Concrete double-case subsection beam construction method

The invention discloses a construction method of a concrete double-box segment girder, more particularly relates to the construction of the bridge segment girder, comprising the following steps: 1) the segment girder is hoisted to position and an oil-jacked support is installed; 2) a wet seam bracke...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WEI QIYANG, LIU AILIN, LI SHUNQING, TAO JIANSHAN, LI XIONGHUO, GONG HUIZHONG, LIU XINGFU, ZHU WUHUA, QIN SHUNQUAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WEI QIYANG
LIU AILIN
LI SHUNQING
TAO JIANSHAN
LI XIONGHUO
GONG HUIZHONG
LIU XINGFU
ZHU WUHUA
QIN SHUNQUAN
description The invention discloses a construction method of a concrete double-box segment girder, more particularly relates to the construction of the bridge segment girder, comprising the following steps: 1) the segment girder is hoisted to position and an oil-jacked support is installed; 2) a wet seam bracket and an internal template as well as an external template are installed, and wet seam concrete is cast; 3) after the wet seam concrete reaches the requirement of design strength, the internal template and the external template are removed and F6 and F5 are stretched; 4) the thickness of the mat of the oil-jacked support of the midspan segment girder is reduced by 30mm, and other oil-jacked supports are unloaded according to the parabola of degree 4; 5) after F4 to F1 are stretched, the limitation of a bridge fabrication machine to the girder body is released; 6) steel strands B5 to B1 are stretched; 7) a diaphragm plate is cast and a transversal prestress bundle is stretched; and 8) the bridge fabrication machine
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN101435181A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN101435181A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN101435181A3</originalsourceid><addsrcrecordid>eNrjZLBwzs9LLkotSVVIyS9NyknVTU4sTlUoLk0qTk0uyczPU0hKTcxVSM7PKy4pKoWI5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_QwNDE2NTQwtDR2Ni1AAAMw0upg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Concrete double-case subsection beam construction method</title><source>esp@cenet</source><creator>WEI QIYANG ; LIU AILIN ; LI SHUNQING ; TAO JIANSHAN ; LI XIONGHUO ; GONG HUIZHONG ; LIU XINGFU ; ZHU WUHUA ; QIN SHUNQUAN</creator><creatorcontrib>WEI QIYANG ; LIU AILIN ; LI SHUNQING ; TAO JIANSHAN ; LI XIONGHUO ; GONG HUIZHONG ; LIU XINGFU ; ZHU WUHUA ; QIN SHUNQUAN</creatorcontrib><description>The invention discloses a construction method of a concrete double-box segment girder, more particularly relates to the construction of the bridge segment girder, comprising the following steps: 1) the segment girder is hoisted to position and an oil-jacked support is installed; 2) a wet seam bracket and an internal template as well as an external template are installed, and wet seam concrete is cast; 3) after the wet seam concrete reaches the requirement of design strength, the internal template and the external template are removed and F6 and F5 are stretched; 4) the thickness of the mat of the oil-jacked support of the midspan segment girder is reduced by 30mm, and other oil-jacked supports are unloaded according to the parabola of degree 4; 5) after F4 to F1 are stretched, the limitation of a bridge fabrication machine to the girder body is released; 6) steel strands B5 to B1 are stretched; 7) a diaphragm plate is cast and a transversal prestress bundle is stretched; and 8) the bridge fabrication machine</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2009</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20090520&amp;DB=EPODOC&amp;CC=CN&amp;NR=101435181A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20090520&amp;DB=EPODOC&amp;CC=CN&amp;NR=101435181A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WEI QIYANG</creatorcontrib><creatorcontrib>LIU AILIN</creatorcontrib><creatorcontrib>LI SHUNQING</creatorcontrib><creatorcontrib>TAO JIANSHAN</creatorcontrib><creatorcontrib>LI XIONGHUO</creatorcontrib><creatorcontrib>GONG HUIZHONG</creatorcontrib><creatorcontrib>LIU XINGFU</creatorcontrib><creatorcontrib>ZHU WUHUA</creatorcontrib><creatorcontrib>QIN SHUNQUAN</creatorcontrib><title>Concrete double-case subsection beam