METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES
In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench,...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | FORISEK, ISTVAN STUBER, GYORGY BARSI, KAROLY DOROMBOZI, LASZLO KUBURCZIK, GYULA |
description | In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CA1135731A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CA1135731A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CA1135731A3</originalsourceid><addsrcrecordid>eNrjZLDwdQ3x8HdR8HdT8PX08_RzV_BwdQyLVHD2d_RRCHZ19A1W8PRTCAn3V_APUvD1D3JVcHL1c_ZwDeZhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHOjoaGxqbmxoaOxoRVAACH2ib1</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><source>esp@cenet</source><creator>FORISEK, ISTVAN ; STUBER, GYORGY ; BARSI, KAROLY ; DOROMBOZI, LASZLO ; KUBURCZIK, GYULA</creator><creatorcontrib>FORISEK, ISTVAN ; STUBER, GYORGY ; BARSI, KAROLY ; DOROMBOZI, LASZLO ; KUBURCZIK, GYULA</creatorcontrib><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><language>eng ; fre</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>1982</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19821116&DB=EPODOC&CC=CA&NR=1135731A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19821116&DB=EPODOC&CC=CA&NR=1135731A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FORISEK, ISTVAN</creatorcontrib><creatorcontrib>STUBER, GYORGY</creatorcontrib><creatorcontrib>BARSI, KAROLY</creatorcontrib><creatorcontrib>DOROMBOZI, LASZLO</creatorcontrib><creatorcontrib>KUBURCZIK, GYULA</creatorcontrib><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1982</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwdQ3x8HdR8HdT8PX08_RzV_BwdQyLVHD2d_RRCHZ19A1W8PRTCAn3V_APUvD1D3JVcHL1c_ZwDeZhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHOjoaGxqbmxoaOxoRVAACH2ib1</recordid><startdate>19821116</startdate><enddate>19821116</enddate><creator>FORISEK, ISTVAN</creator><creator>STUBER, GYORGY</creator><creator>BARSI, KAROLY</creator><creator>DOROMBOZI, LASZLO</creator><creator>KUBURCZIK, GYULA</creator><scope>EVB</scope></search><sort><creationdate>19821116</creationdate><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><author>FORISEK, ISTVAN ; STUBER, GYORGY ; BARSI, KAROLY ; DOROMBOZI, LASZLO ; KUBURCZIK, GYULA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CA1135731A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>1982</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>FORISEK, ISTVAN</creatorcontrib><creatorcontrib>STUBER, GYORGY</creatorcontrib><creatorcontrib>BARSI, KAROLY</creatorcontrib><creatorcontrib>DOROMBOZI, LASZLO</creatorcontrib><creatorcontrib>KUBURCZIK, GYULA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FORISEK, ISTVAN</au><au>STUBER, GYORGY</au><au>BARSI, KAROLY</au><au>DOROMBOZI, LASZLO</au><au>KUBURCZIK, GYULA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES</title><date>1982-11-16</date><risdate>1982</risdate><abstract>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60 % by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline -earth metals, to which ceramic aggregates of large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30 % of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10 % of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; fre |
recordid | cdi_epo_espacenet_CA1135731A |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | METHOD OF MINING HEAVY COAL SEAMS IN TWO OR MORE BENCHES |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T02%3A37%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FORISEK,%20ISTVAN&rft.date=1982-11-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECA1135731A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |