Construction method for laying suspension bridge catwalk

The invention relates to a construction method for laying a suspension bridge catwalk. After erecting and sag adjusting of catwalk load-bearing cables and catwalk portal load-bearing cables are completed, the process of laying a catwalk surface layer is carried out, a basket is installed at the port...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GU HONGQIN, KUANG JIANGUO, GUAN YOUPING, JIANG HUA, ZHAO JUN, ZHOU QIANGSHENG, YAO YONGFENG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GU HONGQIN
KUANG JIANGUO
GUAN YOUPING
JIANG HUA
ZHAO JUN
ZHOU QIANGSHENG
YAO YONGFENG
description The invention relates to a construction method for laying a suspension bridge catwalk. After erecting and sag adjusting of catwalk load-bearing cables and catwalk portal load-bearing cables are completed, the process of laying a catwalk surface layer is carried out, a basket is installed at the portions, closest to a bridge, of the load-bearing cables through a support, and steel wire gauze slices, anti-skidding planks and other needed facilities are lifted and placed in the basket through a lifting device. The basket serves as a stacking platform and also serves as an operating platform used for installing the steel wire gauze slices and the anti-skidding planks. A winch is installed on a tower, the steel wire gauze slices installed by workers are sequentially lifted in the mode that the winch winds steel wire ropes, and every time the steel wire ropes move by the distance of one steel wire gauze slice, the workers install one new slice and connect the new slice with the former slice, so that laying of the catwalk gauze face from the lower end to the upper end is completed. Similarly, laying of the other side is completed with the method.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105155427A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105155427A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105155427A3</originalsourceid><addsrcrecordid>eNrjZLBwzs8rLikqTS7JzM9TyE0tychPUUjLL1LISazMzEtXKC4tLkjNKwZJJhVlpqSnKiQnlpQn5mTzMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DA1NDU1MTI3NHY2LUAABSiy7d</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for laying suspension bridge catwalk</title><source>esp@cenet</source><creator>GU HONGQIN ; KUANG JIANGUO ; GUAN YOUPING ; JIANG HUA ; ZHAO JUN ; ZHOU QIANGSHENG ; YAO YONGFENG</creator><creatorcontrib>GU HONGQIN ; KUANG JIANGUO ; GUAN YOUPING ; JIANG HUA ; ZHAO JUN ; ZHOU QIANGSHENG ; YAO YONGFENG</creatorcontrib><description>The invention relates to a construction method for laying a suspension bridge catwalk. After erecting and sag adjusting of catwalk load-bearing cables and catwalk portal load-bearing cables are completed, the process of laying a catwalk surface layer is carried out, a basket is installed at the portions, closest to a bridge, of the load-bearing cables through a support, and steel wire gauze slices, anti-skidding planks and other needed facilities are lifted and placed in the basket through a lifting device. The basket serves as a stacking platform and also serves as an operating platform used for installing the steel wire gauze slices and the anti-skidding planks. A winch is installed on a tower, the steel wire gauze slices installed by workers are sequentially lifted in the mode that the winch winds steel wire ropes, and every time the steel wire ropes move by the distance of one steel wire gauze slice, the workers install one new slice and connect the new slice with the former slice, so that laying of the catwalk gauze face from the lower end to the upper end is completed. Similarly, laying of the other side is completed with the method.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151216&amp;DB=EPODOC&amp;CC=CN&amp;NR=105155427A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151216&amp;DB=EPODOC&amp;CC=CN&amp;NR=105155427A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GU HONGQIN</creatorcontrib><creatorcontrib>KUANG JIANGUO</creatorcontrib><creatorcontrib>GUAN YOUPING</creatorcontrib><creatorcontrib>JIANG HUA</creatorcontrib><creatorcontrib>ZHAO JUN</creatorcontrib><creatorcontrib>ZHOU QIANGSHENG</creatorcontrib><creatorcontrib>YAO YONGFENG</creatorcontrib><title>Construction method for laying suspension bridge catwalk</title><description>The invention relates to a construction method for laying a suspension bridge catwalk. After erecting and sag adjusting of catwalk load-bearing cables and catwalk portal load-bearing cables are completed, the process of laying a catwalk surface layer is carried out, a basket is installed at the portions, closest to a bridge, of the load-bearing cables through a support, and steel wire gauze slices, anti-skidding planks and other needed facilities are lifted and placed in the basket through a lifting device. The basket serves as a stacking platform and also serves as an operating platform used for installing the steel wire gauze slices and the anti-skidding planks. A winch is installed on a tower, the steel wire gauze slices installed by workers are sequentially lifted in the mode that the winch winds steel wire ropes, and every time the steel wire ropes move by the distance of one steel wire gauze slice, the workers install one new slice and connect the new slice with the former slice, so that laying of the catwalk gauze face from the lower end to the upper end is completed. Similarly, laying of the other side is completed with the method.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBwzs8rLikqTS7JzM9TyE0tychPUUjLL1LISazMzEtXKC4tLkjNKwZJJhVlpqSnKiQnlpQn5mTzMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz9DA1NDU1MTI3NHY2LUAABSiy7d</recordid><startdate>20151216</startdate><enddate>20151216</enddate><creator>GU HONGQIN</creator><creator>KUANG JIANGUO</creator><creator>GUAN YOUPING</creator><creator>JIANG HUA</creator><creator>ZHAO JUN</creator><creator>ZHOU QIANGSHENG</creator><creator>YAO YONGFENG</creator><scope>EVB</scope></search><sort><creationdate>20151216</creationdate><title>Construction method for laying suspension bridge catwalk</title><author>GU HONGQIN ; KUANG JIANGUO ; GUAN YOUPING ; JIANG HUA ; ZHAO JUN ; ZHOU QIANGSHENG ; YAO YONGFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105155427A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>GU HONGQIN</creatorcontrib><creatorcontrib>KUANG JIANGUO</creatorcontrib><creatorcontrib>GUAN YOUPING</creatorcontrib><creatorcontrib>JIANG HUA</creatorcontrib><creatorcontrib>ZHAO JUN</creatorcontrib><creatorcontrib>ZHOU QIANGSHENG</creatorcontrib><creatorcontrib>YAO YONGFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GU HONGQIN</au><au>KUANG JIANGUO</au><au>GUAN YOUPING</au><au>JIANG HUA</au><au>ZHAO JUN</au><au>ZHOU QIANGSHENG</au><au>YAO YONGFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for laying suspension bridge catwalk</title><date>2015-12-16</date><risdate>2015</risdate><abstract>The invention relates to a construction method for laying a suspension bridge catwalk. After erecting and sag adjusting of catwalk load-bearing cables and catwalk portal load-bearing cables are completed, the process of laying a catwalk surface layer is carried out, a basket is installed at the portions, closest to a bridge, of the load-bearing cables through a support, and steel wire gauze slices, anti-skidding planks and other needed facilities are lifted and placed in the basket through a lifting device. The basket serves as a stacking platform and also serves as an operating platform used for installing the steel wire gauze slices and the anti-skidding planks. A winch is installed on a tower, the steel wire gauze slices installed by workers are sequentially lifted in the mode that the winch winds steel wire ropes, and every time the steel wire ropes move by the distance of one steel wire gauze slice, the workers install one new slice and connect the new slice with the former slice, so that laying of the catwalk gauze face from the lower end to the upper end is completed. Similarly, laying of the other side is completed with the method.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105155427A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Construction method for laying suspension bridge catwalk
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T18%3A27%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GU%20HONGQIN&rft.date=2015-12-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105155427A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true