Lifting method for frame bridge box body

A lifting method for a frame bridge box body comprises the steps of carrying out joint cleaning on settlement joints in a picking mode, then using a water drill to drill holes downwards at the positions and injecting grout to separate U-shaped grooves from the box body; forming grout stopping walls...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIAO BAOHAI, LIU JUNFENG, YU HAI, ZHANG YING, ZHAO ZHENJIE, ZHU HAITAO, LIU YANG, LI HUAN, AN HAIPING, WANG XI, ZHENG RUBIN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XIAO BAOHAI
LIU JUNFENG
YU HAI
ZHANG YING
ZHAO ZHENJIE
ZHU HAITAO
LIU YANG
LI HUAN
AN HAIPING
WANG XI
ZHENG RUBIN
description A lifting method for a frame bridge box body comprises the steps of carrying out joint cleaning on settlement joints in a picking mode, then using a water drill to drill holes downwards at the positions and injecting grout to separate U-shaped grooves from the box body; forming grout stopping walls in soil bodies at the positions of the front end and the rear end of the box body; forming a plurality of reinforcing holes, lifting holes and complementary holes in the rear portion, the front portion and the middle of a bottom plate of the box body respectively; utilizing a grout injecting machine to carry out grouting operation on the holes and the like. By means of the lifting method for the frame bridge box body, approaches on the two sides of the box body are not needed to be disassembled, and the use amount of cement is saved by 20% compared with an existing method so that the construction cost can be greatly reduced, the construction period can be shortened, and the construction difficulty can further be reduced. Meanwhile, the lifting method for the frame bridge box body has the advantages of being high in operation performance and safety performance and the like, and has remarkable advancement and practicality.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN104727230A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN104727230A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN104727230A3</originalsourceid><addsrcrecordid>eNrjZNDwyUwrycxLV8hNLcnIT1FIyy9SSCtKzE1VSCrKTEkHUvkVQJxSycPAmpaYU5zKC6W5GRTdXEOcPXRTC_LjU4sLEpNT81JL4p39DA1MzI3MjYwNHI2JUQMAnuMnxw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Lifting method for frame bridge box body</title><source>esp@cenet</source><creator>XIAO BAOHAI ; LIU JUNFENG ; YU HAI ; ZHANG YING ; ZHAO ZHENJIE ; ZHU HAITAO ; LIU YANG ; LI HUAN ; AN HAIPING ; WANG XI ; ZHENG RUBIN</creator><creatorcontrib>XIAO BAOHAI ; LIU JUNFENG ; YU HAI ; ZHANG YING ; ZHAO ZHENJIE ; ZHU HAITAO ; LIU YANG ; LI HUAN ; AN HAIPING ; WANG XI ; ZHENG RUBIN</creatorcontrib><description>A lifting method for a frame bridge box body comprises the steps of carrying out joint cleaning on settlement joints in a picking mode, then using a water drill to drill holes downwards at the positions and injecting grout to separate U-shaped grooves from the box body; forming grout stopping walls in soil bodies at the positions of the front end and the rear end of the box body; forming a plurality of reinforcing holes, lifting holes and complementary holes in the rear portion, the front portion and the middle of a bottom plate of the box body respectively; utilizing a grout injecting machine to carry out grouting operation on the holes and the like. By means of the lifting method for the frame bridge box body, approaches on the two sides of the box body are not needed to be disassembled, and the use amount of cement is saved by 20% compared with an existing method so that the construction cost can be greatly reduced, the construction period can be shortened, and the construction difficulty can further be reduced. Meanwhile, the lifting method for the frame bridge box body has the advantages of being high in operation performance and safety performance and the like, and has remarkable advancement and practicality.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; OR VIADUCTS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150624&amp;DB=EPODOC&amp;CC=CN&amp;NR=104727230A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150624&amp;DB=EPODOC&amp;CC=CN&amp;NR=104727230A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIAO BAOHAI</creatorcontrib><creatorcontrib>LIU JUNFENG</creatorcontrib><creatorcontrib>YU HAI</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>ZHAO ZHENJIE</creatorcontrib><creatorcontrib>ZHU HAITAO</creatorcontrib><creatorcontrib>LIU YANG</creatorcontrib><creatorcontrib>LI HUAN</creatorcontrib><creatorcontrib>AN HAIPING</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>ZHENG RUBIN</creatorcontrib><title>Lifting method for frame bridge box body</title><description>A lifting method for a frame