Loop butting tunnel lining construction method

The invention relates to a loop butting tunnel lining construction method which is used for performing a field operation of secondary tunnel lining concreting. The construction method is characterized in that at least two formwork groups and a formwork trolley are adopted; the formwork groups can be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: PAN WENXIANG, WU YUANPING, YAN SHAOFA, BIAN PENGFEI, LIU YUANYUAN, ZHAO ZONGZHI, ZHANG BOYANG, TANG ZHONGLIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator PAN WENXIANG
WU YUANPING
YAN SHAOFA
BIAN PENGFEI
LIU YUANYUAN
ZHAO ZONGZHI
ZHANG BOYANG
TANG ZHONGLIANG
description The invention relates to a loop butting tunnel lining construction method which is used for performing a field operation of secondary tunnel lining concreting. The construction method is characterized in that at least two formwork groups and a formwork trolley are adopted; the formwork groups can be operated to be unfolded and folded by the formwork trolley; the unfolded formwork groups can be separated from the formwork trolley and stabilize in the tunnel to support prehardening concreting; the folded formwork groups can be carried by the formwork trolley to penetrate through the inner side of the unfolded formwork groups; and each formwork group can be in butt joint with one another on end surfaces. By means that a plurality of formwork groups are in butt joint circularly, circulating streamline operation of the formwork groups is operated, continuous concreting operation is realized in the field operation of secondary tunnel lining concreting, damages of concrete resulted from dislocation and squeeze cause
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN103114862A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN103114862A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN103114862A3</originalsourceid><addsrcrecordid>eNrjZNDzyc8vUEgqLSnJzEtXKCnNy0vNUcjJzAPxkvPzikuKSpNLMvPzFHJTSzLyU3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GBsaGhiYWZkaMxMWoALxUrAw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Loop butting tunnel lining construction method</title><source>esp@cenet</source><creator>PAN WENXIANG ; WU YUANPING ; YAN SHAOFA ; BIAN PENGFEI ; LIU YUANYUAN ; ZHAO ZONGZHI ; ZHANG BOYANG ; TANG ZHONGLIANG</creator><creatorcontrib>PAN WENXIANG ; WU YUANPING ; YAN SHAOFA ; BIAN PENGFEI ; LIU YUANYUAN ; ZHAO ZONGZHI ; ZHANG BOYANG ; TANG ZHONGLIANG</creatorcontrib><description>The invention relates to a loop butting tunnel lining construction method which is used for performing a field operation of secondary tunnel lining concreting. The construction method is characterized in that at least two formwork groups and a formwork trolley are adopted; the formwork groups can be operated to be unfolded and folded by the formwork trolley; the unfolded formwork groups can be separated from the formwork trolley and stabilize in the tunnel to support prehardening concreting; the folded formwork groups can be carried by the formwork trolley to penetrate through the inner side of the unfolded formwork groups; and each formwork group can be in butt joint with one another on end surfaces. By means that a plurality of formwork groups are in butt joint circularly, circulating streamline operation of the formwork groups is operated, continuous concreting operation is realized in the field operation of secondary tunnel lining concreting, damages of concrete resulted from dislocation and squeeze cause</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2013</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20130522&amp;DB=EPODOC&amp;CC=CN&amp;NR=103114862A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20130522&amp;DB=EPODOC&amp;CC=CN&amp;NR=103114862A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PAN WENXIANG</creatorcontrib><creatorcontrib>WU YUANPING</creatorcontrib><creatorcontrib>YAN SHAOFA</creatorcontrib><creatorcontrib>BIAN PENGFEI</creatorcontrib><creatorcontrib>LIU YUANYUAN</creatorcontrib><creatorcontrib>ZHAO ZONGZHI</creatorcontrib><creatorcontrib>ZHANG BOYANG</creatorcontrib><creatorcontrib>TANG ZHONGLIANG</creatorcontrib><title>Loop butting tunnel lining construction method</title><description>The invention relates to a loop butting tunnel lining construction method which is used for performing a field operation of secondary tunnel lining concreting. The construction method is characterized in that at least two formwork groups and a formwork trolley are adopted; the formwork groups can be operated to be unfolded and folded by the formwork trolley; the unfolded formwork groups can be separated from the formwork trolley and stabilize in the tunnel to support prehardening concreting; the folded formwork groups can be carried by the formwork trolley to penetrate through the inner side of the unfolded formwork groups; and each formwork group can be in butt joint with one another on end surfaces. By means that a plurality of formwork groups are in butt joint circularly, circulating streamline operation of the formwork groups is operated, continuous concreting operation is realized in the field operation of secondary tunnel lining concreting, damages of concrete resulted from dislocation and squeeze cause</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2013</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNDzyc8vUEgqLSnJzEtXKCnNy0vNUcjJzAPxkvPzikuKSpNLMvPzFHJTSzLyU3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GBsaGhiYWZkaMxMWoALxUrAw</recordid><startdate>20130522</startdate><enddate>20130522</enddate><creator>PAN WENXIANG</creator><creator>WU YUANPING</creator><creator>YAN SHAOFA</creator><creator>BIAN PENGFEI</creator><creator>LIU YUANYUAN</creator><creator>ZHAO ZONGZHI</creator><creator>ZHANG BOYANG</creator><creator>TANG ZHONGLIANG</creator><scope>EVB</scope></search><sort><creationdate>20130522</creationdate><title>Loop butting tunnel lining construction method</title><author>PAN WENXIANG ; WU YUANPING ; YAN SHAOFA ; BIAN PENGFEI ; LIU YUANYUAN ; ZHAO ZONGZHI ; ZHANG BOYANG ; TANG ZHONGLIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN103114862A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2013</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>PAN WENXIANG</creatorcontrib><creatorcontrib>WU YUANPING</creatorcontrib><creatorcontrib>YAN SHAOFA</creatorcontrib><creatorcontrib>BIAN PENGFEI</creatorcontrib><creatorcontrib>LIU YUANYUAN</creatorcontrib><creatorcontrib>ZHAO ZONGZHI</creatorcontrib><creatorcontrib>ZHANG BOYANG</creatorcontrib><creatorcontrib>TANG ZHONGLIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PAN WENXIANG</au><au>WU YUANPING</au><au>YAN SHAOFA</au><au>BIAN PENGFEI</au><au>LIU YUANYUAN</au><au>ZHAO ZONGZHI</au><au>ZHANG BOYANG</au><au>TANG ZHONGLIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Loop butting tunnel lining construction method</title><date>2013-05-22</date><risdate>2013</risdate><abstract>The invention relates to a loop butting tunnel lining construction method which is used for performing a field operation of secondary tunnel lining concreting. The construction method is characterized in that at least two formwork groups and a formwork trolley are adopted; the formwork groups can be operated to be unfolded and folded by the formwork trolley; the unfolded formwork groups can be separated from the formwork trolley and stabilize in the tunnel to support prehardening concreting; the folded formwork groups can be carried by the formwork trolley to penetrate through the inner side of the unfolded formwork groups; and each formwork group can be in butt joint with one another on end surfaces. By means that a plurality of formwork groups are in butt joint circularly, circulating streamline operation of the formwork groups is operated, continuous concreting operation is realized in the field operation of secondary tunnel lining concreting, damages of concrete resulted from dislocation and squeeze cause</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN103114862A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Loop butting tunnel lining construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T02%3A44%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PAN%20WENXIANG&rft.date=2013-05-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN103114862A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true