Large filling bag ecological embankment and revetment building method for river lake channel

The invention provides a large filling bag ecological embankment and revetment building method for a river lake channel. The method comprises the steps that (1), on the basis of cleaning and leveling, an embankment structure is filled with cleaned river lake bottom mud layer by layer through the lar...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HE BIN, JIANG YANBIN, LI DENGHUA, QIAN YAJUN, XU BINHUA, MEI JUFU, XU KAI, ZHOU YANZHANG, ZHANG XIAN, ZHANG GUIRONG, ZHU QUNFENG, WANG GUOLI, HE NING, WANG ZHANGCHUN, HUANG ZHOUSHENG, ZHANG ZHONGLIU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HE BIN
JIANG YANBIN
LI DENGHUA
QIAN YAJUN
XU BINHUA
MEI JUFU
XU KAI
ZHOU YANZHANG
ZHANG XIAN
ZHANG GUIRONG
ZHU QUNFENG
WANG GUOLI
HE NING
WANG ZHANGCHUN
HUANG ZHOUSHENG
ZHANG ZHONGLIU
description The invention provides a large filling bag ecological embankment and revetment building method for a river lake channel. The method comprises the steps that (1), on the basis of cleaning and leveling, an embankment structure is filled with cleaned river lake bottom mud layer by layer through the large filling bag technology until the embankment structure reaches up to a designed elevation of the embankment top and the height of 0.5-1 m beyond the designed elevation is reserved through filling construction; (2), the cleaned river lake bottom mud is filled through a land pump, or special complete equipment and corresponding construction technologies are adopted to directly conduct mechanical paving and filling, and then the filled cleaned river lake bottom mud is sewn into bags; and (3), filling soil materials of the large geotextile filling bag embankment structure are taken from local resources, the bottom mud obtained through river lake regulation and channel excavation and cleaning is used as the filling soil materials, the initial water content of the filling soil materials is controlled within the range from 50%-80%, and the large filling bag embankment structure which is layered appropriately is adopted according to the practical situation. According to the method, the design is reasonable, the process is simple, construction is easy, operation is convenient, cost is low, popularization is easy, the ecological functions are good, and the method is applicable to ecological management and ecological channel construction of river lakes in soft soil areas.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105178245A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105178245A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105178245A3</originalsourceid><addsrcrecordid>eNqNi7EKwkAQBdNYiPoP6wcIRg2xlaBYiJWlEDaXl8uRzV64nPl-UfwAq2FgZp48bxwsqHEiTi1VbAnGi7fOsBD6irXroZFYawqYEL9WvZzUn6FHbH1NjQ8U3IRAwh3ItKwKWSazhmXE6sdFsr6cH8V1g8GXGAc2UMSyuKfbLM2Pu0N22v_TvAGdCDu0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Large filling bag ecological embankment and revetment building method for river lake channel</title><source>esp@cenet</source><creator>HE BIN ; JIANG YANBIN ; LI DENGHUA ; QIAN YAJUN ; XU BINHUA ; MEI JUFU ; XU KAI ; ZHOU YANZHANG ; ZHANG XIAN ; ZHANG GUIRONG ; ZHU QUNFENG ; WANG GUOLI ; HE NING ; WANG ZHANGCHUN ; HUANG ZHOUSHENG ; ZHANG ZHONGLIU</creator><creatorcontrib>HE BIN ; JIANG YANBIN ; LI DENGHUA ; QIAN YAJUN ; XU BINHUA ; MEI JUFU ; XU KAI ; ZHOU YANZHANG ; ZHANG XIAN ; ZHANG GUIRONG ; ZHU QUNFENG ; WANG GUOLI ; HE NING ; WANG ZHANGCHUN ; HUANG ZHOUSHENG ; ZHANG ZHONGLIU</creatorcontrib><description>The invention provides a large filling bag ecological embankment and revetment building method for a river lake channel. The method comprises the steps that (1), on the basis of cleaning and leveling, an embankment structure is filled with cleaned river lake bottom mud layer by layer through the large filling bag technology until the embankment structure reaches up to a designed elevation of the embankment top and the height of 0.5-1 m beyond the designed elevation is reserved through filling construction; (2), the cleaned river lake bottom mud is filled through a land pump, or special complete equipment and corresponding construction technologies are adopted to directly conduct mechanical paving and filling, and then the filled cleaned river lake bottom mud is sewn into bags; and (3), filling soil materials of the large geotextile filling bag embankment structure are taken from local resources, the bottom mud obtained through river lake regulation and channel excavation and cleaning is used as the filling soil materials, the initial water content of the filling soil materials is controlled within the range from 50%-80%, and the large filling bag embankment structure which is layered appropriately is adopted according to the practical situation. According to the method, the design is reasonable, the process is simple, construction is easy, operation is convenient, cost is low, popularization is easy, the ecological functions are good, and the method is applicable to ecological management and ecological channel construction of river lakes in soft soil areas.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151223&amp;DB=EPODOC&amp;CC=CN&amp;NR=105178245A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151223&amp;DB=EPODOC&amp;CC=CN&amp;NR=105178245A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HE BIN</creatorcontrib><creatorcontrib>JIANG YANBIN</creatorcontrib><creatorcontrib>LI DENGHUA</creatorcontrib><creatorcontrib>QIAN YAJUN</creatorcontrib><creatorcontrib>XU BINHUA</creatorcontrib><creatorcontrib>MEI JUFU</creatorcontrib><creatorcontrib>XU KAI</creatorcontrib><creatorcontrib>ZHOU YANZHANG</creatorcontrib><creatorcontrib>ZHANG XIAN</creatorcontrib><creatorcontrib>ZHANG GUIRONG</creatorcontrib><creatorcontrib>ZHU QUNFENG</creatorcontrib><creatorcontrib>WANG GUOLI</creatorcontrib><creatorcontrib>HE NING</creatorcontrib><creatorcontrib>WANG ZHANGCHUN</creatorcontrib><creatorcontrib>HUANG ZHOUSHENG</creatorcontrib><creatorcontrib>ZHANG ZHONGLIU</creatorcontrib><title>Large filling bag ecological embankment and revetment building method for river lake channel</title><description>The invention provides a large filling bag ecological embankment and revetment building method for a river lake channel. The method comprises the steps that (1), on the basis of cleaning and leveling, an embankment structure is filled with cleaned river lake bottom mud layer by layer through the large filling bag technology until the embankment structure reaches up to a designed elevation of the embankment top and the height of 0.5-1 m beyond the designed elevation is reserved through filling construction; (2), the cleaned river lake bottom mud is filled through a land pump, or special complete equipment and corresponding construction technologies are adopted to directly conduct mechanical paving and filling, and then the filled cleaned river lake bottom mud is sewn into bags; and (3), filling soil materials of the large geotextile filling bag embankment structure are taken from local resources, the bottom mud obtained through river lake regulation and channel excavation and cleaning is used as the filling soil materials, the initial water content of the filling soil materials is controlled within the range from 50%-80%, and the large filling bag embankment structure which is layered appropriately is adopted according to the practical situation. According to the method, the design is reasonable, the process is simple, construction is easy, operation is convenient, cost is low, popularization is easy, the ecological functions are good, and the method is applicable to ecological management and ecological channel construction of river lakes in soft soil areas.