Construction method of riding well on existing shield drainage pipeline
The invention provides a construction method of a riding well on an existing shield drainage pipeline. The construction method comprises that step 1: a foundation pit retaining structure is constructed on a foundation pit to be excavated, and the bottom of the foundation pit is paved with a shield p...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!