Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície
A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | por |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LOUIS FARGHEON PHILIPPE ESPINASSE THOMAS GUILBAUD TEGWEN DE KERDANET |
description | A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_BRPI0907982A2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>BRPI0907982A2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_BRPI0907982A23</originalsourceid><addsrcrecordid>eNqNjT0KwkAQhdNYiHqHwV4IsVBLFUULQcQ-THYnuJLsLPtzB-9hIRaeYi_mRj2A1bx5vPe9fnY7xKdnySAJlHYeG4yPeP_8oUUQ3ASN4ELVolXXJNEJ0pK0JzBoERi8Re0M2-Sk1kVJywJtxZo8O0hJ27GgDrrbYUgk-NJdMGTr-BKKhlmvxsbR6HcH2Xi7Oa93EzJckjOYVsmXq9Nxny_y2WJeLIvpX6E3NSNPiw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><source>esp@cenet</source><creator>LOUIS FARGHEON ; PHILIPPE ESPINASSE ; THOMAS GUILBAUD ; TEGWEN DE KERDANET</creator><creatorcontrib>LOUIS FARGHEON ; PHILIPPE ESPINASSE ; THOMAS GUILBAUD ; TEGWEN DE KERDANET</creatorcontrib><description>A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.</description><language>por</language><subject>BLASTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; ENGINEERING ELEMENTS AND UNITS ; FIXED CONSTRUCTIONS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PIPES ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20150804&DB=EPODOC&CC=BR&NR=PI0907982A2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20150804&DB=EPODOC&CC=BR&NR=PI0907982A2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LOUIS FARGHEON</creatorcontrib><creatorcontrib>PHILIPPE ESPINASSE</creatorcontrib><creatorcontrib>THOMAS GUILBAUD</creatorcontrib><creatorcontrib>TEGWEN DE KERDANET</creatorcontrib><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><description>A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.</description><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PIPES</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjT0KwkAQhdNYiHqHwV4IsVBLFUULQcQ-THYnuJLsLPtzB-9hIRaeYi_mRj2A1bx5vPe9fnY7xKdnySAJlHYeG4yPeP_8oUUQ3ASN4ELVolXXJNEJ0pK0JzBoERi8Re0M2-Sk1kVJywJtxZo8O0hJ27GgDrrbYUgk-NJdMGTr-BKKhlmvxsbR6HcH2Xi7Oa93EzJckjOYVsmXq9Nxny_y2WJeLIvpX6E3NSNPiw</recordid><startdate>20150804</startdate><enddate>20150804</enddate><creator>LOUIS FARGHEON</creator><creator>PHILIPPE ESPINASSE</creator><creator>THOMAS GUILBAUD</creator><creator>TEGWEN DE KERDANET</creator><scope>EVB</scope></search><sort><creationdate>20150804</creationdate><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><author>LOUIS FARGHEON ; PHILIPPE ESPINASSE ; THOMAS GUILBAUD ; TEGWEN DE KERDANET</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_BRPI0907982A23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>por</language><creationdate>2015</creationdate><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PIPES</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>LOUIS FARGHEON</creatorcontrib><creatorcontrib>PHILIPPE ESPINASSE</creatorcontrib><creatorcontrib>THOMAS GUILBAUD</creatorcontrib><creatorcontrib>TEGWEN DE KERDANET</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LOUIS FARGHEON</au><au>PHILIPPE ESPINASSE</au><au>THOMAS GUILBAUD</au><au>TEGWEN DE KERDANET</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><date>2015-08-04</date><risdate>2015</risdate><abstract>A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | por |
recordid | cdi_epo_espacenet_BRPI0907982A2 |
source | esp@cenet |
subjects | BLASTING EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING ENGINEERING ELEMENTS AND UNITS FIXED CONSTRUCTIONS GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS HEATING JOINTS OR FITTINGS FOR PIPES LIGHTING MEANS FOR THERMAL INSULATION IN GENERAL MECHANICAL ENGINEERING MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS PIPES SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING THERMAL INSULATION IN GENERAL WEAPONS |
title | Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T19%3A43%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LOUIS%20FARGHEON&rft.date=2015-08-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EBRPI0907982A2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |