METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES

In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FORISEK, ISTVAN, STUBER, GYORGY, BARSI, KAROLY, DOROMBOZI, LASZLO, KUBURCZIK, GYULA
Format: Patent
Sprache:eng ; fre
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator FORISEK, ISTVAN
STUBER, GYORGY
BARSI, KAROLY
DOROMBOZI, LASZLO
KUBURCZIK, GYULA
description In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA1135731A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA1135731A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA1135731A3</originalsourceid><addsrcrecordid>eNrjZLDwdQ3x8HdR8HdT8PX08_RzV_BwdQyLVHD2d_RRCHZ19A1W8PRTCAn3V_APUvD1D3JVcHL1c_ZwDeZhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHOjoaGxqbmxoaOxoRVAACH2ib1</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><source>esp@cenet</source><creator>FORISEK, ISTVAN ; STUBER, GYORGY ; BARSI, KAROLY ; DOROMBOZI, LASZLO ; KUBURCZIK, GYULA</creator><creatorcontrib>FORISEK, ISTVAN ; STUBER, GYORGY ; BARSI, KAROLY ; DOROMBOZI, LASZLO ; KUBURCZIK, GYULA</creatorcontrib><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><language>eng ; fre</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>1982</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19821116&amp;DB=EPODOC&amp;CC=CA&amp;NR=1135731A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19821116&amp;DB=EPODOC&amp;CC=CA&amp;NR=1135731A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FORISEK, ISTVAN</creatorcontrib><creatorcontrib>STUBER, GYORGY</creatorcontrib><creatorcontrib>BARSI, KAROLY</creatorcontrib><creatorcontrib>DOROMBOZI, LASZLO</creatorcontrib><creatorcontrib>KUBURCZIK, GYULA</creatorcontrib><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1982</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwdQ3x8HdR8HdT8PX08_RzV_BwdQyLVHD2d_RRCHZ19A1W8PRTCAn3V_APUvD1D3JVcHL1c_ZwDeZhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHOjoaGxqbmxoaOxoRVAACH2ib1</recordid><startdate>19821116</startdate><enddate>19821116</enddate><creator>FORISEK, ISTVAN</creator><creator>STUBER, GYORGY</creator><creator>BARSI, KAROLY</creator><creator>DOROMBOZI, LASZLO</creator><creator>KUBURCZIK, GYULA</creator><scope>EVB</scope></search><sort><creationdate>19821116</creationdate><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><author>FORISEK, ISTVAN ; STUBER, GYORGY ; BARSI, KAROLY ; DOROMBOZI, LASZLO ; KUBURCZIK, GYULA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA1135731A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>1982</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>FORISEK, ISTVAN</creatorcontrib><creatorcontrib>STUBER, GYORGY</creatorcontrib><creatorcontrib>BARSI, KAROLY</creatorcontrib><creatorcontrib>DOROMBOZI, LASZLO</creatorcontrib><creatorcontrib>KUBURCZIK, GYULA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FORISEK, ISTVAN</au><au>STUBER, GYORGY</au><au>BARSI, KAROLY</au><au>DOROMBOZI, LASZLO</au><au>KUBURCZIK, GYULA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><date>1982-11-16</date><risdate>1982</risdate><abstract>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; fre
recordid cdi_epo_espacenet_CA1135731A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T02%3A37%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FORISEK,%20ISTVAN&rft.date=1982-11-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA1135731A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true