construction method</title><description>The invention discloses a construction method of a concrete double-box segment girder, more particularly relates to the construction of the bridge segment girder, comprising the following steps: 1) the segment girder is hoisted to position and an oil-jacked support is installed; 2) a wet seam bracket and an internal template as well as an external template are installed, and wet seam concrete is cast; 3) after the wet seam concrete reaches the requirement of design strength, the internal template and the external template are removed and F6 and F5 are stretched; 4) the thickness of the mat of the oil-jacked support of the midspan segment girder is reduced by 30mm, and other oil-jacked supports are unloaded according to the parabola of degree 4; 5) after F4 to F1 are stretched, the limitation of a bridge fabrication machine to the girder body is released; 6) steel strands B5 to B1 are stretched; 7) a diaphragm plate is cast and a transversal prestress bundle is stretched; and 8) the bridge fabrication machine</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2009</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBwzs9LLkotSVVIyS9NyknVTU4sTlUoLk0qTk0uyczPU0hKTcxVSM7PKy4pKoWI5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_QwNDE2NTQwtDR2Ni1AAAMw0upg</recordid><startdate>20090520</startdate><enddate>20090520</enddate><creator>WEI QIYANG</creator><creator>LIU AILIN</creator><creator>LI SHUNQING</creator><creator>TAO JIANSHAN</creator><creator>LI XIONGHUO</creator><creator>GONG HUIZHONG</creator><creator>LIU XINGFU</creator><creator>ZHU WUHUA</creator><creator>QIN SHUNQUAN</creator><scope>EVB</scope></search><sort><creationdate>20090520</creationdate><title>Concrete double-case subsection beam construction method</title><author>WEI QIYANG ; LIU AILIN ; LI SHUNQING ; TAO JIANSHAN ; LI XIONGHUO ; GONG HUIZHONG ; LIU XINGFU ; ZHU WUHUA ; QIN SHUNQUAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN101435181A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2009</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>WEI QIYANG</creatorcontrib><creatorcontrib>LIU AILIN</creatorcontrib><creatorcontrib>LI SHUNQING</creatorcontrib><creatorcontrib>TAO JIANSHAN</creatorcontrib><creatorcontrib>LI XIONGHUO</creatorcontrib><creatorcontrib>GONG HUIZHONG</creatorcontrib><creatorcontrib>LIU XINGFU</creatorcontrib><creatorcontrib>ZHU WUHUA</creatorcontrib><creatorcontrib>QIN SHUNQUAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WEI QIYANG</au><au>LIU AILIN</au><au>LI SHUNQING</au><au>TAO JIANSHAN</au><au>LI XIONGHUO</au><au>GONG HUIZHONG</au><au>LIU XINGFU</au><au>ZHU WUHUA</au><au>QIN SHUNQUAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Concrete double-case subsection beam construction method</title><date>2009-05-20</date><risdate>2009</risdate><abstract>The invention discloses a construction method of a concrete double-box segment girder, more particularly relates to the construction of the bridge segment girder, comprising the following steps: 1) the segment girder is hoisted to position and an oil-jacked support is installed; 2) a wet seam bracket and an internal template as well as an external template are installed, and wet seam concrete is cast; 3) after the wet seam concrete reaches the requirement of design strength, the internal template and the external template are removed and F6 and F5 are stretched; 4) the thickness of the mat of the oil-jacked support of the midspan segment girder is reduced by 30mm, and other oil-jacked supports are unloaded according to the parabola of degree 4; 5) after F4 to F1 are stretched, the limitation of a bridge fabrication machine to the girder body is released; 6) steel strands B5 to B1 are stretched; 7) a diaphragm plate is cast and a transversal prestress bundle is stretched; and 8) the bridge fabrication machine</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN101435181A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Concrete double-case subsection beam construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T20%3A48%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WEI%20QIYANG&rft.date=2009-05-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN101435181A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true