The invention discloses a construction method for a CRD (center cross diaphragm) inverted arch. The construction method comprises the following steps: 1), installing a temporary steel support; 2), breaking a center cross diaphragm near the temporary steel support; 3), constructing a bottom levelling...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DAI XINGMIN, DONG XIANSHUN, GUO BAOFEI, CHEN JIAN, WANG CHUNSHENG, GUO JIANGUO, XU XINGHUI, MA DONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DAI XINGMIN
DONG XIANSHUN
GUO BAOFEI
CHEN JIAN
WANG CHUNSHENG
GUO JIANGUO
XU XINGHUI
MA DONG
description The invention discloses a construction method for a CRD (center cross diaphragm) inverted arch. The construction method comprises the following steps: 1), installing a temporary steel support; 2), breaking a center cross diaphragm near the temporary steel support; 3), constructing a bottom levelling layer, a waterproof layer and a protective layer for the temporary steel support; 4), applying pre-stress; and 5), constructing the inverted arch: breaking the rest center cross diaphragm, constructing a levelling layer, a waterproof layer and a protective layer, applying reinforcement, mould boards and concrete, using concrete of the same grade to backfill the middle part of the concrete inverted arch, and simultaneously pouring 30cm-high concrete on the two side walls. The construction method has the advantages of reducing structural construction seams, avoiding frequent conversion between processes, achieving strong structural integrity, completely sealing the waterproof layer and effectively controlling land s
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN102758638A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN102758638A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN102758638A3</originalsourceid><addsrcrecordid>eNrjZHByzs8rLikqTS7JzM9TyE0tychPUUjLL1JwDnJR0EhOzStJLVJILsovLlZIyUwsyChKTM_VVMjMK0stKklNUUgsSs7gYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJQFNSS-Kd_QwNjMxNLcyMLRyNiVEDAAQHMY0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for CRD (center cross diaphragm) inverted arch</title><source>esp@cenet</source><creator>DAI XINGMIN ; DONG XIANSHUN ; GUO BAOFEI ; CHEN JIAN ; WANG CHUNSHENG ; GUO JIANGUO ; XU XINGHUI ; MA DONG</creator><creatorcontrib>DAI XINGMIN ; DONG XIANSHUN ; GUO BAOFEI ; CHEN JIAN ; WANG CHUNSHENG ; GUO JIANGUO ; XU XINGHUI ; MA DONG</creatorcontrib><description>The invention discloses a construction method for a CRD (center cross diaphragm) inverted arch. The construction method comprises the following steps: 1), installing a temporary steel support; 2), breaking a center cross diaphragm near the temporary steel support; 3), constructing a bottom levelling layer, a waterproof layer and a protective layer for the temporary steel support; 4), applying pre-stress; and 5), constructing the inverted arch: breaking the rest center cross diaphragm, constructing a levelling layer, a waterproof layer and a protective layer, applying reinforcement, mould boards and concrete, using concrete of the same grade to backfill the middle part of the concrete inverted arch, and simultaneously pouring 30cm-high concrete on the two side walls. The construction method has the advantages of reducing structural construction seams, avoiding frequent conversion between processes, achieving strong structural integrity, completely sealing the waterproof layer and effectively controlling land s</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20121031&amp;DB=EPODOC&amp;CC=CN&amp;NR=102758638A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20121031&amp;DB=EPODOC&amp;CC=CN&amp;NR=102758638A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DAI XINGMIN</creatorcontrib><creatorcontrib>DONG XIANSHUN</creatorcontrib><creatorcontrib>GUO BAOFEI</creatorcontrib><creatorcontrib>CHEN JIAN</creatorcontrib><creatorcontrib>WANG CHUNSHENG</creatorcontrib><creatorcontrib>GUO JIANGUO</creatorcontrib><creatorcontrib>XU XINGHUI</creatorcontrib><creatorcontrib>MA DONG</creatorcontrib><title>Construction method for CRD (center cross diaphragm) inverted arch</title><description>The invention discloses a construction method for a CRD (center cross diaphragm) inverted arch. The construction method comprises the following steps: 1), installing a temporary steel support; 2), breaking a center cross diaphragm near the temporary steel support; 3), constructing a bottom levelling layer, a waterproof layer and a protective layer for the temporary steel support; 4), applying pre-stress; and 5), constructing the inverted arch: breaking the rest center cross diaphragm, constructing a levelling layer, a waterproof layer and a protective layer, applying reinforcement, mould boards and concrete, using concrete of the same grade to backfill the middle part of the concrete inverted arch, and simultaneously pouring 30cm-high concrete on the two side walls. The construction method has the advantages of reducing structural construction seams, avoiding frequent conversion between processes, achieving strong structural integrity, completely sealing the waterproof layer and effectively controlling land s</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHByzs8rLikqTS7JzM9TyE0tychPUUjLL1JwDnJR0EhOzStJLVJILsovLlZIyUwsyChKTM_VVMjMK0stKklNUUgsSs7gYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJQFNSS-Kd_QwNjMxNLcyMLRyNiVEDAAQHMY0</recordid><startdate>20121031</startdate><enddate>20121031</enddate><creator>DAI XINGMIN</creator><creator>DONG XIANSHUN</creator><creator>GUO BAOFEI</creator><creator>CHEN JIAN</creator><creator>WANG CHUNSHENG</creator><creator>GUO JIANGUO</creator><creator>XU XINGHUI</creator><creator>MA DONG</creator><scope>EVB</scope></search><sort><creationdate>20121031</creationdate><title>Construction method for CRD (center cross diaphragm) inverted arch</title><author>DAI XINGMIN ; DONG XIANSHUN ; GUO BAOFEI ; CHEN JIAN ; WANG CHUNSHENG ; GUO JIANGUO ; XU XINGHUI ; MA DONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN102758638A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2012</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DAI XINGMIN</creatorcontrib><creatorcontrib>DONG XIANSHUN</creatorcontrib><creatorcontrib>GUO BAOFEI</creatorcontrib><creatorcontrib>CHEN JIAN</creatorcontrib><creatorcontrib>WANG CHUNSHENG</creatorcontrib><creatorcontrib>GUO JIANGUO</creatorcontrib><creatorcontrib>XU XINGHUI</creatorcontrib><creatorcontrib>MA DONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DAI XINGMIN</au><au>DONG XIANSHUN</au><au>GUO BAOFEI</au><au>CHEN JIAN</au><au>WANG CHUNSHENG</au><au>GUO JIANGUO</au><au>XU XINGHUI</au><au>MA DONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for CRD (center cross diaphragm) inverted arch</title><date>2012-10-31</date><risdate>2012</risdate><abstract>The invention discloses a construction method for a CRD (center cross diaphragm) inverted arch. The construction method comprises the following steps: 1), installing a temporary steel support; 2), breaking a center cross diaphragm near the temporary steel support; 3), constructing a bottom levelling layer, a waterproof layer and a protective layer for the temporary steel support; 4), applying pre-stress; and 5), constructing the inverted arch: breaking the rest center cross diaphragm, constructing a levelling layer, a waterproof layer and a protective layer, applying reinforcement, mould boards and concrete, using concrete of the same grade to backfill the middle part of the concrete inverted arch, and simultaneously pouring 30cm-high concrete on the two side walls. The construction method has the advantages of reducing structural construction seams, avoiding frequent conversion between processes, achieving strong structural integrity, completely sealing the waterproof layer and effectively controlling land s</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN102758638A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Construction method for CRD (center cross diaphragm) inverted arch
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T22%3A16%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DAI%20XINGMIN&rft.date=2012-10-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN102758638A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true