Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall
The invention relates to a construction method for removing anchor rods, in particular to a construction method for removing anchor rod obstacles in a grooving process of an underground diaphragm wall. By means of the construction method, the technical problems that in the prior art, the anchor rods...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SHEN JIANLIANG YU WENJUN YU WENCAN WANG QIANG |
description | The invention relates to a construction method for removing anchor rods, in particular to a construction method for removing anchor rod obstacles in a grooving process of an underground diaphragm wall. By means of the construction method, the technical problems that in the prior art, the anchor rods are removed directly through a grooving machine by the adoption of conventional steel pipes, groove wall collapse accidents are caused easily, and the safety of surrounding buildings and structures is influenced can be solved. The construction method comprises the steps of conducting construction preparation, placing a drilling machine in place, conducting drilling, spreading a drilling rod, manufacturing grout, conducting grouting operation, moving a machine, conducting secondary grouting, conducting maintenance to designed strength, conducting cutting through grooving machine and conducting acceptance check. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105178333A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105178333A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105178333A3</originalsourceid><addsrcrecordid>eNqNikEKwkAMRbtxIeod4gEEZRDdSlFcuXJf4jSdDkyTIZnq9a3oAVw9_n9vXoVa2IqOvkRhGKj00kInCkqDPCMHQPb9Z0-_PKygT2QQGYLKN8gqnsxAOhi5JZ3ERGgj5l4xDPDClJbVrMNktPpxUa0v53t93VCWhiyjJ6bS1Lfddr87HJ1zJ_dP8wY0bUDG</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall</title><source>esp@cenet</source><creator>SHEN JIANLIANG ; YU WENJUN ; YU WENCAN ; WANG QIANG</creator><creatorcontrib>SHEN JIANLIANG ; YU WENJUN ; YU WENCAN ; WANG QIANG</creatorcontrib><description>The invention relates to a construction method for removing anchor rods, in particular to a construction method for removing anchor rod obstacles in a grooving process of an underground diaphragm wall. By means of the construction method, the technical problems that in the prior art, the anchor rods are removed directly through a grooving machine by the adoption of conventional steel pipes, groove wall collapse accidents are caused easily, and the safety of surrounding buildings and structures is influenced can be solved. The construction method comprises the steps of conducting construction preparation, placing a drilling machine in place, conducting drilling, spreading a drilling rod, manufacturing grout, conducting grouting operation, moving a machine, conducting secondary grouting, conducting maintenance to designed strength, conducting cutting through grooving machine and conducting acceptance check.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151223&DB=EPODOC&CC=CN&NR=105178333A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151223&DB=EPODOC&CC=CN&NR=105178333A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHEN JIANLIANG</creatorcontrib><creatorcontrib>YU WENJUN</creatorcontrib><creatorcontrib>YU WENCAN</creatorcontrib><creatorcontrib>WANG QIANG</creatorcontrib><title>Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall</title><description>The invention relates to a construction method for removing anchor rods, in particular to a construction method for removing anchor rod obstacles in a grooving process of an underground diaphragm wall. By means of the construction method, the technical problems that in the prior art, the anchor rods are removed directly through a grooving machine by the adoption of conventional steel pipes, groove wall collapse accidents are caused easily, and the safety of surrounding buildings and structures is influenced can be solved. The construction method comprises the steps of conducting construction preparation, placing a drilling machine in place, conducting drilling, spreading a drilling rod, manufacturing grout, conducting grouting operation, moving a machine, conducting secondary grouting, conducting maintenance to designed strength, conducting cutting through grooving machine and conducting acceptance check.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNikEKwkAMRbtxIeod4gEEZRDdSlFcuXJf4jSdDkyTIZnq9a3oAVw9_n9vXoVa2IqOvkRhGKj00kInCkqDPCMHQPb9Z0-_PKygT2QQGYLKN8gqnsxAOhi5JZ3ERGgj5l4xDPDClJbVrMNktPpxUa0v53t93VCWhiyjJ6bS1Lfddr87HJ1zJ_dP8wY0bUDG</recordid><startdate>20151223</startdate><enddate>20151223</enddate><creator>SHEN JIANLIANG</creator><creator>YU WENJUN</creator><creator>YU WENCAN</creator><creator>WANG QIANG</creator><scope>EVB</scope></search><sort><creationdate>20151223</creationdate><title>Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall</title><author>SHEN JIANLIANG ; YU WENJUN ; YU WENCAN ; WANG QIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105178333A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SHEN JIANLIANG</creatorcontrib><creatorcontrib>YU WENJUN</creatorcontrib><creatorcontrib>YU WENCAN</creatorcontrib><creatorcontrib>WANG QIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHEN JIANLIANG</au><au>YU WENJUN</au><au>YU WENCAN</au><au>WANG QIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall</title><date>2015-12-23</date><risdate>2015</risdate><abstract>The invention relates to a construction method for removing anchor rods, in particular to a construction method for removing anchor rod obstacles in a grooving process of an underground diaphragm wall. By means of the construction method, the technical problems that in the prior art, the anchor rods are removed directly through a grooving machine by the adoption of conventional steel pipes, groove wall collapse accidents are caused easily, and the safety of surrounding buildings and structures is influenced can be solved. The construction method comprises the steps of conducting construction preparation, placing a drilling machine in place, conducting drilling, spreading a drilling rod, manufacturing grout, conducting grouting operation, moving a machine, conducting secondary grouting, conducting maintenance to designed strength, conducting cutting through grooving machine and conducting acceptance check.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_CN105178333A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T14%3A48%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHEN%20JIANLIANG&rft.date=2015-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105178333A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |