SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT
A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different d...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | BUSBY, CASEY ROSS |
description | A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA2965450A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA2965450A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA2965450A13</originalsourceid><addsrcrecordid>eNrjZHAIjgwOcfXVUXAMCHAMcgwJDVZw9HNRCHL1cQxxdVHwdQ3x8HdRcPMPUghy9AwGirgH-YcCFTj7h7kGKfg6hvAwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUknhnRyNLM1MTUwNHQ2MilAAAQaIp8Q</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><source>esp@cenet</source><creator>BUSBY, CASEY ROSS</creator><creatorcontrib>BUSBY, CASEY ROSS</creatorcontrib><description>A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.</description><language>eng ; fre</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20181027&DB=EPODOC&CC=CA&NR=2965450A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20181027&DB=EPODOC&CC=CA&NR=2965450A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BUSBY, CASEY ROSS</creatorcontrib><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><description>A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAIjgwOcfXVUXAMCHAMcgwJDVZw9HNRCHL1cQxxdVHwdQ3x8HdRcPMPUghy9AwGirgH-YcCFTj7h7kGKfg6hvAwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUknhnRyNLM1MTUwNHQ2MilAAAQaIp8Q</recordid><startdate>20181027</startdate><enddate>20181027</enddate><creator>BUSBY, CASEY ROSS</creator><scope>EVB</scope></search><sort><creationdate>20181027</creationdate><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><author>BUSBY, CASEY ROSS</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA2965450A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2018</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>BUSBY, CASEY ROSS</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BUSBY, CASEY ROSS</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><date>2018-10-27</date><risdate>2018</risdate><abstract>A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; fre |
recordid | cdi_epo_espacenet_CA2965450A1 |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T19%3A40%3A21IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BUSBY,%20CASEY%20ROSS&rft.date=2018-10-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA2965450A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |