SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT

A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different d...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: BUSBY, CASEY ROSS
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator BUSBY, CASEY ROSS
description A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA2965450A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA2965450A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA2965450A13</originalsourceid><addsrcrecordid>eNrjZHAIjgwOcfXVUXAMCHAMcgwJDVZw9HNRCHL1cQxxdVHwdQ3x8HdRcPMPUghy9AwGirgH-YcCFTj7h7kGKfg6hvAwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUknhnRyNLM1MTUwNHQ2MilAAAQaIp8Q</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><source>esp@cenet</source><creator>BUSBY, CASEY ROSS</creator><creatorcontrib>BUSBY, CASEY ROSS</creatorcontrib><description>A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.</description><language>eng ; fre</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181027&amp;DB=EPODOC&amp;CC=CA&amp;NR=2965450A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181027&amp;DB=EPODOC&amp;CC=CA&amp;NR=2965450A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BUSBY, CASEY ROSS</creatorcontrib><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><description>A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAIjgwOcfXVUXAMCHAMcgwJDVZw9HNRCHL1cQxxdVHwdQ3x8HdRcPMPUghy9AwGirgH-YcCFTj7h7kGKfg6hvAwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUknhnRyNLM1MTUwNHQ2MilAAAQaIp8Q</recordid><startdate>20181027</startdate><enddate>20181027</enddate><creator>BUSBY, CASEY ROSS</creator><scope>EVB</scope></search><sort><creationdate>20181027</creationdate><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><author>BUSBY, CASEY ROSS</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA2965450A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2018</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>BUSBY, CASEY ROSS</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BUSBY, CASEY ROSS</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT</title><date>2018-10-27</date><risdate>2018</risdate><abstract>A ground cover mat is provided for vehicles and equipment to cross over pipes, whether laid below or above ground. The mat includes two footing members spaced at a distance from each other. Each of the footing members define therein multiple peg holes, and each of the peg holes spaced at different distances from an outer edge of a given footing member. The mat also includes one or more span members. Each of the span members are positioned above and removably attached to the two footing members. Each of the one or more span members comprise at least two pegs that protrude downwards, wherein one of the pegs removably fit into a given peg hole defined in one of the two footing members and another one of the pegs removably fit into a given peg hole defined in another one of the two footing members.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; fre
recordid cdi_epo_espacenet_CA2965450A1
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title SYSTEM, APPARATUS AND RELATED METHOD FOR RAISED GROUND COVER MAT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T19%3A40%3A21IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BUSBY,%20CASEY%20ROSS&rft.date=2018-10-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA2965450A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true