Electrical control system of crane of nuclear power plant
The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical diffic...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WU JIANHUA JI MENGLAN LIU HUANJIANG |
description | The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN101723251BB</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN101723251BB</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN101723251BB3</originalsourceid><addsrcrecordid>eNrjZLB0zUlNLinKTE7MUUjOzyspys9RKK4sLknNVchPU0guSsxLBTHySpNzUhOLFAryy1OBZE5iXgkPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYl39jM0MDQ3MjYyNXRyMiZKEQCd1S8b</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Electrical control system of crane of nuclear power plant</title><source>esp@cenet</source><creator>WU JIANHUA ; JI MENGLAN ; LIU HUANJIANG</creator><creatorcontrib>WU JIANHUA ; JI MENGLAN ; LIU HUANJIANG</creatorcontrib><description>The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120523&DB=EPODOC&CC=CN&NR=101723251B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120523&DB=EPODOC&CC=CN&NR=101723251B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU JIANHUA</creatorcontrib><creatorcontrib>JI MENGLAN</creatorcontrib><creatorcontrib>LIU HUANJIANG</creatorcontrib><title>Electrical control system of crane of nuclear power plant</title><description>The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0zUlNLinKTE7MUUjOzyspys9RKK4sLknNVchPU0guSsxLBTHySpNzUhOLFAryy1OBZE5iXgkPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYl39jM0MDQ3MjYyNXRyMiZKEQCd1S8b</recordid><startdate>20120523</startdate><enddate>20120523</enddate><creator>WU JIANHUA</creator><creator>JI MENGLAN</creator><creator>LIU HUANJIANG</creator><scope>EVB</scope></search><sort><creationdate>20120523</creationdate><title>Electrical control system of crane of nuclear power plant</title><author>WU JIANHUA ; JI MENGLAN ; LIU HUANJIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN101723251BB3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2012</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>WU JIANHUA</creatorcontrib><creatorcontrib>JI MENGLAN</creatorcontrib><creatorcontrib>LIU HUANJIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU JIANHUA</au><au>JI MENGLAN</au><au>LIU HUANJIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Electrical control system of crane of nuclear power plant</title><date>2012-05-23</date><risdate>2012</risdate><abstract>The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN101723251BB |
source | esp@cenet |
subjects | CRANES HAULING HOISTING LIFTING LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES PERFORMING OPERATIONS TRANSPORTING |
title | Electrical control system of crane of nuclear power plant |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-23T00%3A23%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20JIANHUA&rft.date=2012-05-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN101723251BB%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |