Extra-large area concrete construction method
The invention discloses an extra-large area concrete construction method, which comprises: computing a temperature stress by a finite-element analysis process; arranging stress bars according to the result of the computation of the temperature stress and design requirements; and tensioning the stres...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | FANG SIZHONG ZHANG XUNSHENG HUANG QIQUAN TANG JIYU GE XIANGLIN ZHAO LEI FAN BO |
description | The invention discloses an extra-large area concrete construction method, which comprises: computing a temperature stress by a finite-element analysis process; arranging stress bars according to the result of the computation of the temperature stress and design requirements; and tensioning the stress bars. By arranging the prestress bars and generating the prepressing stress in reinforced concrete, air shrinkage generated in the hardening of concrete and tensile stress generated in hydration heat contraction are counteracted basically, so the cracking of concrete are relieved and prevented. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN101979802A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN101979802A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN101979802A3</originalsourceid><addsrcrecordid>eNrjZNB1rSgpStTNSSxKT1VILEpNVEjOz0suSi1JBTGKS4pKk0sy8_MUclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoYGhpbmlhYGRozExagDczipy</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Extra-large area concrete construction method</title><source>esp@cenet</source><creator>FANG SIZHONG ; ZHANG XUNSHENG ; HUANG QIQUAN ; TANG JIYU ; GE XIANGLIN ; ZHAO LEI ; FAN BO</creator><creatorcontrib>FANG SIZHONG ; ZHANG XUNSHENG ; HUANG QIQUAN ; TANG JIYU ; GE XIANGLIN ; ZHAO LEI ; FAN BO</creatorcontrib><description>The invention discloses an extra-large area concrete construction method, which comprises: computing a temperature stress by a finite-element analysis process; arranging stress bars according to the result of the computation of the temperature stress and design requirements; and tensioning the stress bars. By arranging the prestress bars and generating the prepressing stress in reinforced concrete, air shrinkage generated in the hardening of concrete and tensile stress generated in hydration heat contraction are counteracted basically, so the cracking of concrete are relieved and prevented.</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDING MATERIALS ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; STRUCTURAL ELEMENTS ; WALLS, e.g. PARTITIONS</subject><creationdate>2011</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110223&DB=EPODOC&CC=CN&NR=101979802A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110223&DB=EPODOC&CC=CN&NR=101979802A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FANG SIZHONG</creatorcontrib><creatorcontrib>ZHANG XUNSHENG</creatorcontrib><creatorcontrib>HUANG QIQUAN</creatorcontrib><creatorcontrib>TANG JIYU</creatorcontrib><creatorcontrib>GE XIANGLIN</creatorcontrib><creatorcontrib>ZHAO LEI</creatorcontrib><creatorcontrib>FAN BO</creatorcontrib><title>Extra-large area concrete construction method</title><description>The invention discloses an extra-large area concrete construction method, which comprises: computing a temperature stress by a finite-element analysis process; arranging stress bars according to the result of the computation of the temperature stress and design requirements; and tensioning the stress bars. By arranging the prestress bars and generating the prepressing stress in reinforced concrete, air shrinkage generated in the hardening of concrete and tensile stress generated in hydration heat contraction are counteracted basically, so the cracking of concrete are relieved and prevented.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDING MATERIALS</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>STRUCTURAL ELEMENTS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2011</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNB1rSgpStTNSSxKT1VILEpNVEjOz0suSi1JBTGKS4pKk0sy8_MUclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoYGhpbmlhYGRozExagDczipy</recordid><startdate>20110223</startdate><enddate>20110223</enddate><creator>FANG SIZHONG</creator><creator>ZHANG XUNSHENG</creator><creator>HUANG QIQUAN</creator><creator>TANG JIYU</creator><creator>GE XIANGLIN</creator><creator>ZHAO LEI</creator><creator>FAN BO</creator><scope>EVB</scope></search><sort><creationdate>20110223</creationdate><title>Extra-large area concrete construction method</title><author>FANG SIZHONG ; ZHANG XUNSHENG ; HUANG QIQUAN ; TANG JIYU ; GE XIANGLIN ; ZHAO LEI ; FAN BO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN101979802A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2011</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDING MATERIALS</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>STRUCTURAL ELEMENTS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>FANG SIZHONG</creatorcontrib><creatorcontrib>ZHANG XUNSHENG</creatorcontrib><creatorcontrib>HUANG QIQUAN</creatorcontrib><creatorcontrib>TANG JIYU</creatorcontrib><creatorcontrib>GE XIANGLIN</creatorcontrib><creatorcontrib>ZHAO LEI</creatorcontrib><creatorcontrib>FAN BO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FANG SIZHONG</au><au>ZHANG XUNSHENG</au><au>HUANG QIQUAN</au><au>TANG JIYU</au><au>GE XIANGLIN</au><au>ZHAO LEI</au><au>FAN BO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Extra-large area concrete construction method</title><date>2011-02-23</date><risdate>2011</risdate><abstract>The invention discloses an extra-large area concrete construction method, which comprises: computing a temperature stress by a finite-element analysis process; arranging stress bars according to the result of the computation of the temperature stress and design requirements; and tensioning the stress bars. By arranging the prestress bars and generating the prepressing stress in reinforced concrete, air shrinkage generated in the hardening of concrete and tensile stress generated in hydration heat contraction are counteracted basically, so the cracking of concrete are relieved and prevented.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN101979802A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE BUILDING MATERIALS CEILINGS FIXED CONSTRUCTIONS FLOORS FORMS GENERAL BUILDING CONSTRUCTIONS HANDLING BUILDING MATERIALS ON THE SITE INSULATION OR OTHER PROTECTION OF BUILDINGS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ROOFS SCAFFOLDING SHUTTERING STRUCTURAL ELEMENTS WALLS, e.g. PARTITIONS |
title | Extra-large area concrete construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T07%3A26%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FANG%20SIZHONG&rft.date=2011-02-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN101979802A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |