Determination of a unifying production metric

A method includes transmitting instructions to the first machine to perform a first task defined by the worksite plan, and transmitting instructions to the second machine to perform a second task defined by the worksite plan, the second task being different from the first task. A first production me...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DECLERK, Allen J, WHITING, Mark W, BRICKNER, Chad T, BOMER, Bradley K
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method includes transmitting instructions to the first machine to perform a first task defined by the worksite plan, and transmitting instructions to the second machine to perform a second task defined by the worksite plan, the second task being different from the first task. A first production metric is received from a first sensor associated with the first machine during execution of the first task, and A second production metric is received from a second sensor associated with the second machine during execution of the second task, the second production metric being different from the first production metric. A percentage of completion of the worksite plan is defined based on a unifying production metric that is determined based at least in part on the first production metric and the second production metric.