Automatic test-based power distribution network model checking method

The invention discloses an automatic test-based power distribution network model checking method. The automatic test-based power distribution network model checking method comprises the following steps: (1) selecting a region for carrying out power distribution network model checking; (2) setting a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU WENXIA, NONG JING, LU SIBIN, KANG TAIFENG, DENG PIAO, WANG FENGYUAN, LI QINGSHENG, ZHONG LIANHONG, LI LIJUAN, TANG XUEYONG, ZHAO FENGQING, ZHANG YU, ZHANG RUIPENG, LUO NING
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU WENXIA
NONG JING
LU SIBIN
KANG TAIFENG
DENG PIAO
WANG FENGYUAN
LI QINGSHENG
ZHONG LIANHONG
LI LIJUAN
TANG XUEYONG
ZHAO FENGQING
ZHANG YU
ZHANG RUIPENG
LUO NING
description The invention discloses an automatic test-based power distribution network model checking method. The automatic test-based power distribution network model checking method comprises the following steps: (1) selecting a region for carrying out power distribution network model checking; (2) setting a test case according to a wiring diagram and an operation mode of a check region, wherein the test cast comprises setting of a fault and setting of a fault handling scheme; (3) setting fault information according to the test case; (4) transferring an automated function module of a feeder line to generate an actual fault handling scheme; (5) verifying whether the set fault handling scheme is consistent with the actual fault handling scheme or not; and (6) outputting an automatic test result. According to the automatic test-based power distribution network model checking method, the technical problems that a potential safety hazard exists in model and graph management due to shortage of verifying means suitable for graph and model correctness of the power distribution network in the graph and model management process of the power distribution network in the prior art and serious dependence on dispatching personnel; and the workload for verifying the graph and model correctness is increased, the work efficiency is reduced and the potential safety hazard is formed due to shortage of automated testing means are solved.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN105098778A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN105098778A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN105098778A3</originalsourceid><addsrcrecordid>eNrjZHB1LC3Jz00syUxWKEktLtFNSixOTVEoyC9PLVJIySwuKcpMKi3JzM9TyEstKc8vylbIzU9JzVFIzkhNzs7MS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyalA_fHOfoYGpgaWFubmFo7GxKgBAD2zM94</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Automatic test-based power distribution network model checking method</title><source>esp@cenet</source><creator>LIU WENXIA ; NONG JING ; LU SIBIN ; KANG TAIFENG ; DENG PIAO ; WANG FENGYUAN ; LI QINGSHENG ; ZHONG LIANHONG ; LI LIJUAN ; TANG XUEYONG ; ZHAO FENGQING ; ZHANG YU ; ZHANG RUIPENG ; LUO NING</creator><creatorcontrib>LIU WENXIA ; NONG JING ; LU SIBIN ; KANG TAIFENG ; DENG PIAO ; WANG FENGYUAN ; LI QINGSHENG ; ZHONG LIANHONG ; LI LIJUAN ; TANG XUEYONG ; ZHAO FENGQING ; ZHANG YU ; ZHANG RUIPENG ; LUO NING</creatorcontrib><description>The invention discloses an automatic test-based power distribution network model checking method. The automatic test-based power distribution network model checking method comprises the following steps: (1) selecting a region for carrying out power distribution network model checking; (2) setting a test case according to a wiring diagram and an operation mode of a check region, wherein the test cast comprises setting of a fault and setting of a fault handling scheme; (3) setting fault information according to the test case; (4) transferring an automated function module of a feeder line to generate an actual fault handling scheme; (5) verifying whether the set fault handling scheme is consistent with the actual fault handling scheme or not; and (6) outputting an automatic test result. According to the automatic test-based power distribution network model checking method, the technical problems that a potential safety hazard exists in model and graph management due to shortage of verifying means suitable for graph and model correctness of the power distribution network in the graph and model management process of the power distribution network in the prior art and serious dependence on dispatching personnel; and the workload for verifying the graph and model correctness is increased, the work efficiency is reduced and the potential safety hazard is formed due to shortage of automated testing means are solved.</description><language>eng</language><subject>CALCULATING ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; COMPUTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRICITY ; GENERATION ; MEASURING ; MEASURING ELECTRIC VARIABLES ; MEASURING MAGNETIC VARIABLES ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR ; TESTING</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151125&amp;DB=EPODOC&amp;CC=CN&amp;NR=105098778A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20151125&amp;DB=EPODOC&amp;CC=CN&amp;NR=105098778A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU WENXIA</creatorcontrib><creatorcontrib>NONG JING</creatorcontrib><creatorcontrib>LU SIBIN</creatorcontrib><creatorcontrib>KANG TAIFENG</creatorcontrib><creatorcontrib>DENG PIAO</creatorcontrib><creatorcontrib>WANG FENGYUAN</creatorcontrib><creatorcontrib>LI QINGSHENG</creatorcontrib><creatorcontrib>ZHONG LIANHONG</creatorcontrib><creatorcontrib>LI LIJUAN</creatorcontrib><creatorcontrib>TANG XUEYONG</creatorcontrib><creatorcontrib>ZHAO FENGQING</creatorcontrib><creatorcontrib>ZHANG YU</creatorcontrib><creatorcontrib>ZHANG RUIPENG</creatorcontrib><creatorcontrib>LUO NING</creatorcontrib><title>Automatic test-based power distribution network model checking method</title><description>The invention discloses an automatic test-based power distribution network model checking method. The automatic test-based power distribution network model checking method comprises the following steps: (1) selecting a region for carrying out power distribution network model checking; (2) setting a test case according to a wiring diagram and an operation mode of a check region, wherein the test cast comprises setting of a fault and setting of a fault handling scheme; (3) setting fault information according to the test case; (4) transferring an automated function module of a feeder line to generate an actual fault handling scheme; (5) verifying whether the set fault handling scheme is consistent with the actual fault handling scheme or not; and (6) outputting an automatic test result. According to the automatic test-based power distribution network model checking method, the technical problems that a potential safety hazard exists in model and graph management due to shortage of verifying means suitable for graph and model correctness of the power distribution network in the graph and model management process of the power distribution network in the prior art and serious dependence on dispatching personnel; and the workload for verifying the graph and model correctness is increased, the work efficiency is reduced and the potential safety hazard is formed due to shortage of automated testing means are solved.</description><subject>CALCULATING</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>COMPUTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>MEASURING</subject><subject>MEASURING ELECTRIC VARIABLES</subject><subject>MEASURING MAGNETIC VARIABLES</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB1LC3Jz00syUxWKEktLtFNSixOTVEoyC9PLVJIySwuKcpMKi3JzM9TyEstKc8vylbIzU9JzVFIzkhNzs7MS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyalA_fHOfoYGpgaWFubmFo7GxKgBAD2zM94</recordid><startdate>20151125</startdate><enddate>20151125</enddate><creator>LIU WENXIA</creator><creator>NONG JING</creator><creator>LU SIBIN</creator><creator>KANG TAIFENG</creator><creator>DENG PIAO</creator><creator>WANG FENGYUAN</creator><creator>LI QINGSHENG</creator><creator>ZHONG LIANHONG</creator><creator>LI LIJUAN</creator><creator>TANG XUEYONG</creator><creator>ZHAO FENGQING</creator><creator>ZHANG YU</creator><creator>ZHANG RUIPENG</creator><creator>LUO NING</creator><scope>EVB</scope></search><sort><creationdate>20151125</creationdate><title>Automatic test-based power distribution network model checking method</title><author>LIU WENXIA ; NONG JING ; LU SIBIN ; KANG TAIFENG ; DENG PIAO ; WANG FENGYUAN ; LI QINGSHENG ; ZHONG LIANHONG ; LI LIJUAN ; TANG XUEYONG ; ZHAO FENGQING ; ZHANG YU ; ZHANG RUIPENG ; LUO NING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN105098778A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>CALCULATING</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>COMPUTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>MEASURING</topic><topic>MEASURING ELECTRIC VARIABLES</topic><topic>MEASURING MAGNETIC VARIABLES</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU WENXIA</creatorcontrib><creatorcontrib>NONG JING</creatorcontrib><creatorcontrib>LU SIBIN</creatorcontrib><creatorcontrib>KANG TAIFENG</creatorcontrib><creatorcontrib>DENG PIAO</creatorcontrib><creatorcontrib>WANG FENGYUAN</creatorcontrib><creatorcontrib>LI QINGSHENG</creatorcontrib><creatorcontrib>ZHONG LIANHONG</creatorcontrib><creatorcontrib>LI LIJUAN</creatorcontrib><creatorcontrib>TANG XUEYONG</creatorcontrib><creatorcontrib>ZHAO FENGQING</creatorcontrib><creatorcontrib>ZHANG YU</creatorcontrib><creatorcontrib>ZHANG RUIPENG</creatorcontrib><creatorcontrib>LUO NING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU WENXIA</au><au>NONG JING</au><au>LU SIBIN</au><au>KANG TAIFENG</au><au>DENG PIAO</au><au>WANG FENGYUAN</au><au>LI QINGSHENG</au><au>ZHONG LIANHONG</au><au>LI LIJUAN</au><au>TANG XUEYONG</au><au>ZHAO FENGQING</au><au>ZHANG YU</au><au>ZHANG RUIPENG</au><au>LUO NING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Automatic test-based power distribution network model checking method</title><date>2015-11-25</date><risdate>2015</risdate><abstract>The invention discloses an automatic test-based power distribution network model checking method. The automatic test-based power distribution network model checking method comprises the following steps: (1) selecting a region for carrying out power distribution network model checking; (2) setting a test case according to a wiring diagram and an operation mode of a check region, wherein the test cast comprises setting of a fault and setting of a fault handling scheme; (3) setting fault information according to the test case; (4) transferring an automated function module of a feeder line to generate an actual fault handling scheme; (5) verifying whether the set fault handling scheme is consistent with the actual fault handling scheme or not; and (6) outputting an automatic test result. According to the automatic test-based power distribution network model checking method, the technical problems that a potential safety hazard exists in model and graph management due to shortage of verifying means suitable for graph and model correctness of the power distribution network in the graph and model management process of the power distribution network in the prior art and serious dependence on dispatching personnel; and the workload for verifying the graph and model correctness is increased, the work efficiency is reduced and the potential safety hazard is formed due to shortage of automated testing means are solved.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN105098778A
source esp@cenet
subjects CALCULATING
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
COMPUTING
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
ELECTRICITY
GENERATION
MEASURING
MEASURING ELECTRIC VARIABLES
MEASURING MAGNETIC VARIABLES
PHYSICS
SYSTEMS FOR STORING ELECTRIC ENERGY
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
TESTING
title Automatic test-based power distribution network model checking method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T15%3A08%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20WENXIA&rft.date=2015-11-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN105098778A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true