Concrete pedestal parting structure and construction method

The invention discloses a hydraulic and hydroelectric engineering structure, and particularly relates to a concrete pedestal parting structure. The concrete pedestal parting structure which can reduce temperature stress comprises a concrete pedestal and an arch dam foundation rock body, wherein one...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XUE LIJUN, ZHU HAIXIA, RAO HONGLING, ZHOU ZHONG, TANG ZHONGMIN, PAN XIAOHONG, ZHANG JING
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XUE LIJUN
ZHU HAIXIA
RAO HONGLING
ZHOU ZHONG
TANG ZHONGMIN
PAN XIAOHONG
ZHANG JING
description The invention discloses a hydraulic and hydroelectric engineering structure, and particularly relates to a concrete pedestal parting structure. The concrete pedestal parting structure which can reduce temperature stress comprises a concrete pedestal and an arch dam foundation rock body, wherein one end of the concrete pedestal is arranged on the arch dam foundation rock body, and the other end of the concrete pedestal is an arch dam foundation surface. The concrete pedestal parting structure further comprises a concrete pedestal parting structure body which divides the concrete pedestal into two parts, and the seam surface of the concrete pedestal parting structure body is an inclined curved surface. After the concrete pedestal with a large size is parted through the concrete pedestal parting structure, the temperature stress of the concrete pedestal can be reduced, the cracking risk of concrete of the pedestal is lowered, and the problem of poor construction capacity of a construction machine when the concrete pouring bin surface of the pedestal is large is solved. After the parting seam of the pedestal is subjected to joint grouting, the concrete pedestal finally forms an integrated structure, and the overall stress of the pedestal is facilitated.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105133636A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105133636A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105133636A3</originalsourceid><addsrcrecordid>eNrjZLB2zs9LLkotSVUoSE1JLS5JzFEoSCwqycxLVyguKSpNLiktSlVIzEtRSM7Pgwhk5ucp5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_QwNTQ2NjM2MzR2Ni1AAAA7EwJA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Concrete pedestal parting structure and construction method</title><source>esp@cenet</source><creator>XUE LIJUN ; ZHU HAIXIA ; RAO HONGLING ; ZHOU ZHONG ; TANG ZHONGMIN ; PAN XIAOHONG ; ZHANG JING</creator><creatorcontrib>XUE LIJUN ; ZHU HAIXIA ; RAO HONGLING ; ZHOU ZHONG ; TANG ZHONGMIN ; PAN XIAOHONG ; ZHANG JING</creatorcontrib><description>The invention discloses a hydraulic and hydroelectric engineering structure, and particularly relates to a concrete pedestal parting structure. The concrete pedestal parting structure which can reduce temperature stress comprises a concrete pedestal and an arch dam foundation rock body, wherein one end of the concrete pedestal is arranged on the arch dam foundation rock body, and the other end of the concrete pedestal is an arch dam foundation surface. The concrete pedestal parting structure further comprises a concrete pedestal parting structure body which divides the concrete pedestal into two parts, and the seam surface of the concrete pedestal parting structure body is an inclined curved surface. After the concrete pedestal with a large size is parted through the concrete pedestal parting structure, the temperature stress of the concrete pedestal can be reduced, the cracking risk of concrete of the pedestal is lowered, and the problem of poor construction capacity of a construction machine when the concrete pouring bin surface of the pedestal is large is solved. After the parting seam of the pedestal is subjected to joint grouting, the concrete pedestal finally forms an integrated structure, and the overall stress of the pedestal is facilitated.