ARRANGEMENT FOR EXTRACTING EXTRACTION PRODUCTS IN UNDERGROUND MINING IN CAVING

In the arrangement in accordance with the invention for extracting extraction products in caving in which the extraction product is extracted downwards through an extraction funnel (10) into an extraction path (11) and from this is transferred onto an extraction conveyor arranged in a conveyor path,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DELGADO, JUAN, CARRENO VALDES, JAIME HERNAN, GEISTER BUHLMANN, FERNANDO ARTURO, LETELIER PARGA, PABLO ANTONIO, ENCINA MONTENEGRO, VICTOR RAUL, HAHN, DETLEF, STEINBERG, JENS, BRUGGEMANN, REINHOLD, LANZ, HANS PETER, MARTIN, HARRY, HERRMANN, FRANK, TUMPNER, HANS
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DELGADO, JUAN
CARRENO VALDES, JAIME HERNAN
GEISTER BUHLMANN, FERNANDO ARTURO
LETELIER PARGA, PABLO ANTONIO
ENCINA MONTENEGRO, VICTOR RAUL
HAHN, DETLEF
STEINBERG, JENS
BRUGGEMANN, REINHOLD
LANZ, HANS PETER
MARTIN, HARRY
HERRMANN, FRANK
TUMPNER, HANS
description In the arrangement in accordance with the invention for extracting extraction products in caving in which the extraction product is extracted downwards through an extraction funnel (10) into an extraction path (11) and from this is transferred onto an extraction conveyor arranged in a conveyor path, in which arrangement the extraction path extends transversely between the conveyor path (13) and an auxiliary path (12) parallel to this, a loading ramp (16) is arranged in the extraction path (11) which essentially forms a ramp surface orientated transversely to the conveying direction of the extraction conveyor and inclined towards it. In order to be able to control the quantity of extraction material extracted through the extraction funnel and to be able to clear the extraction path in a particularly simple manner if it is blocked with extraction material, the invention envisages that the extraction path is provided with a rail guidance (19) firmly attached to the bottom (15) and extending in the area between the auxiliary path and the conveying path, on which the loading ramploading ramp (16) is guided and along which it can be moved by means of a displacement drive (20) in the direction of the conveyor path and in the opposite direction.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA2621183C</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA2621183C</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA2621183C3</originalsourceid><addsrcrecordid>eNrjZPBzDApy9HN39XX1C1Fw8w9ScI0ICXJ0DvH0c4cz_f0UAoL8XUKdQ4IVPP0UQv1cXIPcg_yBtIKvpx9IJVDU2TEMyOJhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHOjkZmRoaGFsbOxoRVAACROy3n</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>ARRANGEMENT FOR EXTRACTING EXTRACTION PRODUCTS IN UNDERGROUND MINING IN CAVING</title><source>esp@cenet</source><creator>DELGADO, JUAN ; CARRENO VALDES, JAIME HERNAN ; GEISTER BUHLMANN, FERNANDO ARTURO ; LETELIER PARGA, PABLO ANTONIO ; ENCINA MONTENEGRO, VICTOR RAUL ; HAHN, DETLEF ; STEINBERG, JENS ; BRUGGEMANN, REINHOLD ; LANZ, HANS PETER ; MARTIN, HARRY ; HERRMANN, FRANK ; TUMPNER, HANS</creator><creatorcontrib>DELGADO, JUAN ; CARRENO VALDES, JAIME HERNAN ; GEISTER BUHLMANN, FERNANDO ARTURO ; LETELIER PARGA, PABLO ANTONIO ; ENCINA MONTENEGRO, VICTOR RAUL ; HAHN, DETLEF ; STEINBERG, JENS ; BRUGGEMANN, REINHOLD ; LANZ, HANS PETER ; MARTIN, HARRY ; HERRMANN, FRANK ; TUMPNER, HANS</creatorcontrib><description>In the arrangement in accordance with the invention for extracting extraction products in caving in which the extraction product is extracted downwards through an extraction funnel (10) into an extraction path (11) and from this is transferred onto an extraction conveyor arranged in a conveyor path, in which arrangement the extraction path extends transversely between the conveyor path (13) and an auxiliary path (12) parallel