Electrical control system of crane of nuclear power plant

The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical diffic...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WU JIANHUA, JI MENGLAN, LIU HUANJIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WU JIANHUA
JI MENGLAN
LIU HUANJIANG
description The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN101723251BB</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN101723251BB</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN101723251BB3</originalsourceid><addsrcrecordid>eNrjZLB0zUlNLinKTE7MUUjOzyspys9RKK4sLknNVchPU0guSsxLBTHySpNzUhOLFAryy1OBZE5iXgkPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYl39jM0MDQ3MjYyNXRyMiZKEQCd1S8b</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Electrical control system of crane of nuclear power plant</title><source>esp@cenet</source><creator>WU JIANHUA ; JI MENGLAN ; LIU HUANJIANG</creator><creatorcontrib>WU JIANHUA ; JI MENGLAN ; LIU HUANJIANG</creatorcontrib><description>The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi</description><language>chi ; eng</language><subject>CRANES ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20120523&amp;DB=EPODOC&amp;CC=CN&amp;NR=101723251B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20120523&amp;DB=EPODOC&amp;CC=CN&amp;NR=101723251B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU JIANHUA</creatorcontrib><creatorcontrib>JI MENGLAN</creatorcontrib><creatorcontrib>LIU HUANJIANG</creatorcontrib><title>Electrical control system of crane of nuclear power plant</title><description>The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi</description><subject>CRANES</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0zUlNLinKTE7MUUjOzyspys9RKK4sLknNVchPU0guSsxLBTHySpNzUhOLFAryy1OBZE5iXgkPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYl39jM0MDQ3MjYyNXRyMiZKEQCd1S8b</recordid><startdate>20120523</startdate><enddate>20120523</enddate><creator>WU JIANHUA</creator><creator>JI MENGLAN</creator><creator>LIU HUANJIANG</creator><scope>EVB</scope></search><sort><creationdate>20120523</creationdate><title>Electrical control system of crane of nuclear power plant</title><author>WU JIANHUA ; JI MENGLAN ; LIU HUANJIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN101723251BB3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2012</creationdate><topic>CRANES</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>WU JIANHUA</creatorcontrib><creatorcontrib>JI MENGLAN</creatorcontrib><creatorcontrib>LIU HUANJIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU JIANHUA</au><au>JI MENGLAN</au><au>LIU HUANJIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Electrical control system of crane of nuclear power plant</title><date>2012-05-23</date><risdate>2012</risdate><abstract>The invention relates to an electrical control system of a crane of a nuclear power plant, belonging to an electrical control device for a polar crane in a nuclear power plant which can satisfy signal failure demand, is non-redundant and has two PLCs. The invention mainly solves the technical difficulties of no satisfaction of signal failure demand and easy initiation of nuclear safety accidents.The technical scheme adopted by the invention is as follows: the electrical control system of the crane of the nuclear power plant comprises an operation control device, a monitoring device, two industrial computers, a main lifting motor speed detecting device and a main lifting safety brake, a master station 1 operating a programmable logic controller, and a master station 2 monitoring the programmable logic controller, wherein the master station 1 is in flexible connection with the master station 2 through a DP/DP coupler and exchange data with each other, and compares the repeated measurement data of the major posi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN101723251BB
source esp@cenet
subjects CRANES
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
PERFORMING OPERATIONS
TRANSPORTING
title Electrical control system of crane of nuclear power plant
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-23T00%3A23%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20JIANHUA&rft.date=2012-05-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN101723251BB%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true