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151209&amp;DB=EPODOC&amp;CC=CN&amp;NR=105133636A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151209&amp;DB=EPODOC&amp;CC=CN&amp;NR=105133636A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XUE LIJUN</creatorcontrib><creatorcontrib>ZHU HAIXIA</creatorcontrib><creatorcontrib>RAO HONGLING</creatorcontrib><creatorcontrib>ZHOU ZHONG</creatorcontrib><creatorcontrib>TANG ZHONGMIN</creatorcontrib><creatorcontrib>PAN XIAOHONG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><title>Concrete pedestal parting structure and construction method</title><description>The invention discloses a hydraulic and hydroelectric engineering structure, and particularly relates to a concrete pedestal parting structure. The concrete pedestal parting structure which can reduce temperature stress comprises a concrete pedestal and an arch dam foundation rock body, wherein one end of the concrete pedestal is arranged on the arch dam foundation rock body, and the other end of the concrete pedestal is an arch dam foundation surface. The concrete pedestal parting structure further comprises a concrete pedestal parting structure body which divides the concrete pedestal into two parts, and the seam surface of the concrete pedestal parting structure body is an inclined curved surface. After the concrete pedestal with a large size is parted through the concrete pedestal parting structure, the temperature stress of the concrete pedestal can be reduced, the cracking risk of concrete of the pedestal is lowered, and the problem of poor construction capacity of a construction machine when the concrete pouring bin surface of the pedestal is large is solved. After the parting seam of the pedestal is subjected to joint grouting, the concrete pedestal finally forms an integrated structure, and the overall stress of the pedestal is facilitated.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB2zs9LLkotSVUoSE1JLS5JzFEoSCwqycxLVyguKSpNLiktSlVIzEtRSM7Pgwhk5ucp5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_QwNTQ2NjM2MzR2Ni1AAAA7EwJA</recordid><startdate>20151209</startdate><enddate>20151209</enddate><creator>XUE LIJUN</creator><creator>ZHU HAIXIA</creator><creator>RAO HONGLING</creator><creator>ZHOU ZHONG</creator><creator>TANG ZHONGMIN</creator><creator>PAN XIAOHONG</creator><creator>ZHANG JING</creator><scope>EVB</scope></search><sort><creationdate>20151209</creationdate><title>Concrete pedestal parting structure and construction method</title><author>XUE LIJUN ; ZHU HAIXIA ; RAO HONGLING ; ZHOU ZHONG ; TANG ZHONGMIN ; PAN XIAOHONG ; ZHANG JING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105133636A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>XUE LIJUN</creatorcontrib><creatorcontrib>ZHU HAIXIA</creatorcontrib><creatorcontrib>RAO HONGLING</creatorcontrib><creatorcontrib>ZHOU ZHONG</creatorcontrib><creatorcontrib>TANG ZHONGMIN</creatorcontrib><creatorcontrib>PAN XIAOHONG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XUE LIJUN</au><au>ZHU HAIXIA</au><au>RAO HONGLING</au><au>ZHOU ZHONG</au><au>TANG ZHONGMIN</au><au>PAN XIAOHONG</au><au>ZHANG JING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Concrete pedestal parting structure and construction method</title><date>2015-12-09</date><risdate>2015</risdate><abstract>The invention discloses a hydraulic and hydroelectric engineering structure, and particularly relates to a concrete pedestal parting structure. The concrete pedestal parting structure which can reduce temperature stress comprises a concrete pedestal and an arch dam foundation rock body, wherein one end of the concrete pedestal is arranged on the arch dam foundation rock body, and the other end of the concrete pedestal is an arch dam foundation surface. The concrete pedestal parting structure further comprises a concrete pedestal parting structure body which divides the concrete pedestal into two parts, and the seam surface of the concrete pedestal parting structure body is an inclined curved surface. After the concrete pedestal with a large size is parted through the concrete pedestal parting structure, the temperature stress of the concrete pedestal can be reduced, the cracking risk of concrete of the pedestal is lowered, and the problem of poor construction capacity of a construction machine when the concrete pouring bin surface of the pedestal is large is solved. After the parting seam of the pedestal is subjected to joint grouting, the concrete pedestal finally forms an integrated structure, and the overall stress of the pedestal is facilitated.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105133636A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Concrete pedestal parting structure and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-22T11%3A56%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XUE%20LIJUN&rft.date=2015-12-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105133636A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true