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi7EKwkAQBdNYiPoP6wcIRg2xlaBYiJWlEDaXl8uRzV64nPl-UfwAq2FgZp48bxwsqHEiTi1VbAnGi7fOsBD6irXroZFYawqYEL9WvZzUn6FHbH1NjQ8U3IRAwh3ItKwKWSazhmXE6sdFsr6cH8V1g8GXGAc2UMSyuKfbLM2Pu0N22v_TvAGdCDu0</recordid><startdate>20151223</startdate><enddate>20151223</enddate><creator>HE BIN</creator><creator>JIANG YANBIN</creator><creator>LI DENGHUA</creator><creator>QIAN YAJUN</creator><creator>XU BINHUA</creator><creator>MEI JUFU</creator><creator>XU KAI</creator><creator>ZHOU YANZHANG</creator><creator>ZHANG XIAN</creator><creator>ZHANG GUIRONG</creator><creator>ZHU QUNFENG</creator><creator>WANG GUOLI</creator><creator>HE NING</creator><creator>WANG ZHANGCHUN</creator><creator>HUANG ZHOUSHENG</creator><creator>ZHANG ZHONGLIU</creator><scope>EVB</scope></search><sort><creationdate>20151223</creationdate><title>Large filling bag ecological embankment and revetment building method for river lake channel</title><author>HE BIN ; JIANG YANBIN ; LI DENGHUA ; QIAN YAJUN ; XU BINHUA ; MEI JUFU ; XU KAI ; ZHOU YANZHANG ; ZHANG XIAN ; ZHANG GUIRONG ; ZHU QUNFENG ; WANG GUOLI ; HE NING ; WANG ZHANGCHUN ; HUANG ZHOUSHENG ; ZHANG ZHONGLIU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105178245A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>HE BIN</creatorcontrib><creatorcontrib>JIANG YANBIN</creatorcontrib><creatorcontrib>LI DENGHUA</creatorcontrib><creatorcontrib>QIAN YAJUN</creatorcontrib><creatorcontrib>XU BINHUA</creatorcontrib><creatorcontrib>MEI JUFU</creatorcontrib><creatorcontrib>XU KAI</creatorcontrib><creatorcontrib>ZHOU YANZHANG</creatorcontrib><creatorcontrib>ZHANG XIAN</creatorcontrib><creatorcontrib>ZHANG GUIRONG</creatorcontrib><creatorcontrib>ZHU QUNFENG</creatorcontrib><creatorcontrib>WANG GUOLI</creatorcontrib><creatorcontrib>HE NING</creatorcontrib><creatorcontrib>WANG ZHANGCHUN</creatorcontrib><creatorcontrib>HUANG ZHOUSHENG</creatorcontrib><creatorcontrib>ZHANG ZHONGLIU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HE BIN</au><au>JIANG YANBIN</au><au>LI DENGHUA</au><au>QIAN YAJUN</au><au>XU BINHUA</au><au>MEI JUFU</au><au>XU KAI</au><au>ZHOU YANZHANG</au><au>ZHANG XIAN</au><au>ZHANG GUIRONG</au><au>ZHU QUNFENG</au><au>WANG GUOLI</au><au>HE NING</au><au>WANG ZHANGCHUN</au><au>HUANG ZHOUSHENG</au><au>ZHANG ZHONGLIU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Large filling bag ecological embankment and revetment building method for river lake channel</title><date>2015-12-23</date><risdate>2015</risdate><abstract>The invention provides a large filling bag ecological embankment and revetment building method for a river lake channel. The method comprises the steps that (1), on the basis of cleaning and leveling, an embankment structure is filled with cleaned river lake bottom mud layer by layer through the large filling bag technology until the embankment structure reaches up to a designed elevation of the embankment top and the height of 0.5-1 m beyond the designed elevation is reserved through filling construction; (2), the cleaned river lake bottom mud is filled through a land pump, or special complete equipment and corresponding construction technologies are adopted to directly conduct mechanical paving and filling, and then the filled cleaned river lake bottom mud is sewn into bags; and (3), filling soil materials of the large geotextile filling bag embankment structure are taken from local resources, the bottom mud obtained through river lake regulation and channel excavation and cleaning is used as the filling soil materials, the initial water content of the filling soil materials is controlled within the range from 50%-80%, and the large filling bag embankment structure which is layered appropriately is adopted according to the practical situation. According to the method, the design is reasonable, the process is simple, construction is easy, operation is convenient, cost is low, popularization is easy, the ecological functions are good, and the method is applicable to ecological management and ecological channel construction of river lakes in soft soil areas.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105178245A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Large filling bag ecological embankment and revetment building method for river lake channel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-11T03%3A52%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HE%20BIN&rft.date=2015-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105178245A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true