Concrete crack repairing construction technology suitable for high and cold regions

The invention provides a concrete crack repairing construction technology suitable for high and cold regions. Concrete crack repairing adhesive is heated through a water bath, and then an existing common region concrete crack repairing method is used for repairing the crack on a concrete component;...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIONG ZHIWEN, YANG XIAOMING, KONG DEGANG, LI YONG, YU KAITONG, HAN LONGWU, MENG JINBAO, CAI HANCHENG, JIN LAN, TANG CAIMEI, YANG YONGPENG, ZHOU YOULU, LIU KUN, WANG JINSONG, MA CONG, CHENG JIA, ZHU ZHAORONG, NIU DONGXING, ZHAO XIANGQING
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XIONG ZHIWEN
YANG XIAOMING
KONG DEGANG
LI YONG
YU KAITONG
HAN LONGWU
MENG JINBAO
CAI HANCHENG
JIN LAN
TANG CAIMEI
YANG YONGPENG
ZHOU YOULU
LIU KUN
WANG JINSONG
MA CONG
CHENG JIA
ZHU ZHAORONG
NIU DONGXING
ZHAO XIANGQING
description The invention provides a concrete crack repairing construction technology suitable for high and cold regions. Concrete crack repairing adhesive is heated through a water bath, and then an existing common region concrete crack repairing method is used for repairing the crack on a concrete component; then, thermal-insulation materials are used for wrapping the repaired concrete component in a full-closed mode; next, the thermal-insulation materials are dismantled, and then concrete crack repairing of the high and cold regions is completed. According to the construction technology, the repairing adhesive is heated through the water bath, mixing and stirring of the repairing materials are facilitated, the flowability of the materials is improved, construction is convenient, construction efficiency is improved, the materials are prevented from being rapidly solidified at low temperature, normal solidification is achieved, and the materials can complete solidification and strength improvement well in a highland low-temperature environment. The thermal-insulation measure is adopted, and needed temperature conditions are provided for the repairing materials to guarantee the repairing effect; needed equipment and tools are simple and easy to purchase, the price is low, and implementation is easy.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105133853A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105133853A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105133853A3</originalsourceid><addsrcrecordid>eNqNyzEKAjEQQNE0FqLeYTyA4BIWbCUoVjbaL3F2NhsMM2GSLby9KTyA1W_eX5uHE0alSoDq8Q1K2UeNHACFS9UFaxSGSjizJAkfKEus_pUIJlGYY5jB89h0GtscGi5bs5p8KrT7dWP218vT3Q6UZaCSPRJTHdy9O_adtafenu0_5gugRTjf</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Concrete crack repairing construction technology suitable for high and cold regions</title><source>esp@cenet</source><creator>XIONG ZHIWEN ; YANG XIAOMING ; KONG DEGANG ; LI YONG ; YU KAITONG ; HAN LONGWU ; MENG JINBAO ; CAI HANCHENG ; JIN LAN ; TANG CAIMEI ; YANG YONGPENG ; ZHOU YOULU ; LIU KUN ; WANG JINSONG ; MA CONG ; CHENG JIA ; ZHU ZHAORONG ; NIU DONGXING ; ZHAO XIANGQING</creator><creatorcontrib>XIONG ZHIWEN ; YANG XIAOMING ; KONG DEGANG ; LI YONG ; YU KAITONG ; HAN LONGWU ; MENG JINBAO ; CAI HANCHENG ; JIN LAN ; TANG CAIMEI ; YANG YONGPENG ; ZHOU YOULU ; LIU KUN ; WANG JINSONG ; MA CONG ; CHENG JIA ; ZHU ZHAORONG ; NIU DONGXING ; ZHAO XIANGQING</creatorcontrib><description>The invention provides a concrete crack repairing construction technology suitable for high and cold regions. Concrete crack repairing adhesive is heated through a water bath, and then an existing common region concrete crack repairing method is used for repairing the crack on a concrete component; then, thermal-insulation materials are used for wrapping the repaired concrete component in a full-closed mode; next, the thermal-insulation materials are dismantled, and then concrete crack repairing of the high and