Concrete panel void repairing method

The invention relates to a concrete panel void repairing method. The purpose is to improve the efficiency of concrete anti-leakage panel void repairing and enhance the safety and reliability of engineering operation. According to the technical scheme, the method includes the steps that a, void regio...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG DONGLIANG, WANG DENGYIN, ZHOU TINGQING
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG DONGLIANG
WANG DENGYIN
ZHOU TINGQING
description The invention relates to a concrete panel void repairing method. The purpose is to improve the efficiency of concrete anti-leakage panel void repairing and enhance the safety and reliability of engineering operation. According to the technical scheme, the method includes the steps that a, void region detection is performed, LTD ground penetrating radar is adopted for detecting a panel void region and determining the panel void region, and void depth information is collected; b, grouting hole positions are arranged inside the panel void region, the distance d1 between grouting holes is equal to 2 m-3 m, the row distance d2 is equal to 2 m-4 m, and quincunx-type arrangement or rectangular arrangement can be performed; c, drilling is performed according to the arrangement of the grouting hole positions; d, grouting starts to be performed upwards step by step from the lower portion of a panel in the grouting process; e, after two hours from grouting, cement mortar is adopted for plugging the grouting holes, the plugging height is larger than the height of the panel by about 3 mm-5 mm, and the surface of the panel is polished to be flat after standing for about 8 hours; f, in hot weather, water should be sprayed to the void repairing region for maintenance.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN104912039A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN104912039A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN104912039A3</originalsourceid><addsrcrecordid>eNrjZFBxzs9LLkotSVUoSMxLzVEoy89MUShKLUjMLMrMS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBiaWhkYGxpaOxsSoAQALnCa8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Concrete panel void repairing method</title><source>esp@cenet</source><creator>WANG DONGLIANG ; WANG DENGYIN ; ZHOU TINGQING</creator><creatorcontrib>WANG DONGLIANG ; WANG DENGYIN ; ZHOU TINGQING</creatorcontrib><description>The invention relates to a concrete panel void repairing method. The purpose is to improve the efficiency of concrete anti-leakage panel void repairing and enhance the safety and reliability of engineering operation. According to the technical scheme, the method includes the steps that a, void region detection is performed, LTD ground penetrating radar is adopted for detecting a panel void region and determining the panel void region, and void depth information is collected; b, grouting hole positions are arranged inside the panel void region, the distance d1 between grouting holes is equal to 2 m-3 m, the row distance d2 is equal to 2 m-4 m, and quincunx-type arrangement or rectangular arrangement can be performed; c, drilling is performed according to the arrangement of the grouting hole positions; d, grouting starts to be performed upwards step by step from the lower portion of a panel in the grouting process; e, after two hours from grouting, cement mortar is adopted for plugging the grouting holes, the plugging height is larger than the height of the panel by about 3 mm-5 mm, and the surface of the panel is polished to be flat after standing for about 8 hours; f, in hot weather, water should be sprayed to the void repairing region for maintenance.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150916&amp;DB=EPODOC&amp;CC=CN&amp;NR=104912039A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150916&amp;DB=EPODOC&amp;CC=CN&amp;NR=104912039A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG DONGLIANG</creatorcontrib><creatorcontrib>WANG DENGYIN</creatorcontrib><creatorcontrib>ZHOU TINGQING</creatorcontrib><title>Concrete panel void repairing method</title><description>The invention relates to a concrete panel void repairing method. The purpose is to improve the efficiency of concrete anti-leakage panel void repairing and enhance the safety and reliability of engineering operation. According to the technical scheme, the method includes the steps that a, void region detection is performed, LTD ground penetrating radar is adopted for detecting a panel void region and determining the panel void region, and void depth information is collected; b, grouting hole positions are arranged inside the panel void region, the distance d1 between grouting holes is equal to 2 m-3 m, the row distance d2 is equal to 2 m-4 m, and quincunx-type arrangement or rectangular arrangement can be performed; c, drilling is performed according to the arrangement of the grouting hole positions; d, grouting starts to be performed upwards step by step from the lower portion of a panel in the grouting process; e, after two hours from grouting, cement mortar is adopted for plugging the grouting holes, the plugging height is larger than the height of the panel by about 3 mm-5 mm, and the surface of the panel is polished to be flat after standing for about 8 hours; f, in hot weather, water should be sprayed to the void repairing region for maintenance.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBxzs9LLkotSVUoSMxLzVEoy89MUShKLUjMLMrMS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBiaWhkYGxpaOxsSoAQALnCa8</recordid><startdate>20150916</startdate><enddate>20150916</enddate><creator>WANG DONGLIANG</creator><creator>WANG DENGYIN</creator><creator>ZHOU TINGQING</creator><scope>EVB</scope></search><sort><creationdate>20150916</creationdate><title>Concrete panel void repairing method</title><author>WANG DONGLIANG ; WANG DENGYIN ; ZHOU TINGQING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN104912039A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG DONGLIANG</creatorcontrib><creatorcontrib>WANG DENGYIN</creatorcontrib><creatorcontrib>ZHOU TINGQING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG DONGLIANG</au><au>WANG DENGYIN</au><au>ZHOU TINGQING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Concrete panel void repairing method</title><date>2015-09-16</date><risdate>2015</risdate><abstract>The invention relates to a concrete panel void repairing method. The purpose is to improve the efficiency of concrete anti-leakage panel void repairing and enhance the safety and reliability of engineering operation. According to the technical scheme, the method includes the steps that a, void region detection is performed, LTD ground penetrating radar is adopted for detecting a panel void region and determining the panel void region, and void depth information is collected; b, grouting hole positions are arranged inside the panel void region, the distance d1 between grouting holes is equal to 2 m-3 m, the row distance d2 is equal to 2 m-4 m, and quincunx-type arrangement or rectangular arrangement can be performed; c, drilling is performed according to the arrangement of the grouting hole positions; d, grouting starts to be performed upwards step by step from the lower portion of a panel in the grouting process; e, after two hours from grouting, cement mortar is adopted for plugging the grouting holes, the plugging height is larger than the height of the panel by about 3 mm-5 mm, and the surface of the panel is polished to be flat after standing for about 8 hours; f, in hot weather, water should be sprayed to the void repairing region for maintenance.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN104912039A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Concrete panel void repairing method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T13%3A50%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20DONGLIANG&rft.date=2015-09-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN104912039A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true