to this, a loading ramp (16) is arranged in the extraction path (11) which essentially forms a ramp surface orientated transversely to the conveying direction of the extraction conveyor and inclined towards it. In order to be able to control the quantity of extraction material extracted through the extraction funnel and to be able to clear the extraction path in a particularly simple manner if it is blocked with extraction material, the invention envisages that the extraction path is provided with a rail guidance (19) firmly attached to the bottom (15) and extending in the area between the auxiliary path and the conveying path, on which the loading ramploading ramp (16) is guided and along which it can be moved by means of a displacement drive (20) in the direction of the conveyor path and in the opposite direction.</description><language>eng ; fre</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; MINING OR QUARRYING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; TUNNELS</subject><creationdate>2014</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20140520&amp;DB=EPODOC&amp;CC=CA&amp;NR=2621183C$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20140520&amp;DB=EPODOC&amp;CC=CA&amp;NR=2621183C$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DELGADO, JUAN</creatorcontrib><creatorcontrib>CARRENO VALDES, JAIME HERNAN</creatorcontrib><creatorcontrib>GEISTER BUHLMANN, FERNANDO ARTURO</creatorcontrib><creatorcontrib>LETELIER PARGA, PABLO ANTONIO</creatorcontrib><creatorcontrib>ENCINA MONTENEGRO, VICTOR RAUL</creatorcontrib><creatorcontrib>HAHN, DETLEF</creatorcontrib><creatorcontrib>STEINBERG, JENS</creatorcontrib><creatorcontrib>BRUGGEMANN, REINHOLD</creatorcontrib><creatorcontrib>LANZ, HANS PETER</creatorcontrib><creatorcontrib>MARTIN, HARRY</creatorcontrib><creatorcontrib>HERRMANN, FRANK</creatorcontrib><creatorcontrib>TUMPNER, HANS</creatorcontrib><title>ARRANGEMENT FOR EXTRACTING EXTRACTION PRODUCTS IN UNDERGROUND MINING IN CAVING</title><description>In the arrangement in accordance with the invention for extracting extraction products in caving in which the extraction product is extracted downwards through an extraction funnel (10) into an extraction path (11) and from this is transferred onto an extraction conveyor arranged in a conveyor path, in which arrangement the extraction path extends transversely between the conveyor path (13) and an auxiliary path (12) parallel to this, a loading ramp (16) is arranged in the extraction path (11) which essentially forms a ramp surface orientated transversely to the conveying direction of the extraction conveyor and inclined towards it. In order to be able to control the quantity of extraction material extracted through the extraction funnel and to be able to clear the extraction path in a particularly simple manner if it is blocked with extraction material, the invention envisages that the extraction path is provided with a rail guidance (19) firmly attached to the bottom (15) and extending in the area between the auxiliary path and the conveying path, on which the loading ramploading ramp (16) is guided and along which it can be moved by means of a displacement drive (20) in the direction of the conveyor path and in the opposite direction.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2014</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPBzDApy9HN39XX1C1Fw8w9ScI0ICXJ0DvH0c4cz_f0UAoL8XUKdQ4IVPP0UQv1cXIPcg_yBtIKvpx9IJVDU2TEMyOJhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHOjkZmRoaGFsbOxoRVAACROy3n</recordid><startdate>20140520</startdate><enddate>20140520</enddate><creator>DELGADO, JUAN</creator><creator>CARRENO VALDES, JAIME HERNAN</creator><creator>GEISTER BUHLMANN, FERNANDO ARTURO</creator><creator>LETELIER PARGA, PABLO ANTONIO</creator><creator>ENCINA MONTENEGRO, VICTOR RAUL</creator><creator>HAHN, DETLEF</creator><creator>STEINBERG, JENS</creator><creator>BRUGGEMANN, REINHOLD</creator><creator>LANZ, HANS PETER</creator><creator>MARTIN, HARRY</creator><creator>HERRMANN, FRANK</creator><creator>TUMPNER, HANS</creator><scope>EVB</scope></search><sort><creationdate>20140520</creationdate><title>ARRANGEMENT FOR EXTRACTING EXTRACTION PRODUCTS IN UNDERGROUND MINING IN CAVING</title><author>DELGADO, JUAN ; CARRENO VALDES, JAIME HERNAN ; GEISTER BUHLMANN, FERNANDO ARTURO ; LETELIER PARGA, PABLO ANTONIO ; ENCINA MONTENEGRO, VICTOR RAUL ; HAHN, DETLEF ; STEINBERG, JENS ; BRUGGEMANN, REINHOLD ; LANZ, HANS PETER ; MARTIN, HARRY ; HERRMANN, FRANK ; TUMPNER, HANS</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA2621183C3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2014</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DELGADO, JUAN</creatorcontrib><creatorcontrib>CARRENO VALDES, JAIME HERNAN</creatorcontrib><creatorcontrib>GEISTER BUHLMANN, FERNANDO ARTURO</creatorcontrib><creatorcontrib>LETELIER PARGA, PABLO ANTONIO</creatorcontrib><creatorcontrib>ENCINA MONTENEGRO, VICTOR RAUL</creatorcontrib><creatorcontrib>HAHN, DETLEF</creatorcontrib><creatorcontrib>STEINBERG, JENS</creatorcontrib><creatorcontrib>BRUGGEMANN, REINHOLD</creatorcontrib><creatorcontrib>LANZ, HANS PETER</creatorcontrib><creatorcontrib>MARTIN, HARRY</creatorcontrib><creatorcontrib>HERRMANN, FRANK</creatorcontrib><creatorcontrib>TUMPNER, HANS</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DELGADO, JUAN</au><au>CARRENO VALDES, JAIME HERNAN</au><au>GEISTER BUHLMANN, FERNANDO ARTURO</au><au>LETELIER PARGA, PABLO ANTONIO</au><au>ENCINA MONTENEGRO, VICTOR RAUL</au><au>HAHN, DETLEF</au><au>STEINBERG, JENS</au><au>BRUGGEMANN, REINHOLD</au><au>LANZ, HANS PETER</au><au>MARTIN, HARRY</au><au>HERRMANN, FRANK</au><au>TUMPNER, HANS</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>ARRANGEMENT FOR EXTRACTING EXTRACTION PRODUCTS IN UNDERGROUND MINING IN CAVING</title><date>2014-05-20</date><risdate>2014</risdate><abstract>In the arrangement in accordance with the invention for extracting extraction products in caving in which the extraction product is extracted downwards through an extraction funnel (10) into an extraction path (11) and from this is transferred onto an extraction conveyor arranged in a conveyor path, in which arrangement the extraction path extends transversely between the conveyor path (13) and an auxiliary path (12) parallel to this, a loading ramp (16) is arranged in the extraction path (11) which essentially forms a ramp surface orientated transversely to the conveying direction of the extraction conveyor and inclined towards it. In order to be able to control the quantity of extraction material extracted through the extraction funnel and to be able to clear the extraction path in a particularly simple manner if it is blocked with extraction material, the invention envisages that the extraction path is provided with a rail guidance (19) firmly attached to the bottom (15) and extending in the area between the auxiliary path and the conveying path, on which the loading ramploading ramp (16) is guided and along which it can be moved by means of a displacement drive (20) in the direction of the conveyor path and in the opposite direction.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; fre
recordid cdi_epo_espacenet_CA2621183C
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
MINING OR QUARRYING
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SHAFTS
TUNNELS
title ARRANGEMENT FOR EXTRACTING EXTRACTION PRODUCTS IN UNDERGROUND MINING IN CAVING
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T17%3A50%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DELGADO,%20JUAN&rft.date=2014-05-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA2621183C%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true