cold regions is completed. According to the construction technology, the repairing adhesive is heated through the water bath, mixing and stirring of the repairing materials are facilitated, the flowability of the materials is improved, construction is convenient, construction efficiency is improved, the materials are prevented from being rapidly solidified at low temperature, normal solidification is achieved, and the materials can complete solidification and strength improvement well in a highland low-temperature environment. The thermal-insulation measure is adopted, and needed temperature conditions are provided for the repairing materials to guarantee the repairing effect; needed equipment and tools are simple and easy to purchase, the price is low, and implementation is easy.</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151209&amp;DB=EPODOC&amp;CC=CN&amp;NR=105133853A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151209&amp;DB=EPODOC&amp;CC=CN&amp;NR=105133853A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIONG ZHIWEN</creatorcontrib><creatorcontrib>YANG XIAOMING</creatorcontrib><creatorcontrib>KONG DEGANG</creatorcontrib><creatorcontrib>LI YONG</creatorcontrib><creatorcontrib>YU KAITONG</creatorcontrib><creatorcontrib>HAN LONGWU</creatorcontrib><creatorcontrib>MENG JINBAO</creatorcontrib><creatorcontrib>CAI HANCHENG</creatorcontrib><creatorcontrib>JIN LAN</creatorcontrib><creatorcontrib>TANG CAIMEI</creatorcontrib><creatorcontrib>YANG YONGPENG</creatorcontrib><creatorcontrib>ZHOU YOULU</creatorcontrib><creatorcontrib>LIU KUN</creatorcontrib><creatorcontrib>WANG JINSONG</creatorcontrib><creatorcontrib>MA CONG</creatorcontrib><creatorcontrib>CHENG JIA</creatorcontrib><creatorcontrib>ZHU ZHAORONG</creatorcontrib><creatorcontrib>NIU DONGXING</creatorcontrib><creatorcontrib>ZHAO XIANGQING</creatorcontrib><title>Concrete crack repairing construction technology suitable for high and cold regions</title><description>The invention provides a concrete crack repairing construction technology suitable for high and cold regions. Concrete crack repairing adhesive is heated through a water bath, and then an existing common region concrete crack repairing method is used for repairing the crack on a concrete component; then, thermal-insulation materials are used for wrapping the repaired concrete component in a full-closed mode; next, the thermal-insulation materials are dismantled, and then concrete crack repairing of the high and cold regions is completed. According to the construction technology, the repairing adhesive is heated through the water bath, mixing and stirring of the repairing materials are facilitated, the flowability of the materials is improved, construction is convenient, construction efficiency is improved, the materials are prevented from being rapidly solidified at low temperature, normal solidification is achieved, and the materials can complete solidification and strength improvement well in a highland low-temperature environment. The thermal-insulation measure is adopted, and needed temperature conditions are provided for the repairing materials to guarantee the repairing effect; needed equipment and tools are simple and easy to purchase, the price is low, and implementation is easy.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzEKAjEQQNE0FqLeYTyA4BIWbCUoVjbaL3F2NhsMM2GSLby9KTyA1W_eX5uHE0alSoDq8Q1K2UeNHACFS9UFaxSGSjizJAkfKEus_pUIJlGYY5jB89h0GtscGi5bs5p8KrT7dWP218vT3Q6UZaCSPRJTHdy9O_adtafenu0_5gugRTjf</recordid><startdate>20151209</startdate><enddate>20151209</enddate><creator>XIONG ZHIWEN</creator><creator>YANG XIAOMING</creator><creator>KONG DEGANG</creator><creator>LI YONG</creator><creator>YU KAITONG</creator><creator>HAN LONGWU</creator><creator>MENG JINBAO</creator><creator>CAI HANCHENG</creator><creator>JIN LAN</creator><creator>TANG CAIMEI</creator><creator>YANG YONGPENG</creator><creator>ZHOU YOULU</creator><creator>LIU KUN</creator><creator>WANG JINSONG</creator><creator>MA CONG</creator><creator>CHENG JIA</creator><creator>ZHU ZHAORONG</creator><creator>NIU DONGXING</creator><creator>ZHAO XIANGQING</creator><scope>EVB</scope></search><sort><creationdate>20151209</creationdate><title>Concrete crack repairing construction technology suitable for high and cold regions</title><author>XIONG ZHIWEN ; YANG XIAOMING ; KONG DEGANG ; LI YONG ; YU KAITONG ; HAN LONGWU ; MENG JINBAO ; CAI HANCHENG ; JIN LAN ; TANG CAIMEI ; YANG YONGPENG ; ZHOU YOULU ; LIU KUN ; WANG JINSONG ; MA CONG ; CHENG JIA ; ZHU ZHAORONG ; NIU DONGXING ; ZHAO XIANGQING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105133853A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>XIONG ZHIWEN</creatorcontrib><creatorcontrib>YANG XIAOMING</creatorcontrib><creatorcontrib>KONG DEGANG</creatorcontrib><creatorcontrib>LI YONG</creatorcontrib><creatorcontrib>YU KAITONG</creatorcontrib><creatorcontrib>HAN LONGWU</creatorcontrib><creatorcontrib>MENG JINBAO</creatorcontrib><creatorcontrib>CAI HANCHENG</creatorcontrib><creatorcontrib>JIN LAN</creatorcontrib><creatorcontrib>TANG CAIMEI</creatorcontrib><creatorcontrib>YANG YONGPENG</creatorcontrib><creatorcontrib>ZHOU YOULU</creatorcontrib><creatorcontrib>LIU KUN</creatorcontrib><creatorcontrib>WANG JINSONG</creatorcontrib><creatorcontrib>MA CONG</creatorcontrib><creatorcontrib>CHENG JIA</creatorcontrib><creatorcontrib>ZHU ZHAORONG</creatorcontrib><creatorcontrib>NIU DONGXING</creatorcontrib><creatorcontrib>ZHAO XIANGQING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIONG ZHIWEN</au><au>YANG XIAOMING</au><au>KONG DEGANG</au><au>LI YONG</au><au>YU KAITONG</au><au>HAN LONGWU</au><au>MENG JINBAO</au><au>CAI HANCHENG</au><au>JIN LAN</au><au>TANG CAIMEI</au><au>YANG YONGPENG</au><au>ZHOU YOULU</au><au>LIU KUN</au><au>WANG JINSONG</au><au>MA CONG</au><au>CHENG JIA</au><au>ZHU ZHAORONG</au><au>NIU DONGXING</au><au>ZHAO XIANGQING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Concrete crack repairing construction technology suitable for high and cold regions</title><date>2015-12-09</date><risdate>2015</risdate><abstract>The invention provides a concrete crack repairing construction technology suitable for high and cold regions. Concrete crack repairing adhesive is heated through a water bath, and then an existing common region concrete crack repairing method is used for repairing the crack on a concrete component; then, thermal-insulation materials are used for wrapping the repaired concrete component in a full-closed mode; next, the thermal-insulation materials are dismantled, and then concrete crack repairing of the high and cold regions is completed. According to the construction technology, the repairing adhesive is heated through the water bath, mixing and stirring of the repairing materials are facilitated, the flowability of the materials is improved, construction is convenient, construction efficiency is improved, the materials are prevented from being rapidly solidified at low temperature, normal solidification is achieved, and the materials can complete solidification and strength improvement well in a highland low-temperature environment. The thermal-insulation measure is adopted, and needed temperature conditions are provided for the repairing materials to guarantee the repairing effect; needed equipment and tools are simple and easy to purchase, the price is low, and implementation is easy.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105133853A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
title Concrete crack repairing construction technology suitable for high and cold regions
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T00%3A08%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIONG%20ZHIWEN&rft.date=2015-12-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105133853A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true