage preventing structure for large karst cave in karst region and construction method thereof</title><date>2015-12-30</date><risdate>2015</risdate><abstract>The invention discloses a composite seepage preventing structure for a large karst cave in a karst region and a construction method thereof, and belongs to the technical field of water conservancy and hydropower engineering. The composite seepage preventing structure comprises bed rock and the karst cave. The karst cave is located in the bed rock. The lower section of the karst cave is filled to form a karst filling area. A plurality of filling-material rotary jetting holes or steel pipe piles are vertically distributed in the karst cave filling area and arranged along the seepage preventing axis at intervals in a rowed mode. A transition cushion layer is arranged on the upper surface of the karst cave filling area. A concrete seepage preventing wall is arranged on the steel pipe piles. A cavity in the upstream side of the concrete seepage preventing wall is backfilled to form a backfilling area. According to the technical scheme, due to the reasonable construction method, the concrete seepage preventing wall is built in the karst cave, and the quite good partition effect and the quite good sealing effect are achieved through a karst cave roof joining groove structure in the top and a grouting-cave-aligning-grouting method; the structure and the method are simple, the quantity of input materials is small, construction intensity is small, construction efficiency is greatly improved, and the seepage preventing aim of large karst cave in the karst region is achieved.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105201001A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Composite seepage preventing structure for large karst cave in karst region and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T19%3A24%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=QU%20CHANGHUA&rft.date=2015-12-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105201001A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true