MULTI REEL SYSTEM

A system for lubricating multiple frac valves while allowing the operator to remain out of the red zone. A system of high flow mandrels and valves allows an operator to enter the red zone a minimal number of times. Generally, when using the system, the operator will enter the red zone prior to the f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MEYER, RANDY S, MCKIM, NOEL
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MEYER, RANDY S
MCKIM, NOEL
description A system for lubricating multiple frac valves while allowing the operator to remain out of the red zone. A system of high flow mandrels and valves allows an operator to enter the red zone a minimal number of times. Generally, when using the system, the operator will enter the red zone prior to the fracking operation beginning to connect the various lines to each frac valve and then after the frac job is complete to disconnect the various lines from each frac valve. A high-pressure pump provides lubricant at a sufficient pressure and volume to a high-pressure manifold or high-pressure manifolds. The high-pressure manifolds supply the hose reels through valves located near the manifold. The hose reels in turn are the lines that are connected to each frac valve Using the system, the operator may remain outside of the red zone with the lubricant reservoir, the pump, the high-pressure manifolds, and the hose reels. When a well pad is shut down the operator chooses which frac valve to grease and commands the associated valve on the high-pressure manifold to open. The high-pressure pump is then actuated using the lubricant from the lubricant reservoir the pump increases the lubricant pressure to about 15,000 psi supplying it to at least a first high-pressure manifold. The high-pressure manifold then distributes the lubricant through the open valve to the desired hose reel and then to the frac valve which is inside the red zone. The operator repeats the process until each of the frac valves on the well pad are greased. The various fittings, lines, valves, and manifolds are chosen or manufactured to minimize pressure losses through the system between the high-pressure pump and the frac valve.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA3055026A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA3055026A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA3055026A13</originalsourceid><addsrcrecordid>eNrjZBD0DfUJ8VQIcnX1UQiODA5x9eVhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfHOjsYGpqYGRmaOhsZEKAEA54IdQA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>MULTI REEL SYSTEM</title><source>esp@cenet</source><creator>MEYER, RANDY S ; MCKIM, NOEL</creator><creatorcontrib>MEYER, RANDY S ; MCKIM, NOEL</creatorcontrib><description>A system for lubricating multiple frac valves while allowing the operator to remain out of the red zone. A system of high flow mandrels and valves allows an operator to enter the red zone a minimal number of times. Generally, when using the system, the operator will enter the red zone prior to the fracking operation beginning to connect the various lines to each frac valve and then after the frac job is complete to disconnect the various lines from each frac valve. A high-pressure pump provides lubricant at a sufficient pressure and volume to a high-pressure manifold or high-pressure manifolds. The high-pressure manifolds supply the hose reels through valves located near the manifold. The hose reels in turn are the lines that are connected to each frac valve Using the system, the operator may remain outside of the red zone with the lubricant reservoir, the pump, the high-pressure manifolds, and the hose reels. When a well pad is shut down the operator chooses which frac valve to grease and commands the associated valve on the high-pressure manifold to open. The high-pressure pump is then actuated using the lubricant from the lubricant reservoir the pump increases the lubricant pressure to about 15,000 psi supplying it to at least a first high-pressure manifold. The high-pressure manifold then distributes the lubricant through the open valve to the desired hose reel and then to the frac valve which is inside the red zone. The operator repeats the process until each of the frac valves on the well pad are greased. The various fittings, lines, valves, and manifolds are chosen or manufactured to minimize pressure losses through the system between the high-pressure pump and the frac valve.