Method for hoisting construction girder sections through cables

The invention relates to the field of bridge construction and discloses a method for hoisting construction girder sections through cables. The method includes the steps: erecting a first main cable, a second main cable and a plurality of booms; taking a region at the bottom of each boom to arrange a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHOU GANG, TU MANMING, PAN DONGFA, WEN WUSONG, JI YUEHUA, XIE SHOUJIE, DU FENG, LI JUNTANG, ZHANG RUIXIA, ZHANG XIAOCHUAN, DAI HAO, XU JIAPING, XING SIJIA, HU HANZHOU, DUAN MIAOQI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the field of bridge construction and discloses a method for hoisting construction girder sections through cables. The method includes the steps: erecting a first main cable, a second main cable and a plurality of booms; taking a region at the bottom of each boom to arrange a hoisting device below the first main cable and the second main cable; transporting a to-be-mounted girder section to a hoisting position, and adjusting the to-be-mounted girder section to be perpendicular to the mounting direction; selecting one mounting region with no to-be-mounted girder section, enabling the hoisting device to move above the current mounting region after longitudinally hoisting the to-be-mounted girder section to a position 1-2m above a bridge deck, horizontally rotating the to-be-mounted girder section by 90 degrees, placing the to-be-mounted girder section at a designed elevation, and fixing the to-be-mounted girder section to the current mounting region and the bridge deck to form a mounted section. By adoption of the method for hoisting construction girder sections through cables, manufacturing cost can be reduced, arrangement of a girder section hoisting platform in a main span is avoided, and normal operation of a river channel is guaranteed.