Construction method of trestle steel pipe pile foundation

The invention discloses a construction method of a trestle steel pipe pile foundation. The construction method is used for performing anchoring construction for the trestle steel pipe pile foundation on a slope bare rock surface and a shallow covered slope rock surface of the river, lake or ocean. T...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU XIANGJU, JIN HONGYAN, WANG XIANGQIAO, YE SHAOQI, CHEN CHANGBAI, PENG JIANPING, FAN WANXIANG, GUAN JUN, JIN YUANJING, ZHAO ZEFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHU XIANGJU
JIN HONGYAN
WANG XIANGQIAO
YE SHAOQI
CHEN CHANGBAI
PENG JIANPING
FAN WANXIANG
GUAN JUN
JIN YUANJING
ZHAO ZEFENG
description The invention discloses a construction method of a trestle steel pipe pile foundation. The construction method is used for performing anchoring construction for the trestle steel pipe pile foundation on a slope bare rock surface and a shallow covered slope rock surface of the river, lake or ocean. The construction method comprises the following steps: A10) after utilizing an anchoring system to accurately position a floating pilot hole platform, respectively guiding each trestle steel pipe pile to fall onto a river bed rock surface but not perform a rock anchoring, through each reserved hole position on the floating pilot hole platform; A20) after impacting a hole to a designed depth on a foundational bed rock surface in the trestle steel pipe pile by using an impacting drill with the diameter less than the inner diameter of the trestle steel pipe pile, vibrating the trestle steel pipe pile so as to guide the trestle steel pipe pile to sink to the bottom of the hole, pouring reinforced concrete and firmly con
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN102312442A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN102312442A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN102312442A3</originalsourceid><addsrcrecordid>eNrjZLB0zs8rLikqTS7JzM9TyE0tychPUchPUygpSi0uyUlVKC5JTc1RKMgsSAUSQH5afmleSiJIMQ8Da1piTnEqL5TmZlB0cw1x9tBNLciPTy0uSExOzUstiXf2MzQwMjY0MjExcjQmRg0AcHAu9g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of trestle steel pipe pile foundation</title><source>esp@cenet</source><creator>ZHU XIANGJU ; JIN HONGYAN ; WANG XIANGQIAO ; YE SHAOQI ; CHEN CHANGBAI ; PENG JIANPING ; FAN WANXIANG ; GUAN JUN ; JIN YUANJING ; ZHAO ZEFENG</creator><creatorcontrib>ZHU XIANGJU ; JIN HONGYAN ; WANG XIANGQIAO ; YE SHAOQI ; CHEN CHANGBAI ; PENG JIANPING ; FAN WANXIANG ; GUAN JUN ; JIN YUANJING ; ZHAO ZEFENG</creatorcontrib><description>The invention discloses a construction method of a trestle steel pipe pile foundation. The construction method is used for performing anchoring construction for the trestle steel pipe pile foundation on a slope bare rock surface and a shallow covered slope rock surface of the river, lake or ocean. The construction method comprises the following steps: A10) after utilizing an anchoring system to accurately position a floating pilot hole platform, respectively guiding each trestle steel pipe pile to fall onto a river bed rock surface but not perform a rock anchoring, through each reserved hole position on the floating pilot hole platform; A20) after impacting a hole to a designed depth on a foundational bed rock surface in the trestle steel pipe pile by using an impacting drill with the diameter less than the inner diameter of the trestle steel pipe pile, vibrating the trestle steel pipe pile so as to guide the trestle steel pipe pile to sink to the bottom of the hole, pouring reinforced concrete and firmly con</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20120111&amp;DB=EPODOC&amp;CC=CN&amp;NR=102312442A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76419</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20120111&amp;DB=EPODOC&amp;CC=CN&amp;NR=102312442A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHU XIANGJU</creatorcontrib><creatorcontrib>JIN HONGYAN</creatorcontrib><creatorcontrib>WANG XIANGQIAO</creatorcontrib><creatorcontrib>YE SHAOQI</creatorcontrib><creatorcontrib>CHEN CHANGBAI</creatorcontrib><creatorcontrib>PENG JIANPING</creatorcontrib><creatorcontrib>FAN WANXIANG</creatorcontrib><creatorcontrib>GUAN JUN</creatorcontrib><creatorcontrib>JIN YUANJING</creatorcontrib><creatorcontrib>ZHAO ZEFENG</creatorcontrib><title>Construction method of trestle steel pipe pile foundation</title><description>The invention discloses a construction method of a trestle steel pipe pile foundation. The construction method is used for performing anchoring construction for the trestle steel pipe pile foundation on a slope bare rock surface and a shallow covered slope rock surface of the river, lake or ocean. The construction method comprises the following steps: A10) after utilizing an anchoring system to accurately position a floating pilot hole platform, respectively guiding each trestle steel pipe pile to fall onto a river bed rock surface but not perform a rock anchoring, through each reserved hole position on the floating pilot hole platform; A20) after impacting a hole to a designed depth on a foundational bed rock surface in the trestle steel pipe pile by using an impacting drill with the diameter less than the inner diameter of the trestle steel pipe pile, vibrating the trestle steel pipe pile so as to guide the trestle steel pipe pile to sink to the bottom of the hole, pouring reinforced concrete and firmly con</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0zs8rLikqTS7JzM9TyE0tychPUchPUygpSi0uyUlVKC5JTc1RKMgsSAUSQH5afmleSiJIMQ8Da1piTnEqL5TmZlB0cw1x9tBNLciPTy0uSExOzUstiXf2MzQwMjY0MjExcjQmRg0AcHAu9g</recordid><startdate>20120111</startdate><enddate>20120111</enddate><creator>ZHU XIANGJU</creator><creator>JIN HONGYAN</creator><creator>WANG XIANGQIAO</creator><creator>YE SHAOQI</creator><creator>CHEN CHANGBAI</creator><creator>PENG JIANPING</creator><creator>FAN WANXIANG</creator><creator>GUAN JUN</creator><creator>JIN YUANJING</creator><creator>ZHAO ZEFENG</creator><scope>EVB</scope></search><sort><creationdate>20120111</creationdate><title>Construction method of trestle steel pipe pile foundation</title><author>ZHU XIANGJU ; JIN HONGYAN ; WANG XIANGQIAO ; YE SHAOQI ; CHEN CHANGBAI ; PENG JIANPING ; FAN WANXIANG ; GUAN JUN ; JIN YUANJING ; ZHAO ZEFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN102312442A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2012</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHU XIANGJU</creatorcontrib><creatorcontrib>JIN HONGYAN</creatorcontrib><creatorcontrib>WANG XIANGQIAO</creatorcontrib><creatorcontrib>YE SHAOQI</creatorcontrib><creatorcontrib>CHEN CHANGBAI</creatorcontrib><creatorcontrib>PENG JIANPING</creatorcontrib><creatorcontrib>FAN WANXIANG</creatorcontrib><creatorcontrib>GUAN JUN</creatorcontrib><creatorcontrib>JIN YUANJING</creatorcontrib><creatorcontrib>ZHAO ZEFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHU XIANGJU</au><au>JIN HONGYAN</au><au>WANG XIANGQIAO</au><au>YE SHAOQI</au><au>CHEN CHANGBAI</au><au>PENG JIANPING</au><au>FAN WANXIANG</au><au>GUAN JUN</au><au>JIN YUANJING</au><au>ZHAO ZEFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of trestle steel pipe pile foundation</title><date>2012-01-11</date><risdate>2012</risdate><abstract>The invention discloses a construction method of a trestle steel pipe pile foundation. The construction method is used for performing anchoring construction for the trestle steel pipe pile foundation on a slope bare rock surface and a shallow covered slope rock surface of the river, lake or ocean. The construction method comprises the following steps: A10) after utilizing an anchoring system to accurately position a floating pilot hole platform, respectively guiding each trestle steel pipe pile to fall onto a river bed rock surface but not perform a rock anchoring, through each reserved hole position on the floating pilot hole platform; A20) after impacting a hole to a designed depth on a foundational bed rock surface in the trestle steel pipe pile by using an impacting drill with the diameter less than the inner diameter of the trestle steel pipe pile, vibrating the trestle steel pipe pile so as to guide the trestle steel pipe pile to sink to the bottom of the hole, pouring reinforced concrete and firmly con</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN102312442A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method of trestle steel pipe pile foundation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T21%3A19%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHU%20XIANGJU&rft.date=2012-01-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN102312442A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true