Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície

A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LOUIS FARGHEON, PHILIPPE ESPINASSE, THOMAS GUILBAUD, TEGWEN DE KERDANET
Format: Patent
Sprache:por
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LOUIS FARGHEON
PHILIPPE ESPINASSE
THOMAS GUILBAUD
TEGWEN DE KERDANET
description A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_BRPI0907982A2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>BRPI0907982A2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_BRPI0907982A23</originalsourceid><addsrcrecordid>eNqNjT0KwkAQhdNYiHqHwV4IsVBLFUULQcQ-THYnuJLsLPtzB-9hIRaeYi_mRj2A1bx5vPe9fnY7xKdnySAJlHYeG4yPeP_8oUUQ3ASN4ELVolXXJNEJ0pK0JzBoERi8Re0M2-Sk1kVJywJtxZo8O0hJ27GgDrrbYUgk-NJdMGTr-BKKhlmvxsbR6HcH2Xi7Oa93EzJckjOYVsmXq9Nxny_y2WJeLIvpX6E3NSNPiw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><source>esp@cenet</source><creator>LOUIS FARGHEON ; PHILIPPE ESPINASSE ; THOMAS GUILBAUD ; TEGWEN DE KERDANET</creator><creatorcontrib>LOUIS FARGHEON ; PHILIPPE ESPINASSE ; THOMAS GUILBAUD ; TEGWEN DE KERDANET</creatorcontrib><description>A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.</description><language>por</language><subject>BLASTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; ENGINEERING ELEMENTS AND UNITS ; FIXED CONSTRUCTIONS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PIPES ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150804&amp;DB=EPODOC&amp;CC=BR&amp;NR=PI0907982A2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150804&amp;DB=EPODOC&amp;CC=BR&amp;NR=PI0907982A2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LOUIS FARGHEON</creatorcontrib><creatorcontrib>PHILIPPE ESPINASSE</creatorcontrib><creatorcontrib>THOMAS GUILBAUD</creatorcontrib><creatorcontrib>TEGWEN DE KERDANET</creatorcontrib><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><description>A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.</description><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PIPES</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjT0KwkAQhdNYiHqHwV4IsVBLFUULQcQ-THYnuJLsLPtzB-9hIRaeYi_mRj2A1bx5vPe9fnY7xKdnySAJlHYeG4yPeP_8oUUQ3ASN4ELVolXXJNEJ0pK0JzBoERi8Re0M2-Sk1kVJywJtxZo8O0hJ27GgDrrbYUgk-NJdMGTr-BKKhlmvxsbR6HcH2Xi7Oa93EzJckjOYVsmXq9Nxny_y2WJeLIvpX6E3NSNPiw</recordid><startdate>20150804</startdate><enddate>20150804</enddate><creator>LOUIS FARGHEON</creator><creator>PHILIPPE ESPINASSE</creator><creator>THOMAS GUILBAUD</creator><creator>TEGWEN DE KERDANET</creator><scope>EVB</scope></search><sort><creationdate>20150804</creationdate><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><author>LOUIS FARGHEON ; PHILIPPE ESPINASSE ; THOMAS GUILBAUD ; TEGWEN DE KERDANET</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_BRPI0907982A23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>por</language><creationdate>2015</creationdate><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PIPES</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>LOUIS FARGHEON</creatorcontrib><creatorcontrib>PHILIPPE ESPINASSE</creatorcontrib><creatorcontrib>THOMAS GUILBAUD</creatorcontrib><creatorcontrib>TEGWEN DE KERDANET</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LOUIS FARGHEON</au><au>PHILIPPE ESPINASSE</au><au>THOMAS GUILBAUD</au><au>TEGWEN DE KERDANET</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície</title><date>2015-08-04</date><risdate>2015</risdate><abstract>A method of installing an underwater riser includes anchoring an installation to the seabed; coupling a tubular pipe to the installation; equipping the installation with a submersible float; submerging the float and the pipe, while the float and the pipe are being held from a surface vessel; a cable and a return device are installed on the seabed installation so that the cable can be connected to the pipe; attaching a submerged hauling buoy to the hauling cable; then removing ballast from the float in order to compensate for the tensile forces corresponding to the weight of the float and the pipe and to some of the load applied to the cable; and finally, anchoring of the hauling buoy to the installation and gradually releasing the float.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language por
recordid cdi_epo_espacenet_BRPI0907982A2
source esp@cenet
subjects BLASTING
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
ENGINEERING ELEMENTS AND UNITS
FIXED CONSTRUCTIONS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
PIPES
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
WEAPONS
title Método de instalação de uma coluna submarijna ascendente para o transporte de hidrocarbonetos entre um fundo do mar e uma superfície
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T19%3A43%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LOUIS%20FARGHEON&rft.date=2015-08-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EBRPI0907982A2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true