Formation and construction set for continuous open-cut tunnel

The invention discloses a formation and construction set for a continuous open-cut tunnel. The formation and construction set comprises a frame; the frame comprises two gantries; the gantries are connected together through a vertical beam; the vertical beam is connected with a formwork through a mec...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WAN PENG, SUN SHIHAO, GENG DONGMEI, JI BOLIN, WANG LING, WANG DEQIAN, YAO KUNFENG, ZHANG CHUANCHENG, ZHANG YUANFANG, WANG HAO, ZHOU YANLING, LI GANG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WAN PENG
SUN SHIHAO
GENG DONGMEI
JI BOLIN
WANG LING
WANG DEQIAN
YAO KUNFENG
ZHANG CHUANCHENG
ZHANG YUANFANG
WANG HAO
ZHOU YANLING
LI GANG
description The invention discloses a formation and construction set for a continuous open-cut tunnel. The formation and construction set comprises a frame; the frame comprises two gantries; the gantries are connected together through a vertical beam; the vertical beam is connected with a formwork through a mechanical support; telescopic posts and travelling mechanisms are provided below the gantries. The formwork comprises a plurality of groups of tunnel arc forms vertically spliced; the tunnel arc forms in each group are in integrated large form structures, the tops of which fit the sectional shape of the tunnel; an arc slurry-lifting and leveling unit is arranged at the top of the tunnel arc forms. The formation and construction set is suitable for lining construction by a wall-first and arch-second method; the designed lining is suitable for use in highways, diversion tunnels, railway tunnels and the like, with less than 600mm of thickness. The formation and construction set is simple in structure and attractive in style, allows convenience for construction, and is of good integrity, high automation level, high form removal speed and high in-position speed.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN104929660A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN104929660A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN104929660A3</originalsourceid><addsrcrecordid>eNrjZLB1yy_KTSzJzM9TSMxLUUjOzysuKSpNBgsUp5YopOUXgQRLMvNK80uLFfILUvN0k0tLFEpK8_JSc3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GBiaWRpZmZgaMxMWoAY7Uwxg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Formation and construction set for continuous open-cut tunnel</title><source>esp@cenet</source><creator>WAN PENG ; SUN SHIHAO ; GENG DONGMEI ; JI BOLIN ; WANG LING ; WANG DEQIAN ; YAO KUNFENG ; ZHANG CHUANCHENG ; ZHANG YUANFANG ; WANG HAO ; ZHOU YANLING ; LI GANG</creator><creatorcontrib>WAN PENG ; SUN SHIHAO ; GENG DONGMEI ; JI BOLIN ; WANG LING ; WANG DEQIAN ; YAO KUNFENG ; ZHANG CHUANCHENG ; ZHANG YUANFANG ; WANG HAO ; ZHOU YANLING ; LI GANG</creatorcontrib><description>The invention discloses a formation and construction set for a continuous open-cut tunnel. The formation and construction set comprises a frame; the frame comprises two gantries; the gantries are connected together through a vertical beam; the vertical beam is connected with a formwork through a mechanical support; telescopic posts and travelling mechanisms are provided below the gantries. The formwork comprises a plurality of groups of tunnel arc forms vertically spliced; the tunnel arc forms in each group are in integrated large form structures, the tops of which fit the sectional shape of the tunnel; an arc slurry-lifting and leveling unit is arranged at the top of the tunnel arc forms. The formation and construction set is suitable for lining construction by a wall-first and arch-second method; the designed lining is suitable for use in highways, diversion tunnels, railway tunnels and the like, with less than 600mm of thickness. The formation and construction set is simple in structure and attractive in style, allows convenience for construction, and is of good integrity, high automation level, high form removal speed and high in-position speed.</description><language>eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150923&amp;DB=EPODOC&amp;CC=CN&amp;NR=104929660A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150923&amp;DB=EPODOC&amp;CC=CN&amp;NR=104929660A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WAN PENG</creatorcontrib><creatorcontrib>SUN SHIHAO</creatorcontrib><creatorcontrib>GENG DONGMEI</creatorcontrib><creatorcontrib>JI BOLIN</creatorcontrib><creatorcontrib>WANG LING</creatorcontrib><creatorcontrib>WANG DEQIAN</creatorcontrib><creatorcontrib>YAO KUNFENG</creatorcontrib><creatorcontrib>ZHANG CHUANCHENG</creatorcontrib><creatorcontrib>ZHANG YUANFANG</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>ZHOU YANLING</creatorcontrib><creatorcontrib>LI GANG</creatorcontrib><title>Formation and construction set for continuous open-cut tunnel</title><description>The invention discloses a formation and construction set for a continuous open-cut tunnel. The formation and construction set comprises a frame; the frame comprises two gantries; the gantries are connected together through a vertical beam; the vertical beam is connected with a formwork through a mechanical support; telescopic posts and travelling mechanisms are provided below the gantries. The formwork comprises a plurality of groups of tunnel arc forms vertically spliced; the tunnel arc forms in each group are in integrated large form structures, the tops of which fit the sectional shape of the tunnel; an arc slurry-lifting and leveling unit is arranged at the top of the tunnel arc forms. The formation and construction set is suitable for lining construction by a wall-first and arch-second method; the designed lining is suitable for use in highways, diversion tunnels, railway tunnels and the like, with less than 600mm of thickness. The formation and construction set is simple in structure and attractive in style, allows convenience for construction, and is of good integrity, high automation level, high form removal speed and high in-position speed.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB1yy_KTSzJzM9TSMxLUUjOzysuKSpNBgsUp5YopOUXgQRLMvNK80uLFfILUvN0k0tLFEpK8_JSc3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GBiaWRpZmZgaMxMWoAY7Uwxg</recordid><startdate>20150923</startdate><enddate>20150923</enddate><creator>WAN PENG</creator><creator>SUN SHIHAO</creator><creator>GENG DONGMEI</creator><creator>JI BOLIN</creator><creator>WANG LING</creator><creator>WANG DEQIAN</creator><creator>YAO KUNFENG</creator><creator>ZHANG CHUANCHENG</creator><creator>ZHANG YUANFANG</creator><creator>WANG HAO</creator><creator>ZHOU YANLING</creator><creator>LI GANG</creator><scope>EVB</scope></search><sort><creationdate>20150923</creationdate><title>Formation and construction set for continuous open-cut tunnel</title><author>WAN PENG ; SUN SHIHAO ; GENG DONGMEI ; JI BOLIN ; WANG LING ; WANG DEQIAN ; YAO KUNFENG ; ZHANG CHUANCHENG ; ZHANG YUANFANG ; WANG HAO ; ZHOU YANLING ; LI GANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN104929660A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WAN PENG</creatorcontrib><creatorcontrib>SUN SHIHAO</creatorcontrib><creatorcontrib>GENG DONGMEI</creatorcontrib><creatorcontrib>JI BOLIN</creatorcontrib><creatorcontrib>WANG LING</creatorcontrib><creatorcontrib>WANG DEQIAN</creatorcontrib><creatorcontrib>YAO KUNFENG</creatorcontrib><creatorcontrib>ZHANG CHUANCHENG</creatorcontrib><creatorcontrib>ZHANG YUANFANG</creatorcontrib><creatorcontrib>WANG HAO</creatorcontrib><creatorcontrib>ZHOU YANLING</creatorcontrib><creatorcontrib>LI GANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WAN PENG</au><au>SUN SHIHAO</au><au>GENG DONGMEI</au><au>JI BOLIN</au><au>WANG LING</au><au>WANG DEQIAN</au><au>YAO KUNFENG</au><au>ZHANG CHUANCHENG</au><au>ZHANG YUANFANG</au><au>WANG HAO</au><au>ZHOU YANLING</au><au>LI GANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Formation and construction set for continuous open-cut tunnel</title><date>2015-09-23</date><risdate>2015</risdate><abstract>The invention discloses a formation and construction set for a continuous open-cut tunnel. The formation and construction set comprises a frame; the frame comprises two gantries; the gantries are connected together through a vertical beam; the vertical beam is connected with a formwork through a mechanical support; telescopic posts and travelling mechanisms are provided below the gantries. The formwork comprises a plurality of groups of tunnel arc forms vertically spliced; the tunnel arc forms in each group are in integrated large form structures, the tops of which fit the sectional shape of the tunnel; an arc slurry-lifting and leveling unit is arranged at the top of the tunnel arc forms. The formation and construction set is suitable for lining construction by a wall-first and arch-second method; the designed lining is suitable for use in highways, diversion tunnels, railway tunnels and the like, with less than 600mm of thickness. The formation and construction set is simple in structure and attractive in style, allows convenience for construction, and is of good integrity, high automation level, high form removal speed and high in-position speed.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN104929660A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Formation and construction set for continuous open-cut tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T19%3A38%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WAN%20PENG&rft.date=2015-09-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN104929660A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true