Novel cast-in-place waterstone ground surface layer construction method

The invention discloses a novel cast-in-place waterstone ground surface layer construction method. The novel cast-in-place waterstone ground surface layer construction method comprises the following steps: (1) treating a base layer; (2) pouring water and wetting; (3) carrying out ground bottom ash s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JING XIEXIE, HAN YONGLI, ZHANG HONG, GAO GUODONG, YAO JIPING, ZHOU WENJING, YAN LINTING, WANG ZHE, ZHI SHUANMING, MA BAOQING
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator JING XIEXIE
HAN YONGLI
ZHANG HONG
GAO GUODONG
YAO JIPING
ZHOU WENJING
YAN LINTING
WANG ZHE
ZHI SHUANMING
MA BAOQING
description The invention discloses a novel cast-in-place waterstone ground surface layer construction method. The novel cast-in-place waterstone ground surface layer construction method comprises the following steps: (1) treating a base layer; (2) pouring water and wetting; (3) carrying out ground bottom ash screeding; 4) paving bottom ash; (5) carrying out mesh division by elastic lines; (6) embedding dividing strips; (7) brushing a bonding layer; (8) paving stone particle slurry; (9) rolling compactly, and paving and flattening; (10) carrying out trial grinding; (12) finely grinding; (13) feeding a concrete curing agent; (14) precisely grinding; (15) carrying out crystal face treatment on the surface of a waterstone. The novel cast-in-place waterstone ground surface layer construction method has the advantages that the surface smoothness of the waterstone is high; the surface hardness reaches Grade5-7; the waterstone has permeation resistance and is waterproof and dirt-proof, has the water permeation rate of being less than 0.8, and is oil-proof, weak-acid-proof, weak-alkali-proof and salt-fog-proof; the comprehensive performance of natural protection exceeds that of any existing stone product; a cast-in-place waterstone ground has zero dead angle when being ground and polished, and the ground appearance quality is greatly improved when being compared with that of a traditional method.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN104563507A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN104563507A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN104563507A3</originalsourceid><addsrcrecordid>eNrjZHD3yy9LzVFITiwu0c3M0y3ISUxOVShPLEktKi7Jz0tVSC_KL81LUSguLUoDyeQkVqYWKSTn5xWXFJUml2Tm5ynkppZk5KfwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4gKg5rzUknhnP0MDE1MzY1MDc0djYtQAAKKQNH4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Novel cast-in-place waterstone ground surface layer construction method</title><source>esp@cenet</source><creator>JING XIEXIE ; HAN YONGLI ; ZHANG HONG ; GAO GUODONG ; YAO JIPING ; ZHOU WENJING ; YAN LINTING ; WANG ZHE ; ZHI SHUANMING ; MA BAOQING</creator><creatorcontrib>JING XIEXIE ; HAN YONGLI ; ZHANG HONG ; GAO GUODONG ; YAO JIPING ; ZHOU WENJING ; YAN LINTING ; WANG ZHE ; ZHI SHUANMING ; MA BAOQING</creatorcontrib><description>The invention discloses a novel cast-in-place waterstone ground surface layer construction method. The novel cast-in-place waterstone ground surface layer construction method comprises the following steps: (1) treating a base layer; (2) pouring water and wetting; (3) carrying out ground bottom ash screeding; 4) paving bottom ash; (5) carrying out mesh division by elastic lines; (6) embedding dividing strips; (7) brushing a bonding layer; (8) paving stone particle slurry; (9) rolling compactly, and paving and flattening; (10) carrying out trial grinding; (12) finely grinding; (13) feeding a concrete curing agent; (14) precisely grinding; (15) carrying out crystal face treatment on the surface of a waterstone. The novel cast-in-place waterstone ground surface layer construction method has the advantages that the surface smoothness of the waterstone is high; the surface hardness reaches Grade5-7; the waterstone has permeation resistance and is waterproof and dirt-proof, has the water permeation rate of being less than 0.8, and is oil-proof, weak-acid-proof, weak-alkali-proof and salt-fog-proof; the comprehensive performance of natural protection exceeds that of any existing stone product; a cast-in-place waterstone ground has zero dead angle when being ground and polished, and the ground appearance quality is greatly improved when being compared with that of a traditional method.