</description><language>eng ; fre</language><subject>BLASTING ; ENGINEERING ELEMENTS AND UNITS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; LIGHTING ; LUBRICATING ; MECHANICAL ENGINEERING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200311&amp;DB=EPODOC&amp;CC=CA&amp;NR=3055026A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200311&amp;DB=EPODOC&amp;CC=CA&amp;NR=3055026A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MEYER, RANDY S</creatorcontrib><creatorcontrib>MCKIM, NOEL</creatorcontrib><title>MULTI REEL SYSTEM</title><description>A system for lubricating multiple frac valves while allowing the operator to remain out of the red zone. A system of high flow mandrels and valves allows an operator to enter the red zone a minimal number of times. Generally, when using the system, the operator will enter the red zone prior to the fracking operation beginning to connect the various lines to each frac valve and then after the frac job is complete to disconnect the various lines from each frac valve. A high-pressure pump provides lubricant at a sufficient pressure and volume to a high-pressure manifold or high-pressure manifolds. The high-pressure manifolds supply the hose reels through valves located near the manifold. The hose reels in turn are the lines that are connected to each frac valve Using the system, the operator may remain outside of the red zone with the lubricant reservoir, the pump, the high-pressure manifolds, and the hose reels. When a well pad is shut down the operator chooses which frac valve to grease and commands the associated valve on the high-pressure manifold to open. The high-pressure pump is then actuated using the lubricant from the lubricant reservoir the pump increases the lubricant pressure to about 15,000 psi supplying it to at least a first high-pressure manifold. The high-pressure manifold then distributes the lubricant through the open valve to the desired hose reel and then to the frac valve which is inside the red zone. The operator repeats the process until each of the frac valves on the well pad are greased. The various fittings, lines, valves, and manifolds are chosen or manufactured to minimize pressure losses through the system between the high-pressure pump and the frac valve.</description><subject>BLASTING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>LUBRICATING</subject><subject>MECHANICAL ENGINEERING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBD0DfUJ8VQIcnX1UQiODA5x9eVhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfHOjsYGpqYGRmaOhsZEKAEA54IdQA</recordid><startdate>20200311</startdate><enddate>20200311</enddate><creator>MEYER, RANDY S</creator><creator>MCKIM, NOEL</creator><scope>EVB</scope></search><sort><creationdate>20200311</creationdate><title>MULTI REEL SYSTEM</title><author>MEYER, RANDY S ; MCKIM, NOEL</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA3055026A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2020</creationdate><topic>BLASTING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>LUBRICATING</topic><topic>MECHANICAL ENGINEERING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>MEYER, RANDY S</creatorcontrib><creatorcontrib>MCKIM, NOEL</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MEYER, RANDY S</au><au>MCKIM, NOEL</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>MULTI REEL SYSTEM</title><date>2020-03-11</date><risdate>2020</risdate><abstract>A system for lubricating multiple frac valves while allowing the operator to remain out of the red zone. A system of high flow mandrels and valves allows an operator to enter the red zone a minimal number of times. Generally, when using the system, the operator will enter the red zone prior to the fracking operation beginning to connect the various lines to each frac valve and then after the frac job is complete to disconnect the various lines from each frac valve. A high-pressure pump provides lubricant at a sufficient pressure and volume to a high-pressure manifold or high-pressure manifolds. The high-pressure manifolds supply the hose reels through valves located near the manifold. The hose reels in turn are the lines that are connected to each frac valve Using the system, the operator may remain outside of the red zone with the lubricant reservoir, the pump, the high-pressure manifolds, and the hose reels. When a well pad is shut down the operator chooses which frac valve to grease and commands the associated valve on the high-pressure manifold to open. The high-pressure pump is then actuated using the lubricant from the lubricant reservoir the pump increases the lubricant pressure to about 15,000 psi supplying it to at least a first high-pressure manifold. The high-pressure manifold then distributes the lubricant through the open valve to the desired hose reel and then to the frac valve which is inside the red zone. The operator repeats the process until each of the frac valves on the well pad are greased. The various fittings, lines, valves, and manifolds are chosen or manufactured to minimize pressure losses through the system between the high-pressure pump and the frac valve.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; fre
recordid cdi_epo_espacenet_CA3055026A1
source esp@cenet
subjects BLASTING
ENGINEERING ELEMENTS AND UNITS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
LIGHTING
LUBRICATING
MECHANICAL ENGINEERING
THERMAL INSULATION IN GENERAL
WEAPONS
title MULTI REEL SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T18%3A38%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MEYER,%20RANDY%20S&rft.date=2020-03-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA3055026A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true