Requirement electricity charge optimization method of data center

The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIE GAOHUI, WANG PENG, HUANG YAN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XIE GAOHUI
WANG PENG
HUANG YAN
description The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105184389A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105184389A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105184389A3</originalsourceid><addsrcrecordid>eNrjZHAMSi0szSxKzU3NK1FIzUlNLinKTM4sqVRIzkgsSk9VyC8oyczNrEosyczPU8hNLcnIT1HIT1NISSxJVEgG6kkt4mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFiUBlqSXxzn6GBqaGFibGFpaOxsSoAQBYoTJK</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Requirement electricity charge optimization method of data center</title><source>esp@cenet</source><creator>XIE GAOHUI ; WANG PENG ; HUANG YAN</creator><creatorcontrib>XIE GAOHUI ; WANG PENG ; HUANG YAN</creatorcontrib><description>The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151223&amp;DB=EPODOC&amp;CC=CN&amp;NR=105184389A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151223&amp;DB=EPODOC&amp;CC=CN&amp;NR=105184389A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIE GAOHUI</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>HUANG YAN</creatorcontrib><title>Requirement electricity charge optimization method of data center</title><description>The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAMSi0szSxKzU3NK1FIzUlNLinKTM4sqVRIzkgsSk9VyC8oyczNrEosyczPU8hNLcnIT1HIT1NISSxJVEgG6kkt4mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFiUBlqSXxzn6GBqaGFibGFpaOxsSoAQBYoTJK</recordid><startdate>20151223</startdate><enddate>20151223</enddate><creator>XIE GAOHUI</creator><creator>WANG PENG</creator><creator>HUANG YAN</creator><scope>EVB</scope></search><sort><creationdate>20151223</creationdate><title>Requirement electricity charge optimization method of data center</title><author>XIE GAOHUI ; WANG PENG ; HUANG YAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105184389A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>XIE GAOHUI</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>HUANG YAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIE GAOHUI</au><au>WANG PENG</au><au>HUANG YAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Requirement electricity charge optimization method of data center</title><date>2015-12-23</date><risdate>2015</risdate><abstract>The invention relates to a requirement electricity charge optimization method of a data center. The method comprises: whether not all values of an external load capacity lambda(t) are 0 is determined; a maximum value lambdamax(t) among the values of the external load capacity lambda(t) is obtained and an operation mode X(t) of the data center is set to be 0; whether the lambdamax(t) meets a formula I is determined; if so, the minimum operation node number mmin(t) is obtained according to load response time D, a node service rate mu, and the operation node number m(t) and then the lambda(t) is set to be 1; otherwise, the operation mode X(t) is set to be 1; the operation mode X(t) and the minimum operation node number mmin(t) are introduced into a formula to obtain a required electricity charge and an electricity consumption charge, wherein an F expresses a node operation power, a PD expresses a requirement prices, and a PE expresses a consumption price in the formula. According to the invention, the requirement cost and the consumption cost are taken into consideration; the charging mode meets an actual situation of the data center; the electricity charge optimization of the data center is divided into two problems of peak power reduction and electricity usage amount; the operation node is in a full load state; the electricity consumption of idle nodes is avoided; and the node utilization rate is improved.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105184389A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Requirement electricity charge optimization method of data center
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T17%3A57%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIE%20GAOHUI&rft.date=2015-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105184389A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true