Forced ramming construction method for high slope filling with Xigeda soil

The invention discloses a forced ramming construction method, and in particular relates to a forced ramming construction method for filling foundation soil with Xigeda soil in a high slope area. In the method, the Xigeda soil is backfilled to a high slope zone of which the gradient is no less than 1...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG HANWEI, XIE BIN, LI RENFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!