A METHOD AND APPARATUS FOR THE PREFERENTIAL PRODUCTION OF FLUIDS FROM HORIZONTAL WELLS
A method of producing hydrocarbon fluid from an underground reservoir through a generally horizontal well having an inlet portion in communication with a pay zone of said formation and a riser portion extending from the inlet portion in said underground reservoir to the surface is disclosed. The und...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | NENNIGER, JOHN |
description | A method of producing hydrocarbon fluid from an underground reservoir through a generally horizontal well having an inlet portion in communication with a pay zone of said formation and a riser portion extending from the inlet portion in said underground reservoir to the surface is disclosed. The underground formation includes at least one fluid in addition to said hydrocarbon fluid. The method includes providing at least one pressure responsive inlet flow control device in the horizontal production well between said inlet portion and said riser portion. The method includes controlling a pressure difference between an upstream side of the pressure responsive inlet flow control device and the underground reservoir by using the pressure responsive inlet flow control device. Then the method includes permitting preferential production of said fluid hydrocarbons as compared to said at least one other fluid. An apparatus for providing a pressure responsive inlet flow control device is also comprehended. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA2707776C</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA2707776C</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA2707776C3</originalsourceid><addsrcrecordid>eNqFyjEKAjEQheE0FqKewbmAIAqmDsmEBLKZkJ24YLMsEivRhfX-mMLe4vHz4FuLq4IO2ZEBFdtSUllx6cFSBnYIKaPFjJG9Cu2QKZo9RSALNhRvmszUgaPsbxS5oQFD6Ldi9ZieS939uhF7i6zdoc7vsS7zdK-v-hm1OsmjlPKiz__FF8WbL-I</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>A METHOD AND APPARATUS FOR THE PREFERENTIAL PRODUCTION OF FLUIDS FROM HORIZONTAL WELLS</title><source>esp@cenet</source><creator>NENNIGER, JOHN</creator><creatorcontrib>NENNIGER, JOHN</creatorcontrib><description>A method of producing hydrocarbon fluid from an underground reservoir through a generally horizontal well having an inlet portion in communication with a pay zone of said formation and a riser portion extending from the inlet portion in said underground reservoir to the surface is disclosed. The underground formation includes at least one fluid in addition to said hydrocarbon fluid. The method includes providing at least one pressure responsive inlet flow control device in the horizontal production well between said inlet portion and said riser portion. The method includes controlling a pressure difference between an upstream side of the pressure responsive inlet flow control device and the underground reservoir by using the pressure responsive inlet flow control device. Then the method includes permitting preferential production of said fluid hydrocarbons as compared to said at least one other fluid. An apparatus for providing a pressure responsive inlet flow control device is also comprehended.</description><language>eng ; fre</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161129&DB=EPODOC&CC=CA&NR=2707776C$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20161129&DB=EPODOC&CC=CA&NR=2707776C$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NENNIGER, JOHN</creatorcontrib><title>A METHOD AND APPARATUS FOR THE PREFERENTIAL PRODUCTION OF FLUIDS FROM HORIZONTAL WELLS</title><description>A method of producing hydrocarbon fluid from an underground reservoir through a generally horizontal well having an inlet portion in communication with a pay zone of said formation and a riser portion extending from the inlet portion in said underground reservoir to the surface is disclosed. The underground formation includes at least one fluid in addition to said hydrocarbon fluid. The method includes providing at least one pressure responsive inlet flow control device in the horizontal production well between said inlet portion and said riser portion. The method includes controlling a pressure difference between an upstream side of the pressure responsive inlet flow control device and the underground reservoir by using the pressure responsive inlet flow control device. Then the method includes permitting preferential production of said fluid hydrocarbons as compared to said at least one other fluid. An apparatus for providing a pressure responsive inlet flow control device is also comprehended.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqFyjEKAjEQheE0FqKewbmAIAqmDsmEBLKZkJ24YLMsEivRhfX-mMLe4vHz4FuLq4IO2ZEBFdtSUllx6cFSBnYIKaPFjJG9Cu2QKZo9RSALNhRvmszUgaPsbxS5oQFD6Ldi9ZieS939uhF7i6zdoc7vsS7zdK-v-hm1OsmjlPKiz__FF8WbL-I</recordid><startdate>20161129</startdate><enddate>20161129</enddate><creator>NENNIGER, JOHN</creator><scope>EVB</scope></search><sort><creationdate>20161129</creationdate><title>A METHOD AND APPARATUS FOR THE PREFERENTIAL PRODUCTION OF FLUIDS FROM HORIZONTAL WELLS</title><author>NENNIGER, JOHN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA2707776C3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2016</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>NENNIGER, JOHN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NENNIGER, JOHN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>A METHOD AND APPARATUS FOR THE PREFERENTIAL PRODUCTION OF FLUIDS FROM HORIZONTAL WELLS</title><date>2016-11-29</date><risdate>2016</risdate><abstract>A method of producing hydrocarbon fluid from an underground reservoir through a generally horizontal well having an inlet portion in communication with a pay zone of said formation and a riser portion extending from the inlet portion in said underground reservoir to the surface is disclosed. The underground formation includes at least one fluid in addition to said hydrocarbon fluid. The method includes providing at least one pressure responsive inlet flow control device in the horizontal production well between said inlet portion and said riser portion. The method includes controlling a pressure difference between an upstream side of the pressure responsive inlet flow control device and the underground reservoir by using the pressure responsive inlet flow control device. Then the method includes permitting preferential production of said fluid hydrocarbons as compared to said at least one other fluid. An apparatus for providing a pressure responsive inlet flow control device is also comprehended.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; fre |
recordid | cdi_epo_espacenet_CA2707776C |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | A METHOD AND APPARATUS FOR THE PREFERENTIAL PRODUCTION OF FLUIDS FROM HORIZONTAL WELLS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T09%3A34%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NENNIGER,%20JOHN&rft.date=2016-11-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA2707776C%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |