Heavy battened steel column construction process
The invention discloses a heavy battened steel column mounting construction process. The mounting construction process comprises the following steps of: A) detecting foundation dimension of a cup opening and adjusting a dimension error; B) snapping a line on the foundation and correcting elevation;...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHENG ZHUYUAN ZHU LISHA CHANG HONGXIA RONG LEMING CUI YAN HAN QIAN LI NA |
description | The invention discloses a heavy battened steel column mounting construction process. The mounting construction process comprises the following steps of: A) detecting foundation dimension of a cup opening and adjusting a dimension error; B) snapping a line on the foundation and correcting elevation; C) measuring the distance from a bracket surface to the lower surface of a column bottom plate; D) lifting a heavy battened steel column; E) adjusting a column foot center line relative to a locating axis; F) adjusting the verticality of an axis of the heavy battened steel column; and G) fixing the heavy battened steel column. According to the invention, the heavy battened steel column correcting process is improved so that the working efficiency is largely enhanced and the labor intensity is reduced; and compared with the traditional correcting method, the heavy battened steel column mounting construction process disclosed by the invention has the advantages of short time in the adjusting process, capability of re |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN102434003A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN102434003A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN102434003A3</originalsourceid><addsrcrecordid>eNrjZDDwSE0sq1RISiwpSc1LTVEoLklNzVFIzs8pzc0DUnnFJUWlySWZ-XkKBUX5yanFxTwMrGmJOcWpvFCam0HRzTXE2UM3tSA_PrW4IDEZaE5JvLOfoYGRibGJgYGxozExagCQSSuy</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Heavy battened steel column construction process</title><source>esp@cenet</source><creator>CHENG ZHUYUAN ; ZHU LISHA ; CHANG HONGXIA ; RONG LEMING ; CUI YAN ; HAN QIAN ; LI NA</creator><creatorcontrib>CHENG ZHUYUAN ; ZHU LISHA ; CHANG HONGXIA ; RONG LEMING ; CUI YAN ; HAN QIAN ; LI NA</creatorcontrib><description>The invention discloses a heavy battened steel column mounting construction process. The mounting construction process comprises the following steps of: A) detecting foundation dimension of a cup opening and adjusting a dimension error; B) snapping a line on the foundation and correcting elevation; C) measuring the distance from a bracket surface to the lower surface of a column bottom plate; D) lifting a heavy battened steel column; E) adjusting a column foot center line relative to a locating axis; F) adjusting the verticality of an axis of the heavy battened steel column; and G) fixing the heavy battened steel column. According to the invention, the heavy battened steel column correcting process is improved so that the working efficiency is largely enhanced and the labor intensity is reduced; and compared with the traditional correcting method, the heavy battened steel column mounting construction process disclosed by the invention has the advantages of short time in the adjusting process, capability of re</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120502&DB=EPODOC&CC=CN&NR=102434003A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120502&DB=EPODOC&CC=CN&NR=102434003A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHENG ZHUYUAN</creatorcontrib><creatorcontrib>ZHU LISHA</creatorcontrib><creatorcontrib>CHANG HONGXIA</creatorcontrib><creatorcontrib>RONG LEMING</creatorcontrib><creatorcontrib>CUI YAN</creatorcontrib><creatorcontrib>HAN QIAN</creatorcontrib><creatorcontrib>LI NA</creatorcontrib><title>Heavy battened steel column construction process</title><description>The invention discloses a heavy battened steel column mounting construction process. The mounting construction process comprises the following steps of: A) detecting foundation dimension of a cup opening and adjusting a dimension error; B) snapping a line on the foundation and correcting elevation; C) measuring the distance from a bracket surface to the lower surface of a column bottom plate; D) lifting a heavy battened steel column; E) adjusting a column foot center line relative to a locating axis; F) adjusting the verticality of an axis of the heavy battened steel column; and G) fixing the heavy battened steel column. According to the invention, the heavy battened steel column correcting process is improved so that the working efficiency is largely enhanced and the labor intensity is reduced; and compared with the traditional correcting method, the heavy battened steel column mounting construction process disclosed by the invention has the advantages of short time in the adjusting process, capability of re</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDDwSE0sq1RISiwpSc1LTVEoLklNzVFIzs8pzc0DUnnFJUWlySWZ-XkKBUX5yanFxTwMrGmJOcWpvFCam0HRzTXE2UM3tSA_PrW4IDEZaE5JvLOfoYGRibGJgYGxozExagCQSSuy</recordid><startdate>20120502</startdate><enddate>20120502</enddate><creator>CHENG ZHUYUAN</creator><creator>ZHU LISHA</creator><creator>CHANG HONGXIA</creator><creator>RONG LEMING</creator><creator>CUI YAN</creator><creator>HAN QIAN</creator><creator>LI NA</creator><scope>EVB</scope></search><sort><creationdate>20120502</creationdate><title>Heavy battened steel column construction process</title><author>CHENG ZHUYUAN ; ZHU LISHA ; CHANG HONGXIA ; RONG LEMING ; CUI YAN ; HAN QIAN ; LI NA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN102434003A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2012</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>CHENG ZHUYUAN</creatorcontrib><creatorcontrib>ZHU LISHA</creatorcontrib><creatorcontrib>CHANG HONGXIA</creatorcontrib><creatorcontrib>RONG LEMING</creatorcontrib><creatorcontrib>CUI YAN</creatorcontrib><creatorcontrib>HAN QIAN</creatorcontrib><creatorcontrib>LI NA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHENG ZHUYUAN</au><au>ZHU LISHA</au><au>CHANG HONGXIA</au><au>RONG LEMING</au><au>CUI YAN</au><au>HAN QIAN</au><au>LI NA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Heavy battened steel column construction process</title><date>2012-05-02</date><risdate>2012</risdate><abstract>The invention discloses a heavy battened steel column mounting construction process. The mounting construction process comprises the following steps of: A) detecting foundation dimension of a cup opening and adjusting a dimension error; B) snapping a line on the foundation and correcting elevation; C) measuring the distance from a bracket surface to the lower surface of a column bottom plate; D) lifting a heavy battened steel column; E) adjusting a column foot center line relative to a locating axis; F) adjusting the verticality of an axis of the heavy battened steel column; and G) fixing the heavy battened steel column. According to the invention, the heavy battened steel column correcting process is improved so that the working efficiency is largely enhanced and the labor intensity is reduced; and compared with the traditional correcting method, the heavy battened steel column mounting construction process disclosed by the invention has the advantages of short time in the adjusting process, capability of re</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN102434003A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Heavy battened steel column construction process |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T06%3A46%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHENG%20ZHUYUAN&rft.date=2012-05-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN102434003A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |