Requirement electricity charge optimization method of data center
The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained a...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | XIE GAOHUI WANG PENG HUANG YAN |
description | The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105184389A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105184389A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105184389A3</originalsourceid><addsrcrecordid>eNrjZHAMSi0szSxKzU3NK1FIzUlNLinKTM4sqVRIzkgsSk9VyC8oyczNrEosyczPU8hNLcnIT1HIT1NISSxJVEgG6kkt4mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFiUBlqSXxzn6GBqaGFibGFpaOxsSoAQBYoTJK</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Requirement electricity charge optimization method of data center</title><source>esp@cenet</source><creator>XIE GAOHUI ; WANG PENG ; HUANG YAN</creator><creatorcontrib>XIE GAOHUI ; WANG PENG ; HUANG YAN</creatorcontrib><description>The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151223&DB=EPODOC&CC=CN&NR=105184389A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151223&DB=EPODOC&CC=CN&NR=105184389A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIE GAOHUI</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>HUANG YAN</creatorcontrib><title>Requirement electricity charge optimization method of data center</title><description>The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAMSi0szSxKzU3NK1FIzUlNLinKTM4sqVRIzkgsSk9VyC8oyczNrEosyczPU8hNLcnIT1HIT1NISSxJVEgG6kkt4mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFiUBlqSXxzn6GBqaGFibGFpaOxsSoAQBYoTJK</recordid><startdate>20151223</startdate><enddate>20151223</enddate><creator>XIE GAOHUI</creator><creator>WANG PENG</creator><creator>HUANG YAN</creator><scope>EVB</scope></search><sort><creationdate>20151223</creationdate><title>Requirement electricity charge optimization method of data center</title><author>XIE GAOHUI ; WANG PENG ; HUANG YAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105184389A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>XIE GAOHUI</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>HUANG YAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIE GAOHUI</au><au>WANG PENG</au><au>HUANG YAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Requirement electricity charge optimization method of data center</title><date>2015-12-23</date><risdate>2015</risdate><abstract>The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_CN105184389A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Requirement electricity charge optimization method of data center |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T17%3A57%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIE%20GAOHUI&rft.date=2015-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105184389A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |