Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby

The invention relates to a pier hydraulic leveling inner-climbing climbing form and a concrete pouring method thereby. The form consists of a slip form truss, a form system, an operating platform, a hydraulic lifting system and an accuracy control system, wherein two slip form truss girders are cros...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HUANG YANJI, HUANG ZHONGLIANG, DENG CHAOLIANG, PANG LIPING, WEI JIANJU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HUANG YANJI
HUANG ZHONGLIANG
DENG CHAOLIANG
PANG LIPING
WEI JIANJU
description The invention relates to a pier hydraulic leveling inner-climbing climbing form and a concrete pouring method thereby. The form consists of a slip form truss, a form system, an operating platform, a hydraulic lifting system and an accuracy control system, wherein two slip form truss girders are crosswise arranged, both ends of the two slip form truss girders are respectively connected with lifting frames, a wreath is in a quadrate or an elliptical shape and is fixed to the lifting frames, a quadrate or an elliptical form is hung and fastened on the wreath, the operating platform is divided into an upper layer and a lower layer which are both fixedly connected with the lifting frames, a hydraulic console is placed on the operating platform and a jack is installed on a crossbeam. The jack is controlled by the hydraulic console to lead the crossbeam to rise, the lifting frames are driven to upwards climb simultaneously with the wreath and the form which are connected with the lifting frames, and the concrete is
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN101525873BB</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN101525873BB</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN101525873BB3</originalsourceid><addsrcrecordid>eNqNij0LwjAURbM4iPofHu4Fayk6tyhO4uDgVtL0tgnki9dU6L-Xgjg73XM4dy1eDwMmPXcsJ2sUWbxhjR_IeA_OlDWuXfQHfWBH0nekgleMBIph4qU4JB06ShqMdt6KVS_tiN13N2J_vTzrW4YYGoxRKnikpr7nh7w8ludTUVXFX6cPRhk7Nw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby</title><source>esp@cenet</source><creator>HUANG YANJI ; HUANG ZHONGLIANG ; DENG CHAOLIANG ; PANG LIPING ; WEI JIANJU</creator><creatorcontrib>HUANG YANJI ; HUANG ZHONGLIANG ; DENG CHAOLIANG ; PANG LIPING ; WEI JIANJU</creatorcontrib><description>The invention relates to a pier hydraulic leveling inner-climbing climbing form and a concrete pouring method thereby. The form consists of a slip form truss, a form system, an operating platform, a hydraulic lifting system and an accuracy control system, wherein two slip form truss girders are crosswise arranged, both ends of the two slip form truss girders are respectively connected with lifting frames, a wreath is in a quadrate or an elliptical shape and is fixed to the lifting frames, a quadrate or an elliptical form is hung and fastened on the wreath, the operating platform is divided into an upper layer and a lower layer which are both fixedly connected with the lifting frames, a hydraulic console is placed on the operating platform and a jack is installed on a crossbeam. The jack is controlled by the hydraulic console to lead the crossbeam to rise, the lifting frames are driven to upwards climb simultaneously with the wreath and the form which are connected with the lifting frames, and the concrete is</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2011</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20110727&amp;DB=EPODOC&amp;CC=CN&amp;NR=101525873B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20110727&amp;DB=EPODOC&amp;CC=CN&amp;NR=101525873B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HUANG YANJI</creatorcontrib><creatorcontrib>HUANG ZHONGLIANG</creatorcontrib><creatorcontrib>DENG CHAOLIANG</creatorcontrib><creatorcontrib>PANG LIPING</creatorcontrib><creatorcontrib>WEI JIANJU</creatorcontrib><title>Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby</title><description>The invention relates to a pier hydraulic leveling inner-climbing climbing form and a concrete pouring method thereby. The form consists of a slip form truss, a form system, an operating platform, a hydraulic lifting system and an accuracy control system, wherein two slip form truss girders are crosswise arranged, both ends of the two slip form truss girders are respectively connected with lifting frames, a wreath is in a quadrate or an elliptical shape and is fixed to the lifting frames, a quadrate or an elliptical form is hung and fastened on the wreath, the operating platform is divided into an upper layer and a lower layer which are both fixedly connected with the lifting frames, a hydraulic console is placed on the operating platform and a jack is installed on a crossbeam. The jack is controlled by the hydraulic console to lead the crossbeam to rise, the lifting frames are driven to upwards climb simultaneously with the wreath and the form which are connected with the lifting frames, and the concrete is</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2011</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNij0LwjAURbM4iPofHu4Fayk6tyhO4uDgVtL0tgnki9dU6L-Xgjg73XM4dy1eDwMmPXcsJ2sUWbxhjR_IeA_OlDWuXfQHfWBH0nekgleMBIph4qU4JB06ShqMdt6KVS_tiN13N2J_vTzrW4YYGoxRKnikpr7nh7w8ludTUVXFX6cPRhk7Nw</recordid><startdate>20110727</startdate><enddate>20110727</enddate><creator>HUANG YANJI</creator><creator>HUANG ZHONGLIANG</creator><creator>DENG CHAOLIANG</creator><creator>PANG LIPING</creator><creator>WEI JIANJU</creator><scope>EVB</scope></search><sort><creationdate>20110727</creationdate><title>Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby</title><author>HUANG YANJI ; HUANG ZHONGLIANG ; DENG CHAOLIANG ; PANG LIPING ; WEI JIANJU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN101525873BB3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2011</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>HUANG YANJI</creatorcontrib><creatorcontrib>HUANG ZHONGLIANG</creatorcontrib><creatorcontrib>DENG CHAOLIANG</creatorcontrib><creatorcontrib>PANG LIPING</creatorcontrib><creatorcontrib>WEI JIANJU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HUANG YANJI</au><au>HUANG ZHONGLIANG</au><au>DENG CHAOLIANG</au><au>PANG LIPING</au><au>WEI JIANJU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby</title><date>2011-07-27</date><risdate>2011</risdate><abstract>The invention relates to a pier hydraulic leveling inner-climbing climbing form and a concrete pouring method thereby. The form consists of a slip form truss, a form system, an operating platform, a hydraulic lifting system and an accuracy control system, wherein two slip form truss girders are crosswise arranged, both ends of the two slip form truss girders are respectively connected with lifting frames, a wreath is in a quadrate or an elliptical shape and is fixed to the lifting frames, a quadrate or an elliptical form is hung and fastened on the wreath, the operating platform is divided into an upper layer and a lower layer which are both fixedly connected with the lifting frames, a hydraulic console is placed on the operating platform and a jack is installed on a crossbeam. The jack is controlled by the hydraulic console to lead the crossbeam to rise, the lifting frames are driven to upwards climb simultaneously with the wreath and the form which are connected with the lifting frames, and the concrete is</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN101525873BB
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T15%3A41%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HUANG%20YANJI&rft.date=2011-07-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN101525873BB%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true