bridge box body comprises the steps of carrying out joint cleaning on settlement joints in a picking mode, then using a water drill to drill holes downwards at the positions and injecting grout to separate U-shaped grooves from the box body; forming grout stopping walls in soil bodies at the positions of the front end and the rear end of the box body; forming a plurality of reinforcing holes, lifting holes and complementary holes in the rear portion, the front portion and the middle of a bottom plate of the box body respectively; utilizing a grout injecting machine to carry out grouting operation on the holes and the like. By means of the lifting method for the frame bridge box body, approaches on the two sides of the box body are not needed to be disassembled, and the use amount of cement is saved by 20% compared with an existing method so that the construction cost can be greatly reduced, the construction period can be shortened, and the construction difficulty can further be reduced. Meanwhile, the lifting method for the frame bridge box body has the advantages of being high in operation performance and safety performance and the like, and has remarkable advancement and practicality.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>OR VIADUCTS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDwyUwrycxLV8hNLcnIT1FIyy9SSCtKzE1VSCrKTEkHUvkVQJxSycPAmpaYU5zKC6W5GRTdXEOcPXRTC_LjU4sLEpNT81JL4p39DA1MzI3MjYwNHI2JUQMAnuMnxw</recordid><startdate>20150624</startdate><enddate>20150624</enddate><creator>XIAO BAOHAI</creator><creator>LIU JUNFENG</creator><creator>YU HAI</creator><creator>ZHANG YING</creator><creator>ZHAO ZHENJIE</creator><creator>ZHU HAITAO</creator><creator>LIU YANG</creator><creator>LI HUAN</creator><creator>AN HAIPING</creator><creator>WANG XI</creator><creator>ZHENG RUBIN</creator><scope>EVB</scope></search><sort><creationdate>20150624</creationdate><title>Lifting method for frame bridge box body</title><author>XIAO BAOHAI ; LIU JUNFENG ; YU HAI ; ZHANG YING ; ZHAO ZHENJIE ; ZHU HAITAO ; LIU YANG ; LI HUAN ; AN HAIPING ; WANG XI ; ZHENG RUBIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN104727230A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>OR VIADUCTS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>XIAO BAOHAI</creatorcontrib><creatorcontrib>LIU JUNFENG</creatorcontrib><creatorcontrib>YU HAI</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>ZHAO ZHENJIE</creatorcontrib><creatorcontrib>ZHU HAITAO</creatorcontrib><creatorcontrib>LIU YANG</creatorcontrib><creatorcontrib>LI HUAN</creatorcontrib><creatorcontrib>AN HAIPING</creatorcontrib><creatorcontrib>WANG XI</creatorcontrib><creatorcontrib>ZHENG RUBIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIAO BAOHAI</au><au>LIU JUNFENG</au><au>YU HAI</au><au>ZHANG YING</au><au>ZHAO ZHENJIE</au><au>ZHU HAITAO</au><au>LIU YANG</au><au>LI HUAN</au><au>AN HAIPING</au><au>WANG XI</au><au>ZHENG RUBIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Lifting method for frame bridge box body</title><date>2015-06-24</date><risdate>2015</risdate><abstract>A lifting method for a frame bridge box body comprises the steps of carrying out joint cleaning on settlement joints in a picking mode, then using a water drill to drill holes downwards at the positions and injecting grout to separate U-shaped grooves from the box body; forming grout stopping walls in soil bodies at the positions of the front end and the rear end of the box body; forming a plurality of reinforcing holes, lifting holes and complementary holes in the rear portion, the front portion and the middle of a bottom plate of the box body respectively; utilizing a grout injecting machine to carry out grouting operation on the holes and the like. By means of the lifting method for the frame bridge box body, approaches on the two sides of the box body are not needed to be disassembled, and the use amount of cement is saved by 20% compared with an existing method so that the construction cost can be greatly reduced, the construction period can be shortened, and the construction difficulty can further be reduced. Meanwhile, the lifting method for the frame bridge box body has the advantages of being high in operation performance and safety performance and the like, and has remarkable advancement and practicality.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN104727230A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
OR VIADUCTS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Lifting method for frame bridge box body
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T22%3A29%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIAO%20BAOHAI&rft.date=2015-06-24&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN104727230A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true