Assessment method of whole-course real-time service life of lifting steel wire rope of crane

The invention relates to an assessment method of a whole-course real-time service life of a lifting steel wire rope of a crane. The invention mainly solves technical problems that whole-course real-time tracking and service life assessment to the lifting steel wire rope are not available and quick e...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GAO CHONGREN, GAO YOUSHAN, ZHANG YAN, WANG AIHONG, YIN YUFENG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GAO CHONGREN
GAO YOUSHAN
ZHANG YAN
WANG AIHONG
YIN YUFENG
description The invention relates to an assessment method of a whole-course real-time service life of a lifting steel wire rope of a crane. The invention mainly solves technical problems that whole-course real-time tracking and service life assessment to the lifting steel wire rope are not available and quick early warning cannot be carried out timely. A technical scheme in the invention is that the assessment method includes following steps: (1) collecting real-time operation data of the crane; (2) sectioning the whole lifting steel wire rope on the basis of a multiplying ratio of a lifting pulley block; (3) calculating a tensile force on each section of the lifting steel wire rope under three situations of a lifting mechanism; (4) establishing a mechanical model of the tensile force on each section of the lifting steel wire rope during a whole travelling process; (5) calculating a stress in each section of the lifting steel wire rope; (6) performing statistical analysis to real-time stress change of each point; (7) calculating a service life of an evaluation point in each section of the lifting steel wire rope; (8) evaluating a whole-course service life of the lifting steel wire rope; and (9) performing early warning to the lifting steel wire rope.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN104401874A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN104401874A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN104401874A3</originalsourceid><addsrcrecordid>eNqNyr0KwjAUhuEsDqLew_ECAi0GdC1FcXJyFEqIX2wgf-REe_tW8QKc3uF9luLWMYM5IFYKqGO6U7I0jclDmvQsDCrQXlYXQIzycgbkncWHza0uPogr4GlyZcYpf5cpOmItFlZ7xubXldiejtf-LJHTAM7aIKIO_aVtlGraw151u3_MG5XMO3E</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Assessment method of whole-course real-time service life of lifting steel wire rope of crane</title><source>esp@cenet</source><creator>GAO CHONGREN ; GAO YOUSHAN ; ZHANG YAN ; WANG AIHONG ; YIN YUFENG</creator><creatorcontrib>GAO CHONGREN ; GAO YOUSHAN ; ZHANG YAN ; WANG AIHONG ; YIN YUFENG</creatorcontrib><description>The invention relates to an assessment method of a whole-course real-time service life of a lifting steel wire rope of a crane. The invention mainly solves technical problems that whole-course real-time tracking and service life assessment to the lifting steel wire rope are not available and quick early warning cannot be carried out timely. A technical scheme in the invention is that the assessment method includes following steps: (1) collecting real-time operation data of the crane; (2) sectioning the whole lifting steel wire rope on the basis of a multiplying ratio of a lifting pulley block; (3) calculating a tensile force on each section of the lifting steel wire rope under three situations of a lifting mechanism; (4) establishing a mechanical model of the tensile force on each section of the lifting steel wire rope during a whole travelling process; (5) calculating a stress in each section of the lifting steel wire rope; (6) performing statistical analysis to real-time stress change of each point; (7) calculating a service life of an evaluation point in each section of the lifting steel wire rope; (8) evaluating a whole-course service life of the lifting steel wire rope; and (9) performing early warning to the lifting steel wire rope.</description><language>eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150311&amp;DB=EPODOC&amp;CC=CN&amp;NR=104401874A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150311&amp;DB=EPODOC&amp;CC=CN&amp;NR=104401874A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GAO CHONGREN</creatorcontrib><creatorcontrib>GAO YOUSHAN</creatorcontrib><creatorcontrib>ZHANG YAN</creatorcontrib><creatorcontrib>WANG AIHONG</creatorcontrib><creatorcontrib>YIN YUFENG</creatorcontrib><title>Assessment method of whole-course real-time service life of lifting steel wire rope of crane</title><description>The invention relates to an assessment method of a whole-course real-time service life of a lifting steel wire rope of a crane. The invention mainly solves technical problems that whole-course real-time tracking and service life assessment to the lifting steel wire rope are not available and quick early warning cannot be carried out timely. A technical scheme in the invention is that the assessment method includes following steps: (1) collecting real-time operation data of the crane; (2) sectioning the whole lifting steel wire rope on the basis of a multiplying ratio of a lifting pulley block; (3) calculating a tensile force on each section of the lifting steel wire rope under three situations of a lifting mechanism; (4) establishing a mechanical model of the tensile force on each section of the lifting steel wire rope during a whole travelling process; (5) calculating a stress in each section of the lifting steel wire rope; (6) performing statistical analysis to real-time stress change of each point; (7) calculating a service life of an evaluation point in each section of the lifting steel wire rope; (8) evaluating a whole-course service life of the lifting steel wire rope; and (9) performing early warning to the lifting steel wire rope.</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyr0KwjAUhuEsDqLew_ECAi0GdC1FcXJyFEqIX2wgf-REe_tW8QKc3uF9luLWMYM5IFYKqGO6U7I0jclDmvQsDCrQXlYXQIzycgbkncWHza0uPogr4GlyZcYpf5cpOmItFlZ7xubXldiejtf-LJHTAM7aIKIO_aVtlGraw151u3_MG5XMO3E</recordid><startdate>20150311</startdate><enddate>20150311</enddate><creator>GAO CHONGREN</creator><creator>GAO YOUSHAN</creator><creator>ZHANG YAN</creator><creator>WANG AIHONG</creator><creator>YIN YUFENG</creator><scope>EVB</scope></search><sort><creationdate>20150311</creationdate><title>Assessment method of whole-course real-time service life of lifting steel wire rope of crane</title><author>GAO CHONGREN ; GAO YOUSHAN ; ZHANG YAN ; WANG AIHONG ; YIN YUFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN104401874A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>GAO CHONGREN</creatorcontrib><creatorcontrib>GAO YOUSHAN</creatorcontrib><creatorcontrib>ZHANG YAN</creatorcontrib><creatorcontrib>WANG AIHONG</creatorcontrib><creatorcontrib>YIN YUFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GAO CHONGREN</au><au>GAO YOUSHAN</au><au>ZHANG YAN</au><au>WANG AIHONG</au><au>YIN YUFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Assessment method of whole-course real-time service life of lifting steel wire rope of crane</title><date>2015-03-11</date><risdate>2015</risdate><abstract>The invention relates to an assessment method of a whole-course real-time service life of a lifting steel wire rope of a crane. The invention mainly solves technical problems that whole-course real-time tracking and service life assessment to the lifting steel wire rope are not available and quick early warning cannot be carried out timely. A technical scheme in the invention is that the assessment method includes following steps: (1) collecting real-time operation data of the crane; (2) sectioning the whole lifting steel wire rope on the basis of a multiplying ratio of a lifting pulley block; (3) calculating a tensile force on each section of the lifting steel wire rope under three situations of a lifting mechanism; (4) establishing a mechanical model of the tensile force on each section of the lifting steel wire rope during a whole travelling process; (5) calculating a stress in each section of the lifting steel wire rope; (6) performing statistical analysis to real-time stress change of each point; (7) calculating a service life of an evaluation point in each section of the lifting steel wire rope; (8) evaluating a whole-course service life of the lifting steel wire rope; and (9) performing early warning to the lifting steel wire rope.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN104401874A
source esp@cenet
subjects CRANES
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
PERFORMING OPERATIONS
TRANSPORTING
title Assessment method of whole-course real-time service life of lifting steel wire rope of crane
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T09%3A16%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GAO%20CHONGREN&rft.date=2015-03-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN104401874A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true