</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150429&amp;DB=EPODOC&amp;CC=CN&amp;NR=104563507A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150429&amp;DB=EPODOC&amp;CC=CN&amp;NR=104563507A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JING XIEXIE</creatorcontrib><creatorcontrib>HAN YONGLI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>GAO GUODONG</creatorcontrib><creatorcontrib>YAO JIPING</creatorcontrib><creatorcontrib>ZHOU WENJING</creatorcontrib><creatorcontrib>YAN LINTING</creatorcontrib><creatorcontrib>WANG ZHE</creatorcontrib><creatorcontrib>ZHI SHUANMING</creatorcontrib><creatorcontrib>MA BAOQING</creatorcontrib><title>Novel cast-in-place waterstone ground surface layer construction method</title><description>The invention discloses a novel cast-in-place waterstone ground surface layer construction method. The novel cast-in-place waterstone ground surface layer construction method comprises the following steps: (1) treating a base layer; (2) pouring water and wetting; (3) carrying out ground bottom ash screeding; 4) paving bottom ash; (5) carrying out mesh division by elastic lines; (6) embedding dividing strips; (7) brushing a bonding layer; (8) paving stone particle slurry; (9) rolling compactly, and paving and flattening; (10) carrying out trial grinding; (12) finely grinding; (13) feeding a concrete curing agent; (14) precisely grinding; (15) carrying out crystal face treatment on the surface of a waterstone. The novel cast-in-place waterstone ground surface layer construction method has the advantages that the surface smoothness of the waterstone is high; the surface hardness reaches Grade5-7; the waterstone has permeation resistance and is waterproof and dirt-proof, has the water permeation rate of being less than 0.8, and is oil-proof, weak-acid-proof, weak-alkali-proof and salt-fog-proof; the comprehensive performance of natural protection exceeds that of any existing stone product; a cast-in-place waterstone ground has zero dead angle when being ground and polished, and the ground appearance quality is greatly improved when being compared with that of a traditional method.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHD3yy9LzVFITiwu0c3M0y3ISUxOVShPLEktKi7Jz0tVSC_KL81LUSguLUoDyeQkVqYWKSTn5xWXFJUml2Tm5ynkppZk5KfwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4gKg5rzUknhnP0MDE1MzY1MDc0djYtQAAKKQNH4</recordid><startdate>20150429</startdate><enddate>20150429</enddate><creator>JING XIEXIE</creator><creator>HAN YONGLI</creator><creator>ZHANG HONG</creator><creator>GAO GUODONG</creator><creator>YAO JIPING</creator><creator>ZHOU WENJING</creator><creator>YAN LINTING</creator><creator>WANG ZHE</creator><creator>ZHI SHUANMING</creator><creator>MA BAOQING</creator><scope>EVB</scope></search><sort><creationdate>20150429</creationdate><title>Novel cast-in-place waterstone ground surface layer construction method</title><author>JING XIEXIE ; HAN YONGLI ; ZHANG HONG ; GAO GUODONG ; YAO JIPING ; ZHOU WENJING ; YAN LINTING ; WANG ZHE ; ZHI SHUANMING ; MA BAOQING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN104563507A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>JING XIEXIE</creatorcontrib><creatorcontrib>HAN YONGLI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>GAO GUODONG</creatorcontrib><creatorcontrib>YAO JIPING</creatorcontrib><creatorcontrib>ZHOU WENJING</creatorcontrib><creatorcontrib>YAN LINTING</creatorcontrib><creatorcontrib>WANG ZHE</creatorcontrib><creatorcontrib>ZHI SHUANMING</creatorcontrib><creatorcontrib>MA BAOQING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JING XIEXIE</au><au>HAN YONGLI</au><au>ZHANG HONG</au><au>GAO GUODONG</au><au>YAO JIPING</au><au>ZHOU WENJING</au><au>YAN LINTING</au><au>WANG ZHE</au><au>ZHI SHUANMING</au><au>MA BAOQING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Novel cast-in-place waterstone ground surface layer construction method</title><date>2015-04-29</date><risdate>2015</risdate><abstract>The invention discloses a novel cast-in-place waterstone ground surface layer construction method. The novel cast-in-place waterstone ground surface layer construction method comprises the following steps: (1) treating a base layer; (2) pouring water and wetting; (3) carrying out ground bottom ash screeding; 4) paving bottom ash; (5) carrying out mesh division by elastic lines; (6) embedding dividing strips; (7) brushing a bonding layer; (8) paving stone particle slurry; (9) rolling compactly, and paving and flattening; (10) carrying out trial grinding; (12) finely grinding; (13) feeding a concrete curing agent; (14) precisely grinding; (15) carrying out crystal face treatment on the surface of a waterstone. The novel cast-in-place waterstone ground surface layer construction method has the advantages that the surface smoothness of the waterstone is high; the surface hardness reaches Grade5-7; the waterstone has permeation resistance and is waterproof and dirt-proof, has the water permeation rate of being less than 0.8, and is oil-proof, weak-acid-proof, weak-alkali-proof and salt-fog-proof; the comprehensive performance of natural protection exceeds that of any existing stone product; a cast-in-place waterstone ground has zero dead angle when being ground and polished, and the ground appearance quality is greatly improved when being compared with that of a traditional method.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN104563507A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
title Novel cast-in-place waterstone ground surface layer construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T10%3A08%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JING%20XIEXIE&rft.date=2015-04-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN104563507A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true