Safe and fast construction method of down-traversing river shallow depth bored tunnel

The invention discloses a safe and fast construction method of a down-traversing river shallow depth bored tunnel. The method includes the steps that on the two sides of the tunnel, the upstream and the downstream of a river are each provided with a clay cofferdam so that the river can be intercepte...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG YUEHUI, CHEN CHANGLIAN, TIAN JINGFEI, ZHAO CHUNHUA, ZHAO JUN, LU CHUNLIN, DENG JIANLIN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG YUEHUI
CHEN CHANGLIAN
TIAN JINGFEI
ZHAO CHUNHUA
ZHAO JUN
LU CHUNLIN
DENG JIANLIN
description The invention discloses a safe and fast construction method of a down-traversing river shallow depth bored tunnel. The method includes the steps that on the two sides of the tunnel, the upstream and the downstream of a river are each provided with a clay cofferdam so that the river can be intercepted, and a dry river bed is formed in a tunnel construction area; the two constructed clay cofferdams are communicated through a flow guiding pipe, and therefore upstream river water and downstream river water can flow; the two sides of the tunnel are each provided with at least one row of Larsen steel plate piles, and the tunnel is excavated after the Larsen steel plate piles extend to a river bank in the axial direction of the tunnel. The clay cofferdams, the flow guiding pipe and the Larsen steel plate piles are matched coordinately and comprehensively utilized, and tunnel construction safety is guaranteed by the clay cofferdams, the flow guiding pipe and the Larsen steel plate piles jointly. The method is good in construction safety and high in construction efficiency, treatment measures are flexible, pertinent adjustment can be performed according to different geological conditions, and manufacturing cost of projects is saved as much as possible on the premise that safety is guaranteed.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN104631475A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN104631475A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN104631475A3</originalsourceid><addsrcrecordid>eNqNyjEOwjAMQNEsDAi4gzlAJaoWmFEFYmIB5so0DokU7Chx6fVh4ABM_w1_bu5XdATIFhwWhUG4aB4HDcLwIvViQRxYmbjSjG_KJfATcvgKiscYZQJLST08JJMFHZkpLs3MYSy0-nVh1qfjrTtXlKSnknAgJu27S71pd03d7reH5p_nA_j6OX4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Safe and fast construction method of down-traversing river shallow depth bored tunnel</title><source>esp@cenet</source><creator>WANG YUEHUI ; CHEN CHANGLIAN ; TIAN JINGFEI ; ZHAO CHUNHUA ; ZHAO JUN ; LU CHUNLIN ; DENG JIANLIN</creator><creatorcontrib>WANG YUEHUI ; CHEN CHANGLIAN ; TIAN JINGFEI ; ZHAO CHUNHUA ; ZHAO JUN ; LU CHUNLIN ; DENG JIANLIN</creatorcontrib><description>The invention discloses a safe and fast construction method of a down-traversing river shallow depth bored tunnel. The method includes the steps that on the two sides of the tunnel, the upstream and the downstream of a river are each provided with a clay cofferdam so that the river can be intercepted, and a dry river bed is formed in a tunnel construction area; the two constructed clay cofferdams are communicated through a flow guiding pipe, and therefore upstream river water and downstream river water can flow; the two sides of the tunnel are each provided with at least one row of Larsen steel plate piles, and the tunnel is excavated after the Larsen steel plate piles extend to a river bank in the axial direction of the tunnel. The clay cofferdams, the flow guiding pipe and the Larsen steel plate piles are matched coordinately and comprehensively utilized, and tunnel construction safety is guaranteed by the clay cofferdams, the flow guiding pipe and the Larsen steel plate piles jointly. The method is good in construction safety and high in construction efficiency, treatment measures are flexible, pertinent adjustment can be performed according to different geological conditions, and manufacturing cost of projects is saved as much as possible on the premise that safety is guaranteed.</description><language>eng</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150520&amp;DB=EPODOC&amp;CC=CN&amp;NR=104631475A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150520&amp;DB=EPODOC&amp;CC=CN&amp;NR=104631475A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG YUEHUI</creatorcontrib><creatorcontrib>CHEN CHANGLIAN</creatorcontrib><creatorcontrib>TIAN JINGFEI</creatorcontrib><creatorcontrib>ZHAO CHUNHUA</creatorcontrib><creatorcontrib>ZHAO JUN</creatorcontrib><creatorcontrib>LU CHUNLIN</creatorcontrib><creatorcontrib>DENG JIANLIN</creatorcontrib><title>Safe and fast construction method of down-traversing river shallow depth bored tunnel</title><description>The invention discloses a safe and fast construction method of a down-traversing river shallow depth bored tunnel. The method includes the steps that on the two sides of the tunnel, the upstream and the downstream of a river are each provided with a clay cofferdam so that the river can be intercepted, and a dry river bed is formed in a tunnel construction area; the two constructed clay cofferdams are communicated through a flow guiding pipe, and therefore upstream river water and downstream river water can flow; the two sides of the tunnel are each provided with at least one row of Larsen steel plate piles, and the tunnel is excavated after the Larsen steel plate piles extend to a river bank in the axial direction of the tunnel. The clay cofferdams, the flow guiding pipe and the Larsen steel plate piles are matched coordinately and comprehensively utilized, and tunnel construction safety is guaranteed by the clay cofferdams, the flow guiding pipe and the Larsen steel plate piles jointly. The method is good in construction safety and high in construction efficiency, treatment measures are flexible, pertinent adjustment can be performed according to different geological conditions, and manufacturing cost of projects is saved as much as possible on the premise that safety is guaranteed.</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEOwjAMQNEsDAi4gzlAJaoWmFEFYmIB5so0DokU7Chx6fVh4ABM_w1_bu5XdATIFhwWhUG4aB4HDcLwIvViQRxYmbjSjG_KJfATcvgKiscYZQJLST08JJMFHZkpLs3MYSy0-nVh1qfjrTtXlKSnknAgJu27S71pd03d7reH5p_nA_j6OX4</recordid><startdate>20150520</startdate><enddate>20150520</enddate><creator>WANG YUEHUI</creator><creator>CHEN CHANGLIAN</creator><creator>TIAN JINGFEI</creator><creator>ZHAO CHUNHUA</creator><creator>ZHAO JUN</creator><creator>LU CHUNLIN</creator><creator>DENG JIANLIN</creator><scope>EVB</scope></search><sort><creationdate>20150520</creationdate><title>Safe and fast construction method of down-traversing river shallow depth bored tunnel</title><author>WANG YUEHUI ; CHEN CHANGLIAN ; TIAN JINGFEI ; ZHAO CHUNHUA ; ZHAO JUN ; LU CHUNLIN ; DENG JIANLIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN104631475A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG YUEHUI</creatorcontrib><creatorcontrib>CHEN CHANGLIAN</creatorcontrib><creatorcontrib>TIAN JINGFEI</creatorcontrib><creatorcontrib>ZHAO CHUNHUA</creatorcontrib><creatorcontrib>ZHAO JUN</creatorcontrib><creatorcontrib>LU CHUNLIN</creatorcontrib><creatorcontrib>DENG JIANLIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG YUEHUI</au><au>CHEN CHANGLIAN</au><au>TIAN JINGFEI</au><au>ZHAO CHUNHUA</au><au>ZHAO JUN</au><au>LU CHUNLIN</au><au>DENG JIANLIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Safe and fast construction method of down-traversing river shallow depth bored tunnel</title><date>2015-05-20</date><risdate>2015</risdate><abstract>The invention discloses a safe and fast construction method of a down-traversing river shallow depth bored tunnel. The method includes the steps that on the two sides of the tunnel, the upstream and the downstream of a river are each provided with a clay cofferdam so that the river can be intercepted, and a dry river bed is formed in a tunnel construction area; the two constructed clay cofferdams are communicated through a flow guiding pipe, and therefore upstream river water and downstream river water can flow; the two sides of the tunnel are each provided with at least one row of Larsen steel plate piles, and the tunnel is excavated after the Larsen steel plate piles extend to a river bank in the axial direction of the tunnel. The clay cofferdams, the flow guiding pipe and the Larsen steel plate piles are matched coordinately and comprehensively utilized, and tunnel construction safety is guaranteed by the clay cofferdams, the flow guiding pipe and the Larsen steel plate piles jointly. The method is good in construction safety and high in construction efficiency, treatment measures are flexible, pertinent adjustment can be performed according to different geological conditions, and manufacturing cost of projects is saved as much as possible on the premise that safety is guaranteed.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN104631475A
source esp@cenet
subjects EARTH DRILLING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
GALLERIES
HYDRAULIC ENGINEERING
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
SOIL SHIFTING
TUNNELS
UNDERGROUND OR UNDERWATER STRUCTURES
title Safe and fast construction method of down-traversing river shallow depth bored tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T06%3A16%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20YUEHUI&rft.date=2015-05-